Central Reserve Police Force - Gujarat

45115074 providing and utilization service of minimum wages labour hire through tender for day to day repair and maintenance work of the residential and non residential buildings at the gc crpf gandhinagar, 382042...

Forests and Environment Department - Gujarat

45106752 forestry related works in different ranges of waghodia and sinor ranges of vadodara district social forestry division,vadodara; 1 rate for providing of good qualty soil( earth) in own vehicle at the nursery place one tractor trolley (3.50 cmt) 2 rate for providing of good quality organic fertilizer / dung based manure in own vehicle at the nursery place one tractor trolley (3.50 cmt) 3 rate for transportation of plants/rescue cages and other material – tata 407 tempo 0 to 5 km per trip 5 to 10 km per trip 10 to 15 km per trip 15 to 20 km per trip 20 to 30 km per trip 30 to 40 km per trip 40 to 50 km per trip 9 rate for transportation of plants/rescue cages and other material – four wheel truck per trip 0 to 5 km per trip 5 to 10 km per trip 10 to 15 km per trip 15 to 20 km per trip 20 to 30 km per trip 30 to 40 km per trip 40 to 50 km per trip 10 rate for transportation of plants/rescue cages and other material – eicher tempo 0 to 5 km per trip 5 to 10 km per trip 10 to 15 km per trip 15 to 20 km per trip 20 to 30 km per trip 30 to 40 km per trip 40 to 50 km per trip 25 11 rate for transportation of plants/rescue cages and other material – tractor 0 to 5 km per trip 5 to 10 km per trip 10 to 15 km per trip 15 to 20 km per trip 20 to 30 km per trip 30 to 40 km per trip 40 to 50 km per trip 12 preparing iron board form 18 guage sheet and 1.5x2 angle 7 seet high and size 4.3 feet including welding fitting on site painitng etc complete for plantantion per board 13 diesel machine charge for watering per hour 14 rate for providing water tanker having 4000 liter water in nursery and at place of vavetar plot upto 5.00 kms 1 round 15 from 5 to 10 km 1 round 16 from 10 to 15 km 1 round 17 from 15 to 20 km 1 round 18 from 20 to 25 km 1 round 19 from 25 to 30 km 1 round 20 from 30 to 40 km 1 round 21 labour charges for making tol ropa vavetar including filling warmy compost, dap, gipsam, khatar etc duly mixed in 1x1x1mt khada (excluding materials) ropa dith 22 rate of providing mulching material (wheat/millate or other straw) in own vehicle at plantation place per kg 23 labour charges for transfer of plants from 10x20 p.bags to 15x25 p.bags per plant 24 labour charges for transfer of plants from 10x20 p.bags to 20x30 p.bags per plant 25 labour charges for transfer of plants from 10x20 p.bags to 30x40 p.bags per plant...

Gujarat Maritime Board - Gujarat

45105341 tender for architectural service for the construction of new school building for students of labour working in the ship recycling yard, alang....

Nagar Palika Nigam - Gujarat

45085491 tender for work of purchase of pressure pipe of various equipment in underground sewerage branch of kathlal nagar palika. purchase of cable coloum. repairing of led light. purchase of pesticides and equipments. procurement of new tires and tubes for sanitary and underground sewerage vehicles of kathlal municipality. purchasing work of chlorine in animal husbandry branch of tarar municipality. labour and other works....

Uttar Gujarat Vij Company Limited - Gujarat

45084780 tender for labour work for providing double coating on 34/55 mm2 conductor using 2mm thick xlpe coating inner side & 1.2 mm thick pvc coating outer side of conductor for all sdn under deesa 01 division...

Saurashtra University - Gujarat

45076461 tender for two year repairs and maintenance work of electrical (only labour work) at saurashtra university, rajkot. r.o. plant two year comprehensive maintenance contract at saurashtra university, rajkot...

Jamnagar Municipal Corporation - Gujarat

45070970 annual contract for labour work for sweeping & cleaning of all roads, cleaning of swd & pucca gutter and road side jungle cutting including door to door garbage collection day to day for phase ii| for the year 2024 2025...

Jamnagar Municipal Corporation - Gujarat

45070969 annual contract for labour work for sweeping & cleaning of all roads, cleaning of swd & pucca gutter and road side jungle cutting including door to door garbage collection day to day for phase ii for the year 2024 2025...

Department Of Education - Gujarat

45069688 two year repair and maintenance work of electrical (only labour work) as per the requirement in university campus buildings at saurashtra university, rajkot....

Road And Building Department - Gujarat

45069642 o.s. to 30 judges bunglow at bodakdev, ahmedabad. (providing and give a services of supplying manpower of plumber, mistry, kadiya, suthar and labour for one year.) (year 2024 25)...

Road And Building Department - Gujarat

45069480 o.s. to e1 and e2 judicial officer (satyamev judicial appartment) at bodakdev, ahmedabad. (providing and give a service of supplying manpower of plumber, mistry, kadiya, suthar and labour for one year. (year 2024 25)...

Private Company - Gujarat

45064865 tender for annual contract for labour work for sweeping & cleaning of all roads, cleaning of swd & pucca gutter and road side jungle cutting including door to door garbage collection day to day for the year 2024 2025 for gidc phase 2 and phase 3 separately....

Arcelor Mittal Nippon Steel India Limited - Gujarat

45051234 tender for 2000156189 10 20 slag loading and shifting with transport 000156189 10 10 10 slag loading and shifting with transport 1 to email : gopal.ameta@amns.in contact : name : gopal ameta item details : job title: sow slag loading and shifting (with transport) 2025 spr no 20001516189 scope of work vendor technical description unit total quantity corex slag management from source to ton 286,800 export yard (with trasportaion) corex slag management from source to ton 430,200 domastic (without transportaion) 1. granulated slag shifting from sgp to designated dumping yard. average of 1900 mt/day. max of 2200 mt/day. 2. re arranging and heaping of slag at corex site area. if dumping space available storage at sgp yard to be avoided. 3. spillage slag during transit on road to be cleaned regularly on day to day basis as per spillage on road. 4. cleaning and disposal of carry over (granulated) slag from settling pond <(>&<)> clarifier ponds. 5. dry pit cleaning and dry pit slag shifting to the designated dumping yard as and when required. presently 12% dry slag being generated on and average. in case sgp breakdown dry pit will be operated for 1 2 taps continuously. vender should have sufficient equipment’s and manpower to manage such scenarios. 6. cleaning of hot metal and slag from dry pits during emergency. 7. shifting other solid waste like drs dust, cast house zero meter area dust or solid waste, cast house dedusting dust <(>&<)> debris also in the scope of solid waste disposal. certification will be done based on no. of trips. 8. one supervisor in each shift shall be deputed for managing equipment operation, maintenance, and coordination with corex operation. you shall carry out the subject work as per the requirements and instructions by our user dept and signing of loading slip of secondary sales vehicle from amns engineer. 9. direct loading of g slag from discharge chute to dumper is prohibited. it should remove the moisture by aside to slag and after 2 to 3hrs load in dumper. 10. removal, loading, transportation of granulated slag and dry pit slag to specified yard, heaping of received slag to make way for incoming slag, cleaning of spillage slag. 11. the lead between loading and unloading point for granulated slag shall be approx. 19 kms at (both ways). 12. you shall ensure that generation point slag heap is always kept at minimum height and should not touch the generation hood. 13. the carryover granulated slag generated from ponds has to be shifted to dumping yard. due to unavoidable circumstances sometimes, metal will be dumped into the dry pits. during this time, material shall be unloaded at specified yard as per user dept instructions. 14. handling of equipment’s such as chain mounted pay loaders, dumpers, page 2 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details excavators, all tools and tackles, labors and supervision etc., shall be in your scope. you shall deploy sufficient equipment’s for the above operation activities. 15. replacement of any man and machinery should be allowed only after prior intimation to the concerned department personals. 16. fuel, accessories, spares, consumables and maintenance of your fleet shall be in your scope. 17. storage for keeping spares and consumables shall be in your scope. you are advised to store all critical spares/ consumables to ensure continuous availability of your equipment’s. 18. you shall ensure that there should not be any spillage during transit and if any spillage takes place on the road the same shall be cleaned by you on a day to day basis. otherwise, a suitable penalty will be imposed on you. 19. in case your services are found unsatisfactory or unacceptable, or on your failure to complete the assignments within the time stipulated by user dept. company reserves the right to deduct the suitable amount as penalty as deemed reasonable from the amount payable to you in addition to the revocation of the contract without notice as its discretion. 20. during any emergency conditions the company reserves the right to deploy additional equipment’s to take care of the subject job. however, the penalty shall also be levied as per actual expenses claimed by other supplier +25% extra as penalty, in case of non availability of equipment and also non completion of work in the stipulated time. 21. you should provide equipment’s to the user dept. on 24 hours availability basis with operators. replacement of breakdown equipment’s shall be done without affecting the scope of the work. otherwise, a suitable penalty will be imposed on you. 22. cleaning of dry slag from the pits must be done within the stipulated time after cast house changeover by suitable equipment like excavator as per instructions and requirements by corex department. otherwise, a suitable penalty will be imposed on you. 23. loading equipment’s for other solid waste like drs dust, cast house zero meter area dust or solid waste, cast house dedusting dust <(>&<)> debris also to be provided as per the requirement. 24. in case slag granulation system breakdown or maintenance slag will be diverted to dry pit. to manage dry pit during that time is challenging, additional excavator breaker is also required. 25. in case of furnace problem, we need to take hot metal in dry pit for sometimes. volvo breakers may be required for removing solidified metal jam from dry pit. 26. need to maintain and safe drainage system of sgp. 27. based on requirement need to weighment of loaded vehicle whenever ask by area in charge for verification. 28. equipment and manpower safety will be in vendor scope. 29. entire sgp area housekeeping is to be taken care by vendor. weight assessment: · loading <(>&<)> shifting of slag the weight required for the billing purpose shall be technically assessed and cross verified by our corex department, based on the slag production report generated by our technical control group from the raw material charged to the furnace. if once the weighting system started billing will proceed as per actual weighment. · loading of slag: bill quantity certified as per secondary sales weighments. · the actual quantity may vary every month depending on the domestic sales. the contractor must ensure a proper evacuation plan from the source based on actual condition. however, for planning purposes a monthly forecast will be given by the secondary sales department. · list of equipment based on previous experience. page 3 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details sl no types of equip.capacity/title no. of equipment’s req. remarks 1 excavator ex200 2 1.to clean ponds and to make heap at chute area 2.loading 0f g and d slag 3.drypit cleaning 4.stand by required in case of breakdown 2 loader 950 1 to load slag to dumpers 3 dumpers 25t 12 dry slag and g slag shifting b. safety the driver should wear the safety belt while driving the vehicles. 1. your vehicle should have a reverse horn. 2. your drivers shall maintain the vehicle speed limit as per company rules. 3. in case your persons are engaged in working in hot zone area, you should provide them with heat resistance suits approved jeans jacket, cotton shirt, and cotton underwear <(>&<)> cotton socks, gum boots. 4. you shall deploy adequately trained and experienced personnel and equipment’s for ensuring smooth operation round the clock. 5. you shall engage the vehicles (with valid rto documents) with drivers having a valid driving license. the driver and cleaner should be deployed in such a manner to ensure availability of resources whenever required and each person employed does not have more than 12 hours working duration. 6. you shall take necessary safety precautions while loading <(>&<)> shifting the material as required by the user dept. 7. the tyres of vehicles should not be worn out. 8. the vehicle name plate, lighting systems including side blinkers shall be maintained without fail. 9. being the restricted area due to hot handling conditions, you shall not load other than your vehicles at the loading point. if any, you will be penalized heavily. 10. during clarifier <(>&<)> settling pond cleaning hot water may spread in vehicle movement area, so at that time ensure no movement of person on ground. 11. equipment and manpower safety will be in vendor scope. 12. operators need to maintain vehicle checklists throughout the month. 13. if any glass is found broken, it must be replaced immediately. 14. vehicle safety should be maintained according to the specifications outlined in table no 1. 15. vendor need to follow sop <(>&<)> hirac of dry pit cleaning, pond cleaning <(>&<)> slag shifting at the time of wo for understanding the specific job and accordingly you workforce to be trained. 15.emergency preparedness: · emergency response training: ensure all operators and drivers are trained in emergency response procedures, particularly for situations involving hot slag or equipment failure. · first aid kits and emergency equipment: require that all vehicles and work sites have fully stocked first aid kits and fire extinguishers. 16.hazard communication: · signage and barricading: clearly mark and barricade areas where slag loading and shifting occur, particularly in hot zones or near the clarifier and settling ponds. · communication devices: equip all personnel with communication devices to ensure immediate contact in case of an emergency. 17.load securing: · proper securing of slag: ensure that slag is securely loaded and covered during transportation to prevent spillage, particularly when transporting to export yards. · regular inspection: implement a protocol for regular checks to ensure that the load is properly secured throughout the transport process. 18.heat stress prevention: · rest breaks and hydration: ensure that workers operating in high temperature environments, such as near hot slag, have scheduled r page 4 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details est breaks and access to hydration to prevent heat stress. · cooling zones: if feasible, provide shaded or cooled areas where workers can take breaks to lower their body temperature. 19.maintenance and inspection protocols: · regular equipment maintenance: include specific guidelines for the frequency and scope of maintenance checks on all vehicles and equipment, beyond just the monthly vehicle checklist. · pre shift inspections: require pre shift inspections of all equipment to ensure operational safety and to prevent breakdowns during slag shifting operations. 20.traffic management: · designated routes: establish designated routes for vehicles transporting slag within the plant to minimize interactions with other plant operations and reduce the risk of accidents. · traffic controllers: consider deploying traffic controllers or spotters in areas with high vehicle movement to ensure safe navigation and loading operations. 21.behavioral safety: · safety incentives and penalties: implement a system of incentives for maintaining safety standards and penalties for violations, encouraging a culture of safety among all personnel. a. fatigue management: beyond the 12 hour work limit, consider implementing a system to monitor signs of fatigue among drivers and o perators to prevent accidents. movement of manpower / associates at our hazira site. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. · vendors must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. · vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is used for processing the gate pass. contractual equipment shall be equipped with safety devices are in working condition as per oem standard and am/ns india requirements as shown in table. s.no date:13.08.2025 safety devices dumper excavator wheel loader 1 gps system from vendor approved by am/ns. 2 prestart alarm 3 seat belt for driver 4 seat belt for co passengers 5 head lights 6 side indicators 7 parking light 8 brake light 9 front main horn 10 backup alarm/reverse alarm 11 revolving light/beacons 12 rear view side mirrors as per oem recommendations 13 rear view camera 14 reverse proximity sensor with warning system 15 wipers 16 fire extinguisher for heavy equipment category 9kg, page 5 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details medium equipment 6kg and light vehicle 2kg 17 parking/hand brake 18 load test certificate (form 10 third party) 19 forklift blue spot light/safety pedestrian lights 20 red zone warning light for forklift 21 over hoist limit switch 22 safe load indicator (sli) 23 marching alarm 24 boom control system warning 25 platform capacity indiactor c. statutory <(>&<)> general requirements: 2. owner / site in charge compulsory attend monthly department contractor meeting. 3. need to maintain attendance system for all manpower and supervisors as per company rules, more than 9 days duty not allowed. 4. no manpower allowed to duty more than 16 hours per day. 5. regular inspection <(>&<)> vehicle checklist to be maintained by all equipment operators and submitted monthly. 6. all equipment’s need to available in fit and fine condition at corex site. 7. when billing, submit scrum report of operator for attendance verification. 8. the contractor shall provide the equipment and operators as per land of law (e.g., rto laws <(>&<)> fitness) and company policies (e.g., safety certification <(>&<)> competency training). 9. all equipment must be following all applicable rto, central, state, and local govt rules <(>&<)> regulations. 10. vendor must ensure wsa policy and group insurance for their manpower. 11. vendor must have technical and operational competence to provide required services. 12. vendor must have work experience in heavy industries such as large steel plant, cement, mining or port operations. 13. vendor must comply with all relevant local, state regulations, including health and safety standards. 14. vendor must have sufficient fleet to allocate sufficient resources, including manpower, equipment, to meet plant requirements. 15. manpower should be competent as per competency matrix as per latest msa of amns. 16. equipment manufacturing year must be 2018 or later (equipment of manufacturing year before 2018 will not be allowed) and it should be in good working condition. any decision regarding acceptance of equipment of yom earlier than 2018 will be taken by amns only in exceptional cases. 17. equipment should be ready to deploy / make operational at our site by 1st jan 2025. however, the exact date of mobilization would be communicated 7 days in advance. contract period from 1st jan 2025 to 31st dec 2025. 18. final vehicle check will be done by amns hse department, equipment fitness <(>&<)> ppes will be checked every month by amns india user department. 19. gps system must be installed in all tippers/dumpers from common vendor which is approved by am/ns india. 20. all equipment needs to be deployed from 07:00 am to 07:00 pm for day shift <(>&<)> 07:00 pm to 07:00 am for night shift. all equipment operators must be relieved on a one to one basis. 21. to avoid production loss, equipment must be maintained in healthy condition for readiness for shutdown activities <(>&<)> regular work to complete in stipulated time. 22. necessary attachment needs to be provided with equipment as per operational requirement as per site visit. page 6 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 23. in case of special attachment vendor to keep provision of various fittings <(>&<)> adaptors in advance for fitment in vehicle. vehicle must be suitable for work at the amns site it has to be deployed. 24. the contractor shall provide the specified equipment in healthy condition with skilled operators as per company policies. 25. the contractor shall deploy alternate equipment same specification or above in case of any breakdown above 48hrs duration. 26.compliance with labor laws: a. registration under the contract labour (regulation <(>&<)> abolition) act, 1970: ensure that the vendor is registered under this act, as it governs the employment of contract labor in certain establishments. b. payment of wages act, 1936 compliance: the vendor must comply with the payment of wages act, ensuring timely and complete payment to workers without unauthorized deductions. c. employees’ provident fund (epf) and miscellaneous provisions act, 1952: ensure that all eligible workers are covered under epf, and contributions are made regularly. 27.compliance with environmental regulations: d. adherence to the environmental protection act, 1986: the vendor must ensure compliance with all relevant environmental regulations, including waste management, air and water pollution controls. e. hazardous waste management: specific compliance with the hazardous and other wastes (management and transboundary movement) rules, 2016, should be enforced, particularly regarding the handling, transportation, and disposal of slag and other industrial waste. 28.health and safety regulations: f. factories act, 1948 compliance: the vendor must comply with all provisions under the factories act, including provisions related to worker safety, health, and welfare, especially in hazardous environments. g. mandatory safety audits: periodic safety audits conducted by accredited agencies should be mandated to ensure ongoing compliance with safety standards. 29.insurance and liability: h. employees’ state insurance act, 1948: the vendor must ensure that all workers are covered under the esi act, providing medical and cash benefits in case of sickness, maternity, and employment injury. i. public liability insurance act, 1991: ensure that the vendor has adequate public liability insurance to cover any potential claims arising from accidents or environmental damage during operations. 30.vehicle and equipment compliance: j. motor vehicles act, 1988 compliance: all vehicles used by the vendor must adhere to the latest provisions of the motor vehicles act, including insurance, fitness certification, pollution control, and registration requirements. k. periodic vehicle fitness certification: in addition to regular inspections, it should be mandatory for all vehicles to undergo fitness certification by an authorized rto, as per the motor vehicles act. l. installation of speed governors: for heavy vehicles, ensure that speed governors are installed and maintained as per the central motor vehicles rules, 1989. 31.compliance with building and other construction workers (regulation of employment and conditions of service) act, 1996 (if applicable): m. ensure that any construction related activities comply with this act, which mandates safety, health, and welfare measures for workers involved in building and construction work. 32.periodic compliance reporting: n. monthly compliance reports: the vendor should submit a monthly compliance report covering adherence to all statutory and regulatory requirements, including labor laws, environmental regulations, and safety standards. o. third party verification: consider requiring third party audits to verify compliance with statutory requirements, especially for environmental and safety regulations. 33.contractor licensing: p. obtaining necessary licenses: the vendor must obtain all necessary licenses and permits required for the operation, including labor page 7 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details licenses, environmental clearances, and equipment operation permits. d. penalty specific penalty for nonperformance by vendor and must be cardinally measured. 1. a penalty will be imposed in case of noncompliance with hse norms <(>&<)> non conformity of work. 2. delay in dry pit cleaning or dry slag accumulation of more than 2000 tons. 3. more than 2 incidents of slag chute jam per month or granulated slag accumulation of more than 4000 tons 4. violation of any safety norms will be penalized to the contractor. 5. sleeping case of associates with penalty of minimum amount decided by phse if same case repeated the associates will be suspended or terminated by furnace in charges/operation head/hod. 6. misbehavior of contractor associate with area engineers/manager will be penalized/ suspended or terminated by furnace in charges/operation head/hod. 7. violation of company traffic rules will be penalized. 8. as per management directive, transport / movement of associates to <(>&<)> fro for plant should be mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. 9. penalties for statutory non compliance: a. non compliance with labor laws: for any instance of non compliance with labor laws (e.g., non payment of wages, violation of working hour limits), a penalty equal to the number of unpaid wages plus a 50% surcharge will be imposed. repeated offenses may lead to contract termination. b. failure to comply with provident fund/esi regulations: if the vendor fails to make timely contributions to epf or esi, a penalty of 2% of the total contract value per incident will be imposed, and the company reserves the right to withhold payments until compliance is achieved. c. violation of environmental regulations: any breach of environmental regulations, such as improper disposal of slag or failure to comply with pollution control norms, will result in a penalty of inr 1,00,000 per incident, with repeated violations leading to contract termination. 10. penalties for vehicle and equipment non compliance: a. non compliance with rto and motor vehicle laws: if any vehicle is found operating without valid rto documentation, fitness certification, or pollution control certificate, a penalty of inr 50,000 per vehicle will be imposed. additionally, the vendor must rectify the issue within 24 hours, failing which further penalties will be applied. b. failure to maintain equipment standards: if equipment is found to be non compliant with safety standards or in poor condition, a penalty of inr 20,000 per piece of equipment will be imposed, and the equipment must be replaced within 48 hours to avoid further penalties. 11. penalties for safety non compliance: a. lack of ppe or safety equipment: if workers are found without proper ppe or safety equipment, a penalty of inr 10,000 per incident will be imposed. repeated violations will result in a doubling of the penalty and possible suspension of the offending worker. b. failure to conduct safety audits: if the vendor fails to conduct required safety audits or submit safety reports, a penalty of inr 50,000 per missed audit will be imposed, with additional penalties for any safety violations discovered during subsequent audits. c. non compliance with emergency preparedness: if the vendor is found unprepared for emergencies (e.g., lack of first aid kits, inadequate fire extinguishers), a penalty of inr 25,000 per incident will be imposed, with immediate corrective actions required. 12. penalties for inadequate training and competence: a. untrained or incompetent personnel: if any worker is found to lack the necessary training or competence as per the competency matrix, a penalty of inr 5,000 per worker per day will be imposed until the issue page 8 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details is rectified. this also applies if operators are found without valid certification or training. b. failure to maintain attendance and work hours: if the vendor fails to adhere to the attendance system or work hour limits, a penalty of inr 10 ,000 per worker per incident will be imposed, with the potential for further penalties if noncompliance continues. 13. penalties for reporting and documentation failures: a. failure to submit required documentation: a penalty of inr 5,000 per day will be imposed for each day that required statutory, safety, or operational documentation (e.g., vehicle checklists, compliance reports) is delayed or incomplete. b. false or misleading documentation: if the vendor is found to have submitted false or misleading documentation, a penalty of inr 50,000 will be imposed per incident, with possible legal action and contract termination for severe cases. scope of work amns india: · supervising of operational works. item note : 2 2000156189 20 20 10 slag loading without transport 1 to email : gopal.ameta@amns.in contact : name : gopal ameta item details : job title: sow slag loading and shifting (without transport) 2025 spr no 20001516189 scope of work vendor technical description unit total quantity corex slag management from source to ton 286,800 export yard (with trasportaion) corex slag management from source to ton 430,200 domastic (without transportaion) 1. granulated slag shifting from sgp to designated dumping yard. average of 1900 mt/day. max of 2200 mt/day. 2. re arranging and heaping of slag at corex site area. if dumping space available storage at sgp yard to be avoided. 3. spillage slag during transit on road to be cleaned regularly on day to day basis as per spillage on road. 4. cleaning and disposal of carry over (granulated) slag from settling pond <(>&<)> clarifier ponds. 5. dry pit cleaning and dry pit slag shifting to the designated dumping yard as and when required. presently 12% dry slag being generated on and average. in case sgp breakdown dry pit will be operated for 1 2 taps continuously. vender should have sufficient equipment’s and manpower to manage such scenarios. 6. cleaning of hot metal and slag from dry pits during emergency. 7. shifting other solid waste like drs dust, cast house zero meter area dust or solid waste, cast house dedusting dust <(>&<)> debris also in the scope of solid waste disposal. certification will be done based on no. of trips. 8. one supervisor in each shift shall be deputed for managing equipment operation, maintenance, and coordination with corex operation. you shall carry out the subject work as per the requirements and instructions by our user dept and signing of loading slip of secondary sales vehicle from amns engineer. 9. direct loading of g slag from discharge chute to dumper is page 9 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details prohibited. it should remove the moisture by aside to slag and after 2 to 3hrs load in dumper. 10. removal, loading, transportation of granulated slag and dry pit slag to specified yard, heaping of received slag to make way for incoming slag, cleaning of spillage slag. 11. the lead between loading and unloading point for granulated slag shall be approx. 19 kms at (both ways). 12. you shall ensure that generation point slag heap is always kept at minimum height and should not touch the generation hood. 13. the carryover granulated slag generated from ponds has to be shifted to dumping yard. due to unavoidable circumstances sometimes, metal will be dumped into the dry pits. during this time, material shall be unloaded at specified yard as per user dept instructions. 14. handling of equipment’s such as chain mounted pay loaders, dumpers, excavators, all tools and tackles, labors and supervision etc., shall be in your scope. you shall deploy sufficient equipment’s for the above operation activities. 15. replacement of any man and machinery should be allowed only after prior intimation to the concerned department personals. 16. fuel, accessories, spares, consumables and maintenance of your fleet shall be in your scope. 17. storage for keeping spares and consumables shall be in your scope. you are advised to store all critical spares/ consumables to ensure continuous availability of your equipment’s. 18. you shall ensure that there should not be any spillage during transit and if any spillage takes place on the road the same shall be cleaned by you on a day to day basis. otherwise, a suitable penalty will be imposed on you. 19. in case your services are found unsatisfactory or unacceptable, or on your failure to complete the assignments within the time stipulated by user dept. company reserves the right to deduct the suitable amount as penalty as deemed reasonable from the amount payable to you in addition to the revocation of the contract without notice as its discretion. 20. during any emergency conditions the company reserves the right to deploy additional equipment’s to take care of the subject job. however, the penalty shall also be levied as per actual expenses claimed by other supplier +25% extra as penalty, in case of non availability of equipment and also non completion of work in the stipulated time. 21. you should provide equipment’s to the user dept. on 24 hours availability basis with operators. replacement of breakdown equipment’s shall be done without affecting the scope of the work. otherwise, a suitable penalty will be imposed on you. 22. cleaning of dry slag from the pits must be done within the stipulated time after cast house changeover by suitable equipment like excavator as per instructions and requirements by corex department. otherwise, a suitable penalty will be imposed on you. 23. loading equipment’s for other solid waste like drs dust, cast house zero meter area dust or solid waste, cast house dedusting dust <(>&<)> debris also to be provided as per the requirement. 24. in case slag granulation system breakdown or maintenance slag will be diverted to dry pit. to manage dry pit during that time is challenging, additional excavator breaker is also required. 25. in case of furnace problem, we need to take hot metal in dry pit for sometimes. volvo breakers may be required for removing solidified metal jam from dry pit. 26. need to maintain and safe drainage system of sgp. 27. based on requirement need to weighment of loaded vehicle whenever ask by area in charge for verification. 28. equipment and manpower safety will be in vendor scope. 29. entire sgp area housekeeping is to be taken care by vendor. weight assessment: · loading <(>&<)> shifting of slag the weight required for the billing page 10 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details purpose shall be technically assessed and cross verified by our corex department, based on the slag production report generated by our technical control group from the raw material charged to the furnace. if once the weighting system started billing will proceed as per actual weighment. · loading of slag: bill quantity certified as per secondary sales weighments. · the actual quantity may vary every month depending on the domestic sales. the contractor must ensure a proper evacuation plan from the source based on actual condition. however, for planning purposes a monthly forecast will be given by the secondary sales department. · list of equipment based on previous experience. sl no types of equip.capacity/title no. of equipment’s req. remarks 1 excavator ex200 2 1.to clean ponds and to make heap at chute area 2.loading 0f g and d slag 3.drypit cleaning 4.stand by required in case of breakdown 2 loader 950 1 to load slag to dumpers 3 dumpers 25t 12 dry slag and g slag shifting b. safety the driver should wear the safety belt while driving the vehicles. 1. your vehicle should have a reverse horn. 2. your drivers shall maintain the vehicle speed limit as per company rules. 3. in case your persons are engaged in working in hot zone area, you should provide them with heat resistance suits approved jeans jacket, cotton shirt, and cotton underwear <(>&<)> cotton socks, gum boots. 4. you shall deploy adequately trained and experienced personnel and equipment’s for ensuring smooth operation round the clock. 5. you shall engage the vehicles (with valid rto documents) with drivers having a valid driving license. the driver and cleaner should be deployed in such a manner to ensure availability of resources whenever required and each person employed does not have more than 12 hours working duration. 6. you shall take necessary safety precautions while loading <(>&<)> shifting the material as required by the user dept. 7. the tyres of vehicles should not be worn out. 8. the vehicle name plate, lighting systems including side blinkers shall be maintained without fail. 9. being the restricted area due to hot handling conditions, you shall not load other than your vehicles at the loading point. if any, you will be penalized heavily. 10. during clarifier <(>&<)> settling pond cleaning hot water may spread in vehicle movement area, so at that time ensure no movement of person on ground. 11. equipment and manpower safety will be in vendor scope. 12. operators need to maintain vehicle checklists throughout the month. 13. if any glass is found broken, it must be replaced immediately. 14. vehicle safety should be maintained according to the specifications outlined in table no 1. 15. vendor need to follow sop <(>&<)> hirac of dry pit cleaning, pond cleaning <(>&<)> slag shifting at the time of wo for understanding the specific job and accordingly you workforce to be trained. 15.emergency preparedness: · emergency response training: ensure all operators and drivers are trained in emergency response procedures, particularly for situations involving hot slag or equipment failure. · first aid kits and emergency equipment: require that all vehicles and work sites have fully stocked first aid kits and fire extinguishers. 16.hazard communication: page 11 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details · signage and barricading: clearly mark and barricade areas where slag loading and shifting occur, particularly in hot zones or near the clarifier and settling ponds. · communication devices: equip all personnel with communication devices to ensure immediate contact in case of an emergency. 17.load securing: · proper securing of slag: ensure that slag is securely loaded and covered during transportation to prevent spillage, particularly when transporting to export yards. · regular inspection: implement a protocol for regular checks to ensure that the load is properly secured throughout the transport process. 18.heat stress prevention: · rest breaks and hydration: ensure that workers operating in high temperature environments, such as near hot slag, have scheduled r est breaks and access to hydration to prevent heat stress. · cooling zones: if feasible, provide shaded or cooled areas where workers can take breaks to lower their body temperature. 19.maintenance and inspection protocols: · regular equipment maintenance: include specific guidelines for the frequency and scope of maintenance checks on all vehicles and equipment, beyond just the monthly vehicle checklist. · pre shift inspections: require pre shift inspections of all equipment to ensure operational safety and to prevent breakdowns during slag shifting operations. 20.traffic management: · designated routes: establish designated routes for vehicles transporting slag within the plant to minimize interactions with other plant operations and reduce the risk of accidents. · traffic controllers: consider deploying traffic controllers or spotters in areas with high vehicle movement to ensure safe navigation and loading operations. 21.behavioral safety: · safety incentives and penalties: implement a system of incentives for maintaining safety standards and penalties for violations, encouraging a culture of safety among all personnel. a. fatigue management: beyond the 12 hour work limit, consider implementing a system to monitor signs of fatigue among drivers and o perators to prevent accidents. movement of manpower / associates at our hazira site. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. · vendors must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. · vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is used for processing the gate pass. contractual equipment shall be equipped with safety devices are in working condition as per oem standard and am/ns india requirements as shown in table. s.no date:13.08.2025 safety devices dumper excavator wheel loader 1 gps system from vendor approved by am/ns. 2 prestart alarm 3 seat belt for driver 4 seat belt for co passengers 5 head lights page 12 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 6 side indicators 7 parking light 8 brake light 9 front main horn 10 backup alarm/reverse alarm 11 revolving light/beacons 12 rear view side mirrors as per oem recommendations 13 rear view camera 14 reverse proximity sensor with warning system 15 wipers 16 fire extinguisher for heavy equipment category 9kg, medium equipment 6kg and light vehicle 2kg 17 parking/hand brake 18 load test certificate (form 10 third party) 19 forklift blue spot light/safety pedestrian lights 20 red zone warning light for forklift 21 over hoist limit switch 22 safe load indicator (sli) 23 marching alarm 24 boom control system warning 25 platform capacity indiactor c. statutory <(>&<)> general requirements: 2. owner / site in charge compulsory attend monthly department contractor meeting. 3. need to maintain attendance system for all manpower and supervisors as per company rules, more than 9 days duty not allowed. 4. no manpower allowed to duty more than 16 hours per day. 5. regular inspection <(>&<)> vehicle checklist to be maintained by all equipment operators and submitted monthly. 6. all equipment’s need to available in fit and fine condition at corex site. 7. when billing, submit scrum report of operator for attendance verification. 8. the contractor shall provide the equipment and operators as per land of law (e.g., rto laws <(>&<)> fitness) and company policies (e.g., safety certification <(>&<)> competency training). 9. all equipment must be following all applicable rto, central, state, and local govt rules <(>&<)> regulations. 10. vendor must ensure wsa policy and group insurance for their manpower. 11. vendor must have technical and operational competence to provide required services. 12. vendor must have work experience in heavy industries such as large steel plant, cement, mining or port operations. 13. vendor must comply with all relevant local, state regulations, including health and safety standards. 14. vendor must have sufficient fleet to allocate sufficient resources, including manpower, equipment, to meet plant requirements. 15. manpower should be competent as per competency matrix as per latest msa of amns. 16. equipment manufacturing year must be 2018 or later (equipment of manufacturing year before 2018 will not be allowed) and it should be in good working condition. any decision regarding acceptance of equipment of yom earlier than 2018 will be taken by amns only in exceptional cases. 17. equipment should be ready to deploy / make operational at our site by 1st jan 2025. however, the exact date of mobilization would be communicated 7 days in advance. contract period from 1st jan 2025 to page 13 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 31st dec 2025. 18. final vehicle check will be done by amns hse department, equipment fitness <(>&<)> ppes will be checked every month by amns india user department. 19. gps system must be installed in all tippers/dumpers from common vendor which is approved by am/ns india. 20. all equipment needs to be deployed from 07:00 am to 07:00 pm for day shift <(>&<)> 07:00 pm to 07:00 am for night shift. all equipment operators must be relieved on a one to one basis. 21. to avoid production loss, equipment must be maintained in healthy condition for readiness for shutdown activities <(>&<)> regular work to complete in stipulated time. 22. necessary attachment needs to be provided with equipment as per operational requirement as per site visit. 23. in case of special attachment vendor to keep provision of various fittings <(>&<)> adaptors in advance for fitment in vehicle. vehicle must be suitable for work at the amns site it has to be deployed. 24. the contractor shall provide the specified equipment in healthy condition with skilled operators as per company policies. 25. the contractor shall deploy alternate equipment same specification or above in case of any breakdown above 48hrs duration. 26.compliance with labor laws: a. registration under the contract labour (regulation <(>&<)> abolition) act, 1970: ensure that the vendor is registered under this act, as it governs the employment of contract labor in certain establishments. b. payment of wages act, 1936 compliance: the vendor must comply with the payment of wages act, ensuring timely and complete payment to workers without unauthorized deductions. c. employees’ provident fund (epf) and miscellaneous provisions act, 1952: ensure that all eligible workers are covered under epf, and contributions are made regularly. 27.compliance with environmental regulations: d. adherence to the environmental protection act, 1986: the vendor must ensure compliance with all relevant environmental regulations, including waste management, air and water pollution controls. e. hazardous waste management: specific compliance with the hazardous and other wastes (management and transboundary movement) rules, 2016, should be enforced, particularly regarding the handling, transportation, and disposal of slag and other industrial waste. 28.health and safety regulations: f. factories act, 1948 compliance: the vendor must comply with all provisions under the factories act, including provisions related to worker safety, health, and welfare, especially in hazardous environments. g. mandatory safety audits: periodic safety audits conducted by accredited agencies should be mandated to ensure ongoing compliance with safety standards. 29.insurance and liability: h. employees’ state insurance act, 1948: the vendor must ensure that all workers are covered under the esi act, providing medical and cash benefits in case of sickness, maternity, and employment injury. i. public liability insurance act, 1991: ensure that the vendor has adequate public liability insurance to cover any potential claims arising from accidents or environmental damage during operations. 30.vehicle and equipment compliance: j. motor vehicles act, 1988 compliance: all vehicles used by the vendor must adhere to the latest provisions of the motor vehicles act, including insurance, fitness certification, pollution control, and registration requirements. k. periodic vehicle fitness certification: in addition to regular inspections, it should be mandatory for all vehicles to undergo fitness certification by an authorized rto, as per the motor vehicles act. l. installation of speed governors: for heavy vehicles, ensure that speed governors are installed and maintained as per the central motor vehicles rules, 1989. 31.compliance with building and other construction workers (regulation of employment and conditions of service) act, 1996 (if applicable): page 14 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details m. ensure that any construction related activities comply with this act, which mandates safety, health, and welfare measures for workers involved in building and construction work. 32.periodic compliance reporting: n. monthly compliance reports: the vendor should submit a monthly compliance report covering adherence to all statutory and regulatory requirements, including labor laws, environmental regulations, and safety standards. o. third party verification: consider requiring third party audits to verify compliance with statutory requirements, especially for environmental and safety regulations. 33.contractor licensing: p. obtaining necessary licenses: the vendor must obtain all necessary licenses and permits required for the operation, including labor licenses, environmental clearances, and equipment operation permits. d. penalty specific penalty for nonperformance by vendor and must be cardinally measured. 1. a penalty will be imposed in case of noncompliance with hse norms <(>&<)> non conformity of work. 2. delay in dry pit cleaning or dry slag accumulation of more than 2000 tons. 3. more than 2 incidents of slag chute jam per month or granulated slag accumulation of more than 4000 tons 4. violation of any safety norms will be penalized to the contractor. 5. sleeping case of associates with penalty of minimum amount decided by phse if same case repeated the associates will be suspended or terminated by furnace in charges/operation head/hod. 6. misbehavior of contractor associate with area engineers/manager will be penalized/ suspended or terminated by furnace in charges/operation head/hod. 7. violation of company traffic rules will be penalized. 8. as per management directive, transport / movement of associates to <(>&<)> fro for plant should be mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. 9. penalties for statutory non compliance: a. non compliance with labor laws: for any instance of non compliance with labor laws (e.g., non payment of wages, violation of working hour limits), a penalty equal to the number of unpaid wages plus a 50% surcharge will be imposed. repeated offenses may lead to contract termination. b. failure to comply with provident fund/esi regulations: if the vendor fails to make timely contributions to epf or esi, a penalty of 2% of the total contract value per incident will be imposed, and the company reserves the right to withhold payments until compliance is achieved. c. violation of environmental regulations: any breach of environmental regulations, such as improper disposal of slag or failure to comply with pollution control norms, will result in a penalty of inr 1,00,000 per incident, with repeated violations leading to contract termination. 10. penalties for vehicle and equipment non compliance: a. non compliance with rto and motor vehicle laws: if any vehicle is found operating without valid rto documentation, fitness certification, or pollution control certificate, a penalty of inr 50,000 per vehicle will be imposed. additionally, the vendor must rectify the issue within 24 hours, failing which further penalties will be applied. b. failure to maintain equipment standards: if equipment is found to be non compliant with safety standards or in poor condition, a penalty of inr 20,000 per piece of equipment will be imposed, and the equipment must be replaced within 48 hours to avoid further penalties. 11. penalties for safety non compliance: a. lack of ppe or safety equipment: if workers are found without proper ppe or safety equipment, a penalty of inr 10,000 per incident will be page 15 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details imposed. repeated violations will result in a doubling of the penalty and possible suspension of the offending worker. b. failure to conduct safety audits: if the vendor fails to conduct required safety audits or submit safety reports, a penalty of inr 50,000 per missed audit will be imposed, with additional penalties for any safety violations discovered during subsequent audits. c. non compliance with emergency preparedness: if the vendor is found unprepared for emergencies (e.g., lack of first aid kits, inadequate fire extinguishers), a penalty of inr 25,000 per incident will be imposed, with immediate corrective actions required. 12. penalties for inadequate training and competence: a. untrained or incompetent personnel: if any worker is found to lack the necessary training or competence as per the competency matrix, a penalty of inr 5,000 per worker per day will be imposed until the issue is rectified. this also applies if operators are found without valid certification or training. b. failure to maintain attendance and work hours: if the vendor fails to adhere to the attendance system or work hour limits, a penalty of inr 10 ,000 per worker per incident will be imposed, with the potential for further penalties if noncompliance continues. 13. penalties for reporting and documentation failures: a. failure to submit required documentation: a penalty of inr 5,000 per day will be imposed for each day that required statutory, safety, or operational documentation (e.g., vehicle checklists, compliance reports) is delayed or incomplete. b. false or misleading documentation: if the vendor is found to have submitted false or misleading documentation, a penalty of inr 50,000 will be imposed per incident, with possible legal action and contract termination for severe cases. scope of work amns india: · supervising of operational works....

Department Of Sports Youth And Culture Activities - Gujarat

45051078 bids are invited for facility management services lumpsum based transfer the statue of vasai village to patan musuem; maxx pickup vahan nos 1 crain provide for lode statue nos 1packing materiyal strike nos25 provide labour nos 5; consumables to be provided by servic... total quantity :...

Directorate General Of Light House And Lightships - Gujarat

45049631 bids are invited for lightning arrestor at jegri lh twin control wiring , 2 module , 4 module , 6 module , 12 module , 5 or 6 a switch , 2 way 5 or 6 a switch , 15 or 16 a switch , 3 pin 5 or 6 a socket outlet , 6 pin 15 or 16 a socket outlet , brass baten angle holder , supply and fixing modular blanking plate , installation of led bulkhead , installation and testing of tube lights , 20 mm pvc conduit , 25 mm pvc conduit , 3x 1.5 sq mm copper wire , 3 x 4 sq mm copper wire , supply of copper armoured cable , supply of copper unarmoured cable , laying of ug cable up to 35 sqmm , mcb db 6 way,double door , mcb db 4 way 4 plus 12 , mcb single pole 20 a , mcb double pole 32 a , supplying and fixing of double pole 40 a mcb , supplying and fixing of double pole 63 a mcb , supply of led tube light , supply of led bulkhead , supply of pvc cable tray , supply and installation of wall mounted fan , labour charge of cable tray fitting work , supply of copper strip for earthing work , supply of earth road , supply of 1 core 25 sqmm copper wire , supply of ese lightning protection system , fabrication work , labour charges for 02 nos earthing borewell , labour charges for fitting of copper strip , labour charges , supply of battery charger rewiring of lighthosue tower and installation of ese total quantity : 979...

Military Engineer Services - Gujarat

45037121 tender for repairing and polishing of wooden furniture at af stn bhuj; 1 bed hard with plywood top: removing following old and unserviceable parts / components of“bed plywood top” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw, etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd 246, 247) 2 head rest complete. 3 foot rest complete. 4 plywood top with12 mm thick bwr commercial.(make kitply/century /greenply/ national/bhutan 5 long rail of first class hard wood (teak wood). 6 short rail of first class hard wood (teak wood). 7 both side veneered of head rest. 8 both side veneered of foot rest 9 table dressing gents with mirror: removing following old and unserviceable parts / components of“table dressing gents with mirror” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw,etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd 230) 10 5 mm thick looking mirror with 06 mm thickplywood at the back. 11 complete frame of first class hard wood (teak wood) for mirror . 12 lower woodenboxmade out of 18mm thick plywood (12 nos of ply) grade bwrwith 3 mm thick teak wood lipping on edge, including 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side with approved adhesive as per manufacturers instructions and other side french polishing, 6 mm thick back plywood & bright polished brass knob 40mm dia complete. 13 peg table: removing following old and unserviceable parts / components of“peg table” and supply & fix new parts / components of same size, existing pattern and same texture, with necessary beading, screw etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge.drg no fd 236 & 277 14 top made out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 15 legs of first class hard wood (teak wood) 16 short rail of first class hard wood (teak wood) 17 longrail of first class hard wood (teak wood). 18 table centre: removing following old and unserviceable parts / components of“table centre” and supply & fix new parts / components of same size, existing pattern andsame texture, with necessary beading, screw etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge.drg no fd 235 & 274 19 top made out of 18 mm thick plywood (12 nos of ply) grade bwr, typebb with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 20 legs of first class hard wood (teak wood) 21 short rail of first class hard wood (teak wood) 22 longrail of first class hard wood (teak wood). 23 teapoy wooden: removing following old and unserviceable parts / components of“teapoy wooden” and supply & fix new parts / components of same size, existing pattern andsame texture, with necessary beading, screw, etc and polishing complete all as shown on drawing & as specified and as directed byengineer in charge. (drg no fd 232 & 278) 24 top made out of 18mm thick plywood (12 nos of ply) grade bwr, typebb with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 25 legs of first class hard wood (teak wood) 26 short rail of first class hard wood (teak wood) 27 longrail of first class hard wood (teak wood). 28 table computer: removing following old and unserviceable parts / components of“table computer” and supply & fix new parts / components of same size, existing pattern andthe same texture, with necessary beading, screw,etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd/e6/map/03) 29 top made out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 30 drawer made out of 18 mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, including 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side with approved adhesive as per manufacturers instructions and other side french polishing, 6 mm thick bottom plywood with 02 nostelescopic channel of best qualityas approved by engr in charge. 31 pull out tray for mouse made out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, including 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side with approved adhesive as per manufacturers instructions and other side french polishing, with 02 nostelescopic channel of best qualityas approved by engr in charge. 32 pull out tray for key board made out of 18 mm thick plywood (12 nos of ply) grade bwr, typebb with 3 mm thick teak wood lipping on edge, including 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side with approved adhesive as per manufacturers instructions and other side french polishing, with 02 nostelescopic channel of best qualityas approved by engr in charge. 33 foam with & with out back: removing following old and unserviceable parts / components of“foam with & with out back” and supply & fix new parts / components of same size, existing pattern andsame texture, with necessary beading, screw, nut and bolt etc and polishing as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd 77,78) 34 seat made ofone piece of first class hard wood (teak wood). 35 back rest made ofone piece of first class hard wood (teak wood). 36 table 3x3 wooden: removing following old and unserviceable parts / components of“table 3x3 wooden” and supply & fix new parts / components of same size, existing pattern and same texture, with necessary beading, screw etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd 88 m, 291) 37 top made out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 38 chair dining with cushioned: removing following old and unserviceable parts / components of“chair dining with cushioned” and supply & fix new parts / components of same size, existing pattern andsame texture, with necessary beading, screw etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd/map ii/04) 39 front leg made ofone piece of first class hard wood (teak wood). 40 rear leg made ofone piece of first class hard wood (teak wood). 41 bottom stiffener long made ofone piece of first class hard wood (teak wood). 42 bottom stiffener short made ofone piece of first class hard wood (teak wood). 43 short rail of seat made ofone piece of first class hard wood (teak wood). 44 long rail of seat made ofone piece of first class hard wood (teak wood). 45 complete seat made out of 75 mm thick 32 density foam with 12 mm thick plywood base, upholstered withrexin. 46 board notice of sorts 47 removing unserviceable green baize cloth from board notice 4x4 & supply and fix new green baize of best quality (as approved by the ge, costing not less than rs.150 per rm of standard availabele width) to board notice usiung appropriate size screws incliding minor repair work to wooden frame, complete all as specified and as directed byengineer in charge and as shown on drawing no fd: 05 09. 48 all as per item no 10.01 above but board notice of size 4x3 49 all as per item no 10.01 above but board notice of size 6x4 50 all as per item no 10.01 above but board notice of size 8x4 51 all as per item no 10.01 above but board notice of size 8x6 52 removing unserviceable plain broken sheet glass of front shutter (one shutter) and connected beading from board notice of size 4x4 and supply and fixing plain sheet glass 3mm thich and 1st class hard wood beading of size 10 mm x 10mm with and incliding screws complete all as specified and as directed byengineer in charge and as shown on drawing no fd 05 09.make of glass modiguard/saint gobin/ asahi/ atul. 53 all as per item no 10.06 above but board notice of size 4x3 54 all as per item no 10.06 above but board notice of size 6x4 55 removing unservicable soft board and plywood of one shutter of board notice of size 4x4 and supply & fixing same size of new 12mm thick soft board and 6mm thick commercial bwr frade plywoood, isi marked, complete all as specified and as directed byengineer in charge and as shown on drawing no fd 05 09.make kitply/century/green ply/ national/bhutan board. 56 all as per item no 10.09 above but board notice of size 4x3 57 all as per item no 10.09 above but board notice of size 6x4 58 m&l for preparing old posished and newly repaced parts of board notice of size 4x4 and applying two coats of french polish to complete board notice complete all as specified and as directed byengineer in charge and as shown on drawing no fd 05 09. 59 all as per item no 10.12 above but board notice of size 4x3 60 all as per item no 10.12 above but board notice of size 6x4 61 all as per item no 10.12 above but board notice of size 8x4 62 all as per item no 10.12 above but board notice of size 8x6 63 table writing (study): removing following old and unserviceable parts / components of“table writing (study) ” and supply & fix new parts / components of same size, existing pattern andsame texture, with necessary beading, screw etc and olishing complete all as shown on drawing & as directed by engineer in charge.drg no fd 33 & 275, 249 64 top made out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 65 legs made offirst class hard wood (teak wood). 66 drawer made out of 12 mm plywood. 67 shutters out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 68 chair dining: removing following old and unserviceable parts / components of“chair dining” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw, etc and polishing complete all as shown on drawing & as directed by engineer in charge. (drg no fd 279) 69 front legs made offirst class hard wood (teak wood). 70 rear legs made offirst class hard wood (teak wood). 71 long / short rail of seat made offirst class hard wood (teak wood). 72 stiffener of back made offirst class hard wood (teak wood). 73 short & long stiffener of bottom made offirst class hard wood (teak wood). 74 table dining 6 / 8 person: removing following old and unserviceable parts / components of“table dining 6 / 8 person ” and supply & fix new parts / components of same size, existing pattern andsame texture, with necessary beading, screwetc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd 239 & 273) 75 top for table dining 6 person made out of 18 mm thick plywood (12 nos of ply) grade bwr, typebb with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 76 top for table dining 8 person made out of 18mm thick plywood (12 nos of ply) grade bwr, typebb with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 77 legs made offirst class hard wood (teak wood). 78 short rail made offirst class hard wood (teak wood). 79 long rail for table dining 6 person made offirst class hard wood (teak wood). 80 long rail for table dining 8 person made offirst class hard wood (teak wood). 81 chair wooden bottom: removing following old and unserviceable parts / components of“chair wooden bottom” and supply & fix new parts / components of same size, existing pattern and same materialn of same texture, with necessary beading, screw, etc and polishing complete all as shown on drawing & as directed by engineer in charge. (drg no fd 56, 285 &225) 82 front legs made offirst class hard wood (teak wood). 83 rear legs made offirst class hard wood (teak wood). 84 front / rear / side railof seat made offirst class hard wood (teak wood). 85 stiffener of back made offirst class hard wood (teak wood). 86 short & long stiffener of bottom made offirst class hard wood (teak wood). 87 wooden bottom made out of 6 mm plywood. 88 material & labour for removing the existing worn out cane and recanning of furniture articles except chair verandah with new standard 2 mm wide plastic cane of semi circular type with border of 4 mm wide plastic cane complete all as specified and as directed byengineer in charge. 89 material & labour for cushion foam of 40 density with fabric cushion cover for seat of sofa set 5/4 seater, superior quality of foam & cover complete all as specified and as directed byengineer in charge.(drg no fd 281.tapestry cloth approved by ge not less than 340/ per mtrs. 90 chair easy: removing following old and unserviceable parts / components of“chair easy” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw,etc and polishing complete all as shown on drawing & as directed by engineer in charge. (drg no fd 229) 91 front / rear legs made offirst class hard wood (teak wood). 92 arm rest made offirst class hard wood (teak wood). 93 seatfront / rear / side rail made offirst class hard wood (teak wood). 94 backupper / bottom rail made offirst class hard wood (teak wood). 95 table dressing ladies: removing following old and unserviceable parts / components of“table dressing ladies” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw etc and polishing complete all as shown on drawing & as directed by engineer in charge. (drg no fd 251) 96 looking mirror of approved quality with back of 06 mm plywood and frame 97 lower woodenbox with drawer made out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, including 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side with approved adhesive as per manufacturers instructions and other side french polishing, 6 mm thick back plywood, 4 mm thick sliding glass, aluminium channel etc complete all as per drawing. 98 table bed side: removing following old and unserviceable parts / components of“table bed side ” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw etc and polishing complete all as shown on drawing & as directed by engineer in charge. (drg no fd 248 / 246 ) 99 back of 6 mm thick commercial face plywood. 100 side (left or right) made out of 18 mm thick plywood with 1mm laminated sunmica top wood finish duly polished at bottom, with first class hardwood (teak wood) beading. 101 top / middle shelf made out of 18mm thick plywood with glossy sunmica with first class hardwood (teak wood) beading. 102 chair writing: removing following old and unserviceable parts / components of“chair writing” and s&f new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw etc and polishing complete all as shown on drawing & as directed by engineer in charge. (drg no fd 250, 280, 285) 103 front legs made offirst class hard wood (teak wood). 104 rear legs made offirst class hard wood (teak wood). 105 front / rear / side rail of seat made offirst class hard wood (teak wood). 106 stiffener of back made offirst class hard wood (teak wood). 107 short / long stiffener of bottom made offirst class hard wood (teak wood). 108 table 3 x 2 with & without drawer: removing following old and unserviceable parts / components of“table 3 x 2 with & without drawer” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw,etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd 41, 224, 283) 109 top made out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 110 leg made offirst class hard wood (teak wood). 111 long rail made offirst class hard wood (teak wood). 112 short railmade offirst class hard wood (teak wood). 113 long bottom stiffeners made offirst class hard wood (teak wood). 114 short bottom stiffeners made offirst class hard wood (teak wood). 115 complete drawer made out of 12 mm thick plywood. 116 table dining 1200mm x 900mm: 117 supply & fix replacement of unserviceable top of the table with new top of size 4x3 made out of prelaminated particle board of 18mm/19mm thich, exteriou grade, (phenol bonded) confirming to is 12823 1990 with 4 mm thick teak wood edging all around of the top duly french polished complete all as specified and as directed byengineer in charge all as shown on drawing.make: green ply/kitply/ duratuf/ bhutan/ novapan.(drawing no fd/map ii/03) 118 supply & fix in replacement of unserviceable legs with new legs of seasoned sheesham wood duly french polished, all as shown on drawing. 119 supply & fix in replacement of unserviceable long rails with new long rails of seaso9ned sheesham wood duly french polished all as shown on drawings. 120 supply & fix in replacemen t of old brackets with new brackets of seasoned sheesham wood in corners dyly french polished, complete all as shown on drawings. 121 supply & fix in replacement of unserviceable short rails with new short rails of seasoned sheeesham wood duly french polished ass as shown on drawing. 122 material & labour for preoeration of old polished surfaces of the table dining 4x3 repaired under item nos 22.01 to 22.05 above by sxrapping and cleaning and applying one coat of raw sienna and two coats of french polish and matching with the new repaired parts, all as specified and as shown on drawing. 123 repairs to hat stand with mirror: removing following old and unserviceable parts / components of“repairs to hat stand with mirror” and supply & fix new parts / components of same size, existing pattern and same material, with beading, screw etc and polishing complete all as shown on drawing & as directed by engineer in charge. (drg no fd 233) 124 5 mm thick looking mirror. 125 3 mm thick veneered plywood. 126 9 mm thick back plywood. 127 aluminium peg. 128 chair writing with pad: 129 removal of inserviceable rear leg (one leg) for chair writing with pad & supply and fix ist class hard wood (teak) well seasoned leg (one leg) for chair writing and prepareation of new surfaces and applying two coats of french polish on leg complete all as specified and as directed byengineer in charge and as shown on drawing nos fd 250. 130 all as per item no 24.01 above but front leg (one leg) for chair writing with pad 131 all as per item no 24.01 above but side rail (one rail) for chair writing with pad 132 all as per item no 24.01 above but front rail (one rail) of chair writinng with pad 133 all as per item no 24.01 above but back rail (one rail) of chair writinng with pad 134 all as per item no 24.01 above but handle with pad (one handle with pad) for chair writinng with pad 135 all as per item no 24.01 above but handle (one handle) for chair writing with pad 136 all as per item no 24.01 above but back rest (set of two) of chair writinng with pad 137 all as per item no 24.01 above but one set of stiffener(set of three stiffeners) of chair writinng with pad 138 material & labour for preparation of old polished surfaces of the chairs repaired under item nos 24.01 to 24.09 above by scrapping and cleaning and applying one coat of raw sienna and two coats f french polish and matching with the new repaired parts, all as specified and as shown on drawing 139 table 1520 mm x 860 mm x 760 mm: removing following old and unserviceable parts / components of“ table 1520 mm x 860 mm x 760 mm” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screwetc and polishing complete all as shown on drawing & as directed by engineer in charge.(drg no fd 139) 140 top made out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete. 141 legs made offirst class hard wood (teak wood). 142 top rails of section area 25 mm x 100 mm made offirst class hard wood (teak wood). 143 stiffener of sectional area 25 mm x 50 mm made offirst class hard wood (teak wood). 144 side board: removing following old and unserviceable parts / components of“ side board” and supply & fix new parts / components of same size, existing pattern andsame texture, with necessary beading, screw, etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd 26 (m) / 371) 145 back made out of 4 mm thick plywood. 146 top made out of 18mm thick plywood with glossy sunmica with first class hardwood (teak wood) beading. 147 door made out of 18 mm thick plywood with glossy sunmica with first class hardwood (teak wood) beading. 148 drawer made out of 18mm thick plywood with glossy sunmica with first class hardwood (teak wood) beading. 149 100 mm sizesteel hasp & staple. 150 knob 40 mm dia 151 stool dressing: removing following old and unserviceable parts / components of“stool dressing” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw etc and polishing complete all as shown on drawing & as directed by engineer in charge. (drg no fd/map ii/07 (sheet 3 of 3) 152 legs made out of teak wood 153 short rail made out of teak wood 154 front / rear long rail made out of teak wood. 155 top made out of 18mm thick plywood (12 nos of ply) grade bwr with 3 mm thick teak wood lipping on edge, fixing of top withscrewsincluding 0.90 mm thick decorative laminate type 1 of surface finish, colour and pattern as approved, paste on exposed side of top with approved adhesive as per manufacturers instructions and other side french polishing complete all as specified and as directed byengineer in charge. 156 chair easy cushioned wooden: removing following old and unserviceable parts / components of“chair easy cushioned wooden” and supply & fix new parts / components of same size, existing pattern and same material of same texture, with necessary beading, screw etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd 358) 157 seat of 75 mm thick synthetic foam cushion of density 28 covered with leatherite rexin as approved by engr in charge. 158 back rest of 50 mm thicksynthetic foam cushion of density 28 covered with leatherite rexin as approved by engr in charge. 159 hard rubber shoe 160 repairs to sofa set 3 seater by replacing of seat & back cushion foam 100 mm thick 40 density with fabric tapestry cloth as per sample approved by engr in charge complete all as specified and as directed byengineer in charge. (drg no. hof csm 18, hof 139,godrej, durian & swadesi) 161 sofa set 4 seater: removing following old and unserviceable parts / components of“sofa set 4 seater” and s&f new parts / components of same size, existing pattern and same material, with beading, screw, etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no fd 281 / 258 / 373) 162 arms made out of teakwood. 163 front leg made out of teakwood. 164 rear leg made out of teakwood. 165 batten for seat and back madeout of teak wood 166 sofa set 5 seaterremoving following old and unserviceable parts / components of“sofa set 5 seater” and s&f new parts / components of same size, existing pattern and same material, with beading, screw, etc and polishing complete all as shown on drawing & as directed by engineer in charge. (drg no fd 281 / 258 / 373) 167 arms made out of teak wood. 168 front leg made out of teak wood. 169 rear leg made out of teak wood. 170 batten for seat and back madeout of teak wood 171 bench workshop: removing following old and unserviceable parts / components of“bench workshop” and supply & fix new parts / components of same size, existing pattern and same material, with beading, screw etc and polishing complete all as shown on drawing & complete all as specified and as directed byengineer in charge. (drg no ge (af) j / fd / 02 / 01d & 145 m) 172 top made out of first class hardwood. 173 leg made out of teak wood of size 760 x 100 x 100 mm. 174 shelf made of one picesfirst class hardwood (teak wood) 175 rail made out offirst class hard wood (teak wood) of size 2130mm x 100 x 100 mm. 176 supply & fix wooden bracket made of first class hard wood (teak wood)fixing legs to long and short rail veries type of wooned table fixed with screw and duly polishing to match with existing complete all as specified and as directed byengineer in charge. ...

Directorate General Of Light House And Lightships - Gujarat

45036376 bids are invited for lightning arrestor at diuhead lh twin control wiring , 2 module , 4 module , 6 module , 12 module , 5 or 6 a switch , 2 way 5 or 6 a switch , 15 or 16 a switch , 3 pin 5 or 6 a socket outlet , 6 pin 15 or 16 a socket outlet , brass baten angle holder , supply and fixing modular blanking plate , installation of led bulkhead , installation and testing of tube lights , 20 mm pvc conduit , 25 mm pvc conduit , 3x 1.5 sq mm copper wire , 3 x 4 sq mm copper wire , supply of copper armoured cable , supply of copper unarmoured cable , cable laying work , supply and fixing of 6 way,double door mcb board , supply and fixing of 4 way 4 plus 12 ,double door distribution board , supply and fixing of single pole 20 a mcb , supply and fixing of double pole 32 a mcb , supplying and fixing of double pole 40 a mcb , supplying and fixing of double pole 63 a mcb , supplying of led tube , supplying of led bulkhead , supply of pvc cable tray , supply and installation of wall mounted fan , labour charge of cable tray fitting work , supply of copper strip for earthing work , supply of earth road , supply of 1 core 25 sqmm copper cable , supply of ese lightening protection system , fabrication work , labour charges for making 02 nos earthing borewell , labour charges for fitting of copper strip , labour charges , supply of battery charger rewiring of lighthosue tower and installation of ese total quantity : 1441...

Gujarat Water Supply And Sewerage Board - Gujarat

45020372 providing light commercial (small) four wheeler diesel vehicle 1 no. with 4 (four) semiskilled labours in vehicle on basis of as and when required for maintenance and repairing of india mark ii hand pump at different villages of porbandar, ranavav and kutiyana talukas of porbandar district under public health mechanical sub division, porbandar for one year(12 months)....

Cotton Corporation India Limited - Gujarat

45020175 tender for appointment of labour contractor for labour work related to cotton bales for the cotton crop year 2024 25 at the go downs of various districts...

Dakshin Gujarat Vij Company Limited - Gujarat

45001977 tender for labour rates for erection and maintenance of ht/lt line & t/c and maintenance work under all scheme under jalalpore s/dn and any other s/dn area under jurisdiction of navsari city division....

Dakshin Gujarat Vij Company Limited - Gujarat

45001668 tender for labour rates for erection and maintenance of ht/lt line & t/c and maintenance work under all scheme under vijalpore s/dn and any other s/dn area under jurisdiction of navsari city division....

Surat Municipal Corporation - Gujarat

44990173 tender for repairing & desilting of machine holes by entering skill labour with using necessary protecting gers and safety equipments, placing plugs and dewatering pumps etc. in various existing sewage/strom drainage lines, machineholes etc.including carting of desilted materials and debris from site in various society area/at various places of sub zone 1 t.p.s. no. 07 (anjana), t.p.s. no.08 (umarwada) & d.t.p.s. 33 (dhumbhal) in south east zone (limbayat), surat (work no.15)...