Arcelor Mittal Nippon Steel India Limited - Gujarat

44527011 tender for step 6 balance mechanical job 7021427 10 10 10 duct erection 60 to 20 blind fab.and ere. 10 to 30 truss erection 45 to 40 bucket elevator fab. & ere. 10 to 50 damper dismatling 3 no 60 de slagging sys. duct & hood fab. 40 to 70 de slagging sys. duct & hood ere. 40 to 80 conveyor chain erection 600 m 90 bucket installation 300 no 100 elevator chain erection 65 m email : poojan.patel1@amns.in contact : name : poojan patel item details : scope of work for duct/hood fabrication job description: • clearing site and preparation for fabrication. • shifting the material from stores, to and from shifting to blasting yard, cutting to size, leak proof welding. • complete fabrication as per the drawing. • visual preparation, by finishing, grinding extra material, dimensional inspection and report preparation. • visual inspection, dimensional inspection and inspection report signup of the material to be done before final shifting to sand blasting yard <(>&<)> from sand blasting yard to site/temporary storage area. • shifting material from temporary storage area to erection site. scope: • amns will provide material required for the fabrication like plate, sheet. • duct rolling/forming/shaping machine required is in the scope of contractor. • welding machine, cutting set, all tools tackles, jigs and fixtures, pressure testing equipment, measurement equipment will be in the scope of contractor. • all consumables like but not limited to welding rod, gas for cutting grinding wheel will be in the scope of contractor. • contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. • use e 7018 welding electrodes for all welding jobs. • dimensional tolerances (including bending, twisting, skewing, wave tolerances) of more than ±2 mm are not allowed for duct fabrication. • duct and hood fabrication to be done as per the drawings and requirement of the am/ns site in charge. scope of work for duct erection <(>&<)> connection with existing system. job description: • clearing site and preparation for erection. • shifting the material from stores, to and from sand blasting yard, loading, and unloading of the material, cutting to size, leak proof welding. • as am/ns is supplying the fabricated duct portion so there is a hance of mismatch, contractor must consider correcting any mismatch in their scope of work and there will not be any additional claim given. • complete erection as per the drawing. in case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor (no extra claim), site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • visual preparation, by finishing, grinding extra material, dimensional inspection, and report preparation. • visual inspection, dimensional inspection and erection inspection report sign up • shifting the final product remains to stores or location as per the requirement. scope: • welding machine, cutting set, all tools’ tackles, jigs and fixtures, pressure testing equipment, measurement equipment will be in the scope of contractor. page 2 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000117825 date 31.07.2024 submission date 08.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • all consumables like but not limited to welding rod, gas for cutting grinding wheel will be in the scope of contractor. • contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. • blind fabrication and erection as per drawing/sketch wherever required is in the scope of the contractor. • old damper internal butterfly flaps dismantling in the existing duct is in the scope of the contractor. • leak proof welding to be done. • connection of erected ducts with the existing system through proper fitting is in the scope of contractor. • use e 7018 welding electrodes for all welding jobs. scope of work for structure/truss erection job description: • clearing site and preparation for erection. • shifting the material from stores, to and from sand blasting yard, loading and unloading of the material, cutting to size, edge pr eparation, leak proof welding. • complete erection as per the drawing. in case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor, site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • visual preparation, by finishing, grinding extra material, dimensional inspection, and report preparation. • proper leveling <(>&<)> alignment to be done. 5 mm level, 1mm horizontal <(>&<)> lateral alignment. • visual inspection, dimensional inspection and erection inspection report sign up • shifting the final product remains to stores or location as per the requirement. scope: • welding machine, cutting set, all tools tackles, jigs and fixtures, pressure testing equipment, measurement equipment will be in the scope of contractor. • all consumables like but not limited to welding rod, gas for cutting grinding wheel will be in the scope of contractor. • contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. • use e 7018 welding electrodes for all welding jobs. scope of work for bucket elevators fabrication job description: • clearing site and preparation for fabrication. • shifting the material from stores, to and fro shifting to blasting yard, cutting to size, leak proof welding. • complete fabrication as per the drawing. • visual preparation, by finishing, grinding extra material, dimensional inspection and report preparation. • visual inspection, dimensional inspection and inspection report signup of the material to be done before final shifting to sand blasting yard <(>&<)> from sand blasting yard to site/temporary storage area. • shifting material from temporary storage area to erection site. scope: • amns will provide material required for the fabrication like plate, sheet. • bending of the plates for troughs fabrication is in the scope of contractor. • bending machine required for fabrication is in the scope of contractor. • welding machine, cutting set, all tools tackles, jigs and fixtures, pressure testing equipment, measurement equipment will be in the scope of contractor. • all consumables like but not limited to welding rod, gas for cutting grinding wheel will be in the scope of contractor. page 3 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000117825 date 31.07.2024 submission date 08.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. • use e 7018 welding electrodes for all welding jobs. • hole drilling to be done as per the drawing. • dimensional tolerances (including bending, twisting, skewing, wave tolerances) of more than ±2 mm are not allowed for elevators fa brication. scope of work for erection of conveyor chain, bucket elevator, chain <(>&<)> bucket for bucket elevator. job description: • clearing site and preparation for erection. • shifting the material from stores, to and from sand blasting yard, loading, and unloading of the material, cutting to size, edge p reparation, leak proof welding. • complete erection as per the drawing. in case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor, site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • visual preparation, by finishing, grinding extra material, dimensional inspection and report preparation. • proper leveling <(>&<)> alignment to be done. 5 mm level, 1mm horizontal <(>&<)> lateral alignment. • visual inspection, dimensional inspection and erection inspection report sign up. • shifting the final product remains to stores or location as per the requirement. scope: • welding machine, cutting set, all tools tackles, jigs and fixtures, pressure testing equipment, measurement equipment will be in the scope of contractor. • all consumables like but not limited to welding rod, gas for cutting grinding wheel will be in the scope of contractor. • contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. • use e 7018 welding electrodes for all welding jobs. • conveyor chain to be inserted / erected as per the requirement on conveyors. • erection of bucket elevator as per the drawing to be done. • buckets to be fitted as per the requirement on the elevator chain. • bucket elevator chain erection to be done as per the requirement. interconnecting chute (connection from bucket elevator to top common conveyor and elevtor to bottom common conveyor) fabrication and erection. scope of work for sandblasting <(>&<)> painting • clearing site and preparation for sandblasting and painting. • shifting the material from stores, to and from sand blasting yard, loading and unloading of the material. • complete sandblasting and painting as per the specifications. after sandblasting one coat of primer <(>&<)> 2 coats of paint to be applied. • inspection will be done and certification of the proper sandblasting to be signed by amns. painting /primer application shall be only started after the sand blasting certification signed by amns. • inspection will be done and certification of the proper painting/ primer application to be signed by amns. painting /shifting the material shall be only started after the sand blasting certification signed by amns. • shifting the final product /paint remains to stores or location as per the requirement. • amns will provide required amount of paint, thinner, primer. • all equipment like compressor, painting gun, hoses and sand blasting equipment, all tools tackle for lifting and shifting, packing, support, jigs and fixtures, measurement equipment will be in the scope of contractor. page 4 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000117825 date 31.07.2024 submission date 08.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • all consumables like but not limited to copper slag, diesel, oil or anything other than (paint, thinner or primer) will be in the scope of contractor. • contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. scope of work for scaffolding services • clearing site and preparation for scaffolding. and handing over site after removal of the scaffolding completely clean. • shifting the material from stores, loading and unloading of the material. • complete scaffolding as per the amns instruction manual and will be considered complete after certification from the scaffolding c ertification engineer. • both side open margin of 150mm will be maintained on all pipes. • contractor should strictly adhere to the scaffolding standard laid by am/ns india. • contractor shall provide pipes and clamps, safety net, rope, aluminum ladders and all material required for making scaffolding. • scaffolding will be dismantled only after preparation of the erection certification report nd approval from site in charge. special scope of work for contractor (applicable for all jobs) • am/ns india will provide plate/sheet, rolled section, corrugated sheets, fasteners required for fabrication <(>&<)> erection of various items. • primer, paint <(>&<)> thinners will be supplied by am/ns india. • all types of cranes, hydra, trailer, man lifter, jcb, loader (lifting <(>&<)> shifting equipment) are in contractor’s scope and aging of the equipment must adhere am/ns safety guidelines. • all equipment deployed must in be new condition and strictly adhere to guidelines suggested by am/ns india. farana f 15 or higher version of hydra must be deployed. • services required to execute and complete the job in all respect such as but not limited to scaffolding, blasting and painting lifting and shifting, site preparation, mob demob etc. are in the scope of the contractor, no separate po line item is generated. contractor cannot demand any specific additional cost. the cost should include such jobs required to complete the job in all respect. • bending, rolling, shaping, forming, drilling of plates/sheet for fabrication of various equipment or duct in in the scope of contractor and machines required for bending, rolling, shaping, forming, drilling is also in the scope of contractor. • scaffolding services/safety net are in contractor’s scope. • sand blasting <(>&<)> painting is in contractor’s scope. • alignment <(>&<)> leveling is in contractor’s scope. • tolerances of more than ±5 mm for level <(>&<)> ±1mm for horizontal <(>&<)> lateral alignment are not allowed. • material lifting and shifting is in contractor’s scope. • assistance during commissioning is in contractor’s scope. • final site painting is in contractor’s scope. • fabrication <(>&<)> erection of platform and access to platform as per the drawing is in contractor’s scope. • re welding of weld joints to be done if required after inspection. • job quantity will be decided by the department/site in charge. • contractor shall furnish details of subcontractors hired for fabrication, erection, laser cutting, and other manufacturing processes. • contractor shall furnish details of vendors from which the equipment (crane, trailer etc.) is hired for various job. • contractor should provide equipment deployment schedule. • contractor should deploy required amount of skilled manpower to finish the job within the stipulated timeline. contractor should provide manpower deployment schedule. • contractor shall complete the job as per the approved specifications, page 5 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000117825 date 31.07.2024 submission date 08.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details drawings, and as per the direction <(>&<)> satisfaction of amns engineer in charge. • contractor shall ensure for housekeeping/cleaning of the area including cleaning /removing the debris/scrap/waste and used material and shifting the same/surplus materials to the location specified or shown by the engineer, area in charge. bill certification will be only done after complete housekeeping. • contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all required ppe’s (personal protective equipment). • contractor shall ensure that all the tools and tackles deployed are certified by competent authority for use in factory. certificate should be duly valid at all points of time. • hse requirement contractor shall comply with the health, safety and environment policy as laid down by amns steel limited. • penalty will be applicable for violating safety norms as per amns policy. • ld will be applicable for not completing the job as per the agreed timeline with site in charge. note 1 the quantities shown in drawing is for estimation. however, it may increase or decrease depending on the actual requirements. • billing strategy – all dimension, level, alignment, inspection etc. reports to be submitted first before raising the measurement sheet. only upon the completion of a line item entirely, as per the drawings and satisfaction of site incharge invoice can be raised. ...

Ministry Of Railways - Gujarat

44272455 bids are invited for personal protective equipment (v2) safety footwear as per is 15298 (part 2) (q2) ( pac only ) total quantity : 38...

Western Railway - Gujarat

44237362 bids are invited for personal protective equipment (v2) safety footwear as per is 15298 (part 2) (q2) total quantity : 30...

Arcelor Mittal Nippon Steel India Limited - Gujarat

44121529 tender for admin 2000154563 p& f office workstations csp caster&cspmill 2000154563 10 10 10 p & f table, drawer & file cabinet 345 ft2 20 p&f wooden partit. with glass & laminate 205 ft2 email : tejal.thakkar@ext.amns.in contact : name : tejal thakkar item details : technical contact person: mr. baby, taj, mob +91 6358869319 mr. reddy, ananda, mob +91 7990166042 mr. rathod, dharmendrasinh, mob +91 9879103363 providing and fixing office workstations for new joiners and gets for csp caster and csp mill at plant area. scope of work vendor: a. area of work will be plant areas, and vendor must extend the support by executing the job as instructed by in charge / head administration. b. all job related manpower and resources provided by vendor. c. disposal of scrap after work will be vendor scope at location informed by the amns. d. permit to work‟ (ptw) system must be followed by the contractors personnel where required within amns premises. e. contractor shall ensure all his staff are aware of company safety and fire regulations whilst on company premises. f. accommodation, transportation to and from work site, and medical/insurance shall be borne by contractor for his personnel. g. the contractor shall supply their manpower with personal protective equipment, consisting of, but not limited to the following: h. safety boots/shoes i. safety helmet j. safety glasses k. hearing protectors l. hand gloves m. any other special safety equipment shall be supplied by amns. n. although each person will be being given the safety induction and will be familiar with the amns safety regulations, this will not deduct from the responsibilities of the chosen contractor to the termination of that manpower. the contractor shall make replacement of persons at no additional cost to amns. o. performance of the contractor shall be monitored continuously to ensure they meet acceptable standards of service. if amns is not satisfied with the contractors work the contract shall be terminated, at no additional cost to amns. p. contractor shall be deemed to have full working knowledge and have obtained all necessary information and data of company facilities at which services are to be performed, including, where applicable, prevailing location, physical conditions, hygienic state, access, contingencies, and all other circumstances under which the services shall be performed. services q. contractor vehicles entering amns site shall be well maintained and should be as per amns safety standards and shall be inspected by company designated representative. r. the contractor shall ensure that his work force is covered under the required insurance as per government rules and regulations. s. the contractors shall prepare the security gate passes for their page 2 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116413 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details personnel and furnish all information requested bypass issuing authority. t. other terms and conditions shall be as per amns rules and regulations. u. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. v. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. scope of work amnsi: a. site supervision, quality of work & cleaning to be check by area in charge. if quality of work not up to mark area in charge can stop service immediately specific penalty for nonperformance by vendor and must be cardinally measured: yes. a. delays will attract penalty of 5000/instance. item description providing and fixing of office workstations at csp caster and csp mill as per attached annexure 1 and 2. uom lot qty 1 details description office furniture: work station: 25 mm top side good quality semi marine ply finished with good quality 2 mm laminate include metal frame with powder coated 8 module pop up box+ metal raceway (white pvd) inculde,pedestal (3 drawer) using 18 mm semi marine playwood front& 12 mm playwood side& 6mm back side soothly operational telescopic channel , for exp.4ftx2.5ftx2ft(10ft2) uom ft2 qty. 345 description workstation partition: bpg colour glass center partition(8mm) include all hardware uom ft2 qty. ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

44121504 tender for admin 2000154583 p&f off workstations vario locatio plant b 2000154583 10 10 10 p & f table, drawer & file cabinet 332 ft2 20 p&f wooden partit. with glass & laminate 195.5 ft2 email : tejal.thakkar@ext.amns.in contact : name : tejal thakkar item details : technical contact person: mr. baby, taj, mob +91 6358869319 mr. reddy, ananda, mob +91 7990166042 mr. rathod, dharmendrasinh, mob +91 9879103363 providing and fixing of office workstations for new joiners and gets at various locations of plant b area. scope of work vendor: a.,,area of work will be plant areas, and vendor must extend the support by executing the job as instructed by in charge / head administration. b.,,all job related manpower and resources provided by vendor. c.,,disposal of scrap after work will be vendor scope at location informed by the amns. d.,,permit to work‟ (ptw) system must be followed by the contractors personnel where required within amns premises. e.,,contractor shall ensure all his staff are aware of company safety and fire regulations whilst on company premises. f.,,accommodation, transportation to and from work site, and medical/insurance shall be borne by contractor for his personnel. g.,,the contractor shall supply their manpower with personal protective equipment, consisting of, but not limited to the following: h.,,safety boots/shoes i.,,safety helmet j.,,safety glasses k.,,hearing protectors l.,,hand gloves m.,,any other special safety equipment shall be supplied by amns. n.,,although each person will be being given the safety induction and will be familiar with the amns safety regulations, this will not deduct from the responsibilities of the chosen contractor to the termination of that manpower. the contractor shall make replacement of persons at no additional cost to amns. o.,,performance of the contractor shall be monitored continuously to ensure they meet acceptable standards of service. if amns is not satisfied with the contractors work the contract shall be terminated, at no additional cost to amns. p.,,contractor shall be deemed to have full working knowledge and have obtained all necessary information and data of company facilities at which services are to be performed, including, where applicable, prevailing location, physical conditions, hygienic state, access, contingencies, and all other circumstances under which the services shall be performed. services q.,,contractor vehicles entering amns site shall be well maintained and should be as per amns safety standards and shall be inspected by company designated representative. r.,,the contractor shall ensure that his work force is covered under the required insurance as per government rules and regulations. s.,,the contractors shall prepare the security gate passes for their personnel and furnish all information requested bypass issuing page 2 of 2 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116416 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details authority. t.,,other terms and conditions shall be as per amns rules and regulations. u.,,no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. v.,, vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. scope of work amnsi: a.,,site supervision, quality of work & cleaning to be check by area in charge. if quality of work not up to mark area in charge can stop service immediately specific penalty for nonperformance by vendor and must be cardinally measured: yes. delays will attract penalty of 5000/instance. item description providing and fixing of office workstations at various locations of plant area as per attached annexure 1 uom lot qty 1 details office furniture: ,, work station: 25 mm top side good quality semi marine ply finished with good quality 2 mm laminate include metal frame with powder coated 8 module pop up box+ metal raceway (white pvd) inculde,pedestal (3 drawer) using 18 mm semi marine playwood front& 12 mm playwood side& 6mm back side soothly operational telescopic channel , for exp.4ftx2.5ftx2ft(10ft2) uom ft2 qty. 332 description workstation partition: ,, bpg colour glass center partition(8mm) include all hardware,, uom,, ft2 qty. 195.5 item...

Arcelor Mittal Nippon Steel India Limited - Gujarat

44121463 tender for insulation and cladding work for cgl#3 & cgal 27021140 10 10 10 fixing of insulation work with cladding 3,000 m2 email : sandeep.patil@amns.in contact : name : sandeep patil item details : scope of the contractor related to the fixing insulation and cladding on tanks, ducts, and pipes: 1. erection of insulation and cladding on equipment’s, tanks, ducts, and pipes in cgal as per specification and drawings provided by oem. 2. rockwool mat (pro rox 960) (50 100) mm thk, with galvanised steel mesh and ss stitching wire density 100 kg/m³, with wire net and self tapping screws, aluminium sheet cladding. 3. providing skilled <(>&<)> sufficient manpower like supervisors, technicians, riggers, scaffolders, helpers to complete job in given period. 4. all the required tools, tackles, machines with consumables will be in scope of contractor. 5. insulation work will be in different sections of line at different heights from 0 to 30 meters. 6. preparation of proper scaffolding platforms as per amns safety standards for insulation work will be in scope of contractor along with certified scaffold inspector. 7. all the work required to complete the job in totality but not mentioned in sow will be in scope of contractor. 8. shifting of insulation material from storage location to cgal site. 9. open package inspection of each package with oem <(>&<)> am/ns. 10. preparation of job procedure/itp/ wps/pqr for work to be submit before commencement of work. 11. supply of welding machines, grinding machines, welding electrodes, grinding wheels. (welding rods must be procured from approved vendors by amns) 12. co ordinate with am/ns and equipment supplier for the planning of sequential and quality work execution in accordance with the best engineering practice. 13. preparing <(>&<)> taking handing over protocols with mechanical erection contractor. 14. contractor must store material properly at site and maintain proper housekeeping of working area <(>&<)> shift unwanted material at designated place. 15. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types (welding rods make must be approved from amns), cutting wheels, highspeed vibrator with leads <(>&<)> needles, brick cutter <(>&<)> muller (with hot standby mixture) etc in scope of contractor. 16. sufficient illumination to be maintain when work is in progress. lightening arrangement to be done by contractor, supply sufficient number of lamps, portable fans etc will be scope of contractor. fans <(>&<)> lamps must confirm safety standard of amns. 17. resources deployment plan to be submit as per requirement of project. 18. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. sunday will be working day. 19. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material as per amns standard and certified scaffolding inspector. safety nets to be deploy at height work safety net must confirm to is: 11057 1984, max size of net opening 10cm x 10 cm and make should be karam or equivalent. safety page 2 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details harness should contain standard double lanyard to carry tools <(>&<)> tackles while working at height. 20. all workers will deploy to height work must having height pass certified by am/ns. 21. working inside equipment/tanks must confirm to confined space entry safety protocol of amns. 22. contractor supposed to be carried out activity within sops <(>&<)> reference documents provided by am/ns are available in this link https://www.amns.in/safety/. contractor must give confirmation while submitting offer. general points 1. contractor shall depute adequate number of staff, supervisors, skilled, semi skilled <(>&<)> un skilled labours to execute the job as per the time schedule. adequate number of safety supervisors. they must execute the job in coordination with oem <(>&<)> am/ns team. 2. a qualified safety manager to be deployed with complete safety org chart. 3. a qualified <(>&<)> competent qa/qc engineer to be deployed to meet qa/qc standard of amns. 4. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 5. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. 6. contractor must follow the safety rules of am/ns. 7. opening of the boxes of the material in contractor scope. 8. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. 9. proper housekeeping of the erection area in contractor scope. 10. contractor shall provide all the personal protective items like boiler suit, frp helmet, safety shoes, reflective jacket, goggles, hand gloves, mask to all the team members according to the requirement and ensure 100% use of the same. 11. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 12. am/ns will provide the required drawings/ documents of the equipment required for the erection. the contractor shall return the same after completion of job. 13. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. 14. unwanted <(>&<)> scrape material to be shift by contractor to designated place. information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. list of tools <(>&<)> tackles to be deploy. 5. reference list for similar kind of jobs done. primary hse requirementinitial documents required to start work: 1. hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3. hira (hazard identification and risk assessment) of activities. 4. tool and tackles third party inspection certificates. 5. dedicated safety manager should depute at site with organogram of company. 6. communication contact details with mobile no. /email id. 7. list of vehicle/equipment/machines with tpi and other relevant legal page 3 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details documents. 8. list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter(note the scaffolding team will be screened by our team to verify their competency level.) scaffolding material must be approved <(>&<)> certified by tpi. some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss andconduct mock drill every month. 4. take work permit as per amns ptw system, and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. use of mobile phone is restricted while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type andalways tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standardtool lanyard and standard tool bag must be page 4 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02, dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blanket. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. 4. he should be medically fit(the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report)and should possess a valid medical fitness certificate for work at height jobs from care hospital atarcelormittal nippon steel india,hazira complex (cnh)before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall page 5 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) general points related to scaffolding: 1. prior to start any scaffolding related activity, it is mandatory to submit scaffold materials quantity and tpi along with safe work method for the same. it will help in smooth monitoring and accountability of scaffold material. 2. amns will consider only certified scaffold inspector after verifying his certificate, training, and knowledge. so, deploy a scaffolding inspector with valid certification and adequate knowledge. 3. base plate (100 x 100 x 3 mm) is mandatory for every vertical pipe while making a scaffolding. sole plate shall also be used at all unpaved area to support base plate. 4. a scaffolding platform will only be considered as fully safe after provision of all the minimum mandatory requirements/supports. 5. provision of access ladder, top <(>&<)> mid hand railing, toe board and tagging system is mandatory for each <(>&<)> every scaffolding structure. 6. appropriate barricades shall be installed to protect people in the vicinity during scaffold erection, use, modification, and dismantling. as far as practicable, barricades shall be provided by keeping a clear distance of 1.0 meter from scaffold structure. 7. fall protection when erecting, dismantling, and modifying scaffolds shall be under the direction of a competent person (scaffold supervisor/inspector). 8. scaffolds shall be designed to support at least 4 times of the anticipated weight of men/material. 9. scaffold shall be constructed at least 2 planks wide (minimum) at all the sides. onlyanti skidtype planks are allowed to be used for scaffolding structure. 10. during the erection stage of a scaffold, warning notices with the wordingscaffold incomplete, don not useshall be fixed to all the scaffold access points. 11. the status board with the wordingscaffold complete, safe for useshall be displayed when the scaffold is ready to use. 12. once erected the scaffolding shall be inspectedevery weekand recorded. scaffold after due date of inspections shall not be permitted for use without re inspection by the scaffolding inspector. 13. both erection <(>&<)> removal of scaffold shall be done through permit to work. 14. person who uses scaffold shall be trained. he shall know the safe work practices to be performed, able to assess the hazards and can take proper protective measures. 15. any non standard or damaged material shall not be used on the scaffold. those materials shall immediately declare as scrap. 16. all the material used shall be up to the amns standard and shall only be used as per its designed/designated place. any alteration shall be approved from a competent person before implying it on ground. 17. toe board shall be fixed at the platform to restrict fall of materials/person. 18. permit to work at height is mandatory for working on a scaffolding platform. also, the person working on the platform shall have valid height pass and full body harness with them. 19. contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns are available in this link https://www.amns.in/safety/. contractor must give confirmation while submitting offer. page 6 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details exclusions from contractor’s scope: 1. drawings, qap approved document, delivery schedule will be provided by amns. 2. insulation and cladding material will be supplied by amns. 3. electrical power <(>&<)> water at single point at cgal line...

Arcelor Mittal Nippon Steel India Limited - Gujarat

44107509 tender for admin 2000154834 p&f off workstations for new joiners get pl 2000154834 10 10 10 work station office table 1,170 ft2 20 work station partition 702 ft2 email : tejal.thakkar@ext.amns.in contact : name : tejal thakkar item details : technical contact person: mr. baby, taj, mob +91 6358869319 mr. reddy, ananda, mob +91 7990166042 mr. rathod, dharmendrasinh, mob +91 9879103363 providing and fixing office workstations for new joiners and gets for at plant area. scope of work vendor: a. area of work will be plant areas, and vendor must extend the support by executing the job as instructed by in charge / head administration. b. all job related manpower and resources provided by vendor. c. disposal of scrap after work will be vendor scope at location informed by the amns. d. permit to work‟ (ptw) system must be followed by the contractors personnel where required within amns premises. e. contractor shall ensure all his staff are aware of company safety and fire regulations whilst on company premises. f. accommodation, transportation to and from work site, and medical/insurance shall be borne by contractor for his personnel. g. the contractor shall supply their manpower with personal protective equipment, consisting of, but not limited to the following: h. safety boots/shoes i. safety helmet j. safety glasses k. hearing protectors l. hand gloves m. any other special safety equipment shall be supplied by amns. n. although each person will be being given the safety induction and will be familiar with the amns safety regulations, this will not deduct from the responsibilities of the chosen contractor to the termination of that manpower. the contractor shall make replacement of persons at no additional cost to amns. o. performance of the contractor shall be monitored continuously to ensure they meet acceptable standards of service. if amns is not satisfied with the contractors work the contract shall be terminated, at no additional cost to amns. p. contractor shall be deemed to have full working knowledge and have obtained all necessary information and data of company facilities at which services are to be performed, including, where applicable, prevailing location, physical conditions, hygienic state, access, contingencies, and all other circumstances under which the services shall be performed. services q. contractor vehicles entering amns site shall be well maintained and should be as per amns safety standards and shall be inspected by company designated representative. r. the contractor shall ensure that his work force is covered under the required insurance as per government rules and regulations. s. the contractors shall prepare the security gate passes for their personnel and furnish all information requested bypass issuing authority. page 2 of 2 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116272 date 06.07.2024 submission date 13.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details t. other terms and conditions shall be as per amns rules and regulations. u. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. v. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. scope of work amnsi: a. site supervision, quality of work & cleaning to be check by area in charge. if quality of work not up to mark area in charge can stop service immediately specific penalty for nonperformance by vendor and must be cardinally measured: yes. a. delays will attract penalty of 5000/instance. item description providing and fixing of office workstations at new joiners and gets as per attached annexure 1 uom lot qty 1 details description office furniture: work station: 25 mm top side good quality semi marine ply finished with good quality 2 mm laminate include metal frame with powder coated 8 module pop up box+ metal raceway (white pvd) inculde,pedestal (3 drawer) using 18 mm semi marine playwood front& 12 mm playwood side& 6mm back side soothly operational telescopic channel , for exp.4ftx2.5ftx2ft(10ft2) uom ft2 qty. 1170 description workstation partition: bpg colour glass center partition(8mm) include all hardware uom ft2 qty. 702 item note :...

Arcelor Mittal Nippon Steel India Limited - Gujarat

44000012 tender for admin 2000153424 refurbishment of hbi offices (module 01 to 2000153424 10 10 10 p & f table, drawer & file cabinet 250 ft2 20 p & f partition soft board table 350 ft2 30 false celling 60 m2 40 p & a 2 coats of acrylic exterior paint 250 m2 50 application of one coat paint/primer 50 m2 60 scaffolding with material for upto 10mtr 100 m3 70 providing and fixing roller blind 520 ft2 80 p&f of 32mm thick wooden trap door 6 m2 90 providing & fixing door closer 4 no 100 removing old glass 200 ft2 110 providing & fixing switch board 24 no 120 p& f led ceiling square light 15 no email : tejal.thakkar@ext.amns.in contact : name : tejal thakkar item details : technical contact person: mr. baby, taj, mob +91 6358869319 mr. reddy, ananda, mob +91 7990166042 mr. rathod, dharmendrasinh, mob +91 9879103363 refurbishment of hbi offices (module 01 to 04) scope of work vendor: a. area of work will be hbi offices, and vendor has to extend the support by executing the job as instructed by in charge / head administration. b. all consumable with required spares items will be under the scope of the vendor. c. after receiving the work order, the vendor will start the work within 7 days, and work will be completed within 04 weeks. d. all job related manpower and resources provided by vendor. e. disposal of scrap/debris after work will be vendor scope at location informed by the amns. f. all existing fittings and doors /windows removal will be done. g. permit to work (ptw) system must be followed by the contractors personnel where required within amns premises. h. contractor shall ensure all his staff are aware of company safety and fire regulations whilst on company premises. i. accommodation, transportation to and from work site, and medical/insurance shall be borne by contractor for his personnel. j. the contractor shall supply their manpower with personal protective equipment, consisting of, but not limited to the following: • safety boots/shoes • safety helmet • safety glasses • hearing protectors • hand gloves • any other special safety equipment shall be supplied by amns k. although each person will be being given the safety induction and will be familiar with the amns safety regulations, this will not deduct from the responsibilities of the chosen contractor to the termination of that manpower. the contractor shall make replacement of persons at no additional cost to amns. k. performance of the contractor shall be monitored continuously to ensure they meet acceptable standards of service. if amns is not satisfied with the contractors work the contract shall be terminated, at no additional cost to amns. l. contractor shall be deemed to have full working knowledge and have obtained all necessary information and data of company facilities at which services are to be performed, including, where applicable, prevailing location, physical conditions, hygienic state, access, contingencies and all other circumstances under which the services shall be performed. services m. contractor vehicles entering amns site shall be well maintained and should be as per amns safety standards and shall be inspected by company designated representative. n. the contractor shall ensure that his work force is covered under the required insurance as per government rules and regulations. o. the contractors shall prepare the security gate passes for their page 2 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000115853 date 01.07.2024 submission date 08.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details personnel and furnish all information requested bypass issuing authority. p. other terms and conditions shall be as per amns rules and regulations. q. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. r. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited scope of work amnsi: a. site supervision, quality of work & cleaning to be check by area in charge. if quality of work not up to mark area in charge can stop service immediately. specific penalty for nonperformance by vendor and must be cardinally measured: yes a. daily penalties of rs 5000/ will be charged in case of any delay from the committed period. description providing and fixing office staff table with laminate finish with pedestal: qty: 20 nos. • providing and fixing table using 18 mm good quality semi marine plywood tabletop finished with good quality laminate including pedestal. • providing & fixing one keyboard drawer using 18 mm plywood on front, 12 mm on sides and back in 6 mm plywood • smoothly operational telescopic channel for drawers. • all necessary fixtures like hinges, screw, fevicol, locks included. • 1 seater measurement considered as – length: 5.0ft, width: 2.5ft, hight:2.5 ft. unit sft qty 250 description providing & fixing partition with soft board between table: • providing & fixing of wooden partition of cabin by using plywood & laminate finish & wooden patti if required with 2 coats of melamine polish. unit sft qty 350 description providing & fixing of false ceiling 2’*2’, make: armstrong unit m2 qty 60 description surface preparation by scrapping and cleaning and two coats of acrylic distemper, make: asian / berger unit m2 qty 250 description providing and applying birla putty with one coat primer make: jk white unit m2 qty 50 description providing and fixing scaffolding up to 10 m hight. unit m3 page 3 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000115853 date 01.07.2024 submission date 08.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details qty 100 description providing and fixing of roller blinds, make: vento / equivalent unit sft qty 520 description repairing and maintenance of wooden door with frame (32 mm thik laminated plush door with 2mm sun mica, aldrop and door lock) unit m2 qty 6 description providing and fixing of door closer unit nos qty 4 description replacement of damaged window glasses 8 mm thik unit sft qty 200 description provide and fixing of 8 m board with 3 socket and 2 switches, make: provide and fixing of 8 m board with 3 socket and 2 switches unit nos qty 24 description provide and fixing 2x2 led ceiling lights, make: panasonic unit nos qty 15 ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43871494 tender for alloy furnace melting shop shed 1 27020570 10 10 20 erection of structur steel 60 to 10 fabrication of ms structure 60 to 30 fixing of sheets 2,000 m2 email : anurag.gupta@amns.in contact : name : anurag gupta item details : *scope of work for vendor: vendor have to considered raw material as mentioned in drawing/bom. all the required raw material, manpower / general tools <(>&<)> tackles will be in vendor scope. vendor will manufacture shed items as per drawing at their works and installation shall be done at amns site. all the statutory requirements for the labours labour license/ p.f/ insurance/ medical/ transportation will be arranged and managed by vendor. all required manpower and general tool’s tackles required for the job will be managed by vendor. mandatory personal protective equipments (ppes) required for the job like safety shoes, safety goggles, safety helmet, cotton hand gloves, ear plugs and boiler suit shall be provided by vendor. all required consumable like gases, welding electrodes, and grinding wheels etc. for the job would be arranged and managed by vendor. erection of structure and related structures to be carried out as per the ts. final painting as per site requirement and instruction by am/ns. blasting <(>&<)> painting of ms structure as per technical specification. loading, unloading <(>&<)> transporting the fabricated structure from fabrication ots yard to painting <(>&<)> blasting yard and after blasting <(>&<)> painting loading <(>&<)> transporting the project @ amns hazira. unloading of fg will be done by erection contractor. crane/ hydra required for shed installation shall be in vendor scope. all safety compliance / norms has to follow as per amns. * scope of work for amns: amns has to provide power, air, water <(>&<)> safe place for execution of job at free of cos...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43754941 tender for erect.& alignment of apc section of cgal 27020822 10 10 80 supply of manpower for stabilization of 200 tag 30 fab.& erection of light structure 50 ton 20 erection,alignment,testing,commissioning 1,150 ton 70 only fixing of chemical/mechanical hilti 200 no 10 erect.& align of technological structure 1,250 ton 40 dismantling of tech structure /equipment 150 ton 50 modification in structure & equipment 100 ton 60 supply & fixing of chemical hilti bolts 200 no email : sandeep.patil@amns.in contact : name : sandeep patil item details : scope of work scope of work for erection <(>&<)> alignment of after pot cooling (apc) section of continuous galvanizing <(>&<)> annealing line (cgal) brief summary of the project – am/ns, hazira is in process of installation of 1 mtpa cgal and for this we need a contractor who is specialized in continuous galvanizing line <(>&<)> annealing line for complete erection and alignments jobs which includes erection <(>&<)> alignment of technological structure, equipment of after pot cooling (apc), light structure fabrication as per the below mentioned scope. the brief description of the equipment’s under the scope will be as mentioned in below table. s. no. unit type approx. weight in mt oem 1 cgal furnace (230 tph) thickness range 0.5 to 2.5 mm width 900 1850 mm capacity 1 mtpa line speed 700 mpm max technological structure = 1250 mt equipment = 1150 mt total = 2400 mt m/s john cockerill page 2 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details total 2400 mt location of site: hazira, surat, gujarat scope of the contractor related to the erection <(>&<)> alignment of mechanical equipment : job procedure/ itp/ wps/ pqr for work to be submit before commencement of work. unloading, shifting, unpacking, and stacking of equipment/structures at the designated place (storage yard). maintaining equipment wise location tracking <(>&<)> shifting to site for erection as per requirement. open package inspection of each package with oem <(>&<)> am/ns. co ordinate with am/ns and equipment supplier for the planning of sequential and quality work execution in accordance with the best engineering practice. fixing of permanent datum marks for future reference. checking the equipment’s foundation in accordance with the erection drawing, marking of centre lines and levels with reference to the benchmark. preparing <(>&<)> taking handing over protocols with civil equipment foundations. fixing of pad plates as per required level. erection and alignment of technological structure, final cool panels, final cool casing <(>&<)> its equipment, <(>&<)> pot equipment, electrical equipment, motors, blowers, ducting, etc as per the layout <(>&<)> alignment as per the specifications of oem. erection and alignment of technological structures, platforms, gratings, handrails etc. preparation of the protocol of the final alignment <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. checking of the final alignment by concerned authority of equipment supplier <(>&<)> am/ns. correction in the alignment if found beyond tolerance limits. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. clearance for final grouting of the equipment’s. assembly of equipment’s at site, drilling tapping work (if any), page 3 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details first filling of oil and lubricants. first fill will be provided by amns. fixing of the instruments on the equipment as per the drawing. assisting in cold <(>&<)> hot commissioning of the line. attend the work if any during commissioning. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, tig welding machine, cutting wheels, wire rope for equipment lifting <(>&<)> shifting, die penetration kit for welding testing, cold bending machines for pipe bending etc in scope of contractor. all tools, tackles, consumables <(>&<)> instruments required like arc welding machines, argon welding machines, cutting sets, pug cutting machines, hydraulic jacks <(>&<)> pumps, puller, chain pulley blocks, all types <(>&<)> sizes of spanners etc. all types of measuring equipment like micrometres, vernier gauge, piano wires, total stations, torque wrenches, automatic surveyor’s level, theodolite, dial gauge, feeler gauges, slip gauges, will be in scope of contractor. all equipment’s required for storage and erection like farhana, forklift, trailers etc. and ensuring adequate number of equipment to perform parallel erection activity throughout the length 24x7. cranes <(>&<)> man lifter for erection will be provided by am/ns. all alignment tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to am/ns before commencement of work. calibration certificate must be within one month before start of work. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type <(>&<)> planks) and certified scaffolding inspector. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. all height work approach to be done with man lifters. wherever man lifter approach is not available proper scaffolding platform will be required. safety nets must be installed for fall protection for height works. safety net must confirm to is: 11057 1984, max size of net opening 10cm x 10 cm and make should be karam or equivalent. farhana f15/ f23 for internal shifting of equipment’s. (hydra is not allowed) cutting of plates for fabrication/trench covers etc to be done using pug cutter only. misc. requirement related to erection of the equipment’s. for example, hole drilling, minor slot cutting as per requirement etc. maximum working height will be 65 metre (refer to cgal ga) couple, decouple and again couple all the couplings during commissioning. assistance for balancing work of blowers as and when required (if vibration found beyond the norms during trial or commissioning). page 4 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details erection of technological structure to be done with mobile cranes. erection of apc <(>&<)> equipment to be done with mobile cranes till availability of eot crane. correction required need to be done to equipment base, minor modification in civil foundation, structural as per site condition <(>&<)> requirement of project. all structures/ equipment to be properly cleaned prior to erection and should be free from dust. resources deployment plan to be submit as per requirement of project. working hour for contactor’s manpower will 24 x 7 , or as per requirement of site condition. total no of final cool section casing are 66 nos <(>&<)> welding length in running meter of panels approximately will around 1500 meter. tentative weight breakup as follows. total tonnage (mt) 2400 structure <(>&<)> equipment weight (mt) tech structure 1250 final cool casing 160 rolls 180 ducting 150 no of rc fan (8 nos) 7.5 no of he ( 8 nos ) 12.4 apc blowers <(>&<)> plenum 80 pot equipment 295 page 5 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details scope of work specific to cgal project: erection of after pot cooling tower: apc tower with max height of 65 meters having technological structures, plenum, blowers, ducting, tanks, pot equipment <(>&<)> pot lifting arrangement and lift for manpower movement etc as per the layout <(>&<)> alignment as per the specifications of oem. equipment base padding work will be in scope of contractor, supply of masson, cement , shrinkkomp grouting cement etc as well as tools for padding will be in scope of contractor. simultaneous and sequential erection of apc structures, casing, platforms, equipment at each level must be done along with scaffolding with all safety requirements of work at height including lifelines, safety nets and proper handrails, staircase and ladders must be provided. bench mark <(>&<)> level mark to be fix at several locations as mentioned in ts. centre line for line to locate as well parallel line to centre line also to be locate for entire apc. scaffolding will be installed internally throughout as work progresses and externally as per requirement between platforms for alignment and welding work. welding of apc panels as per specifications provided by oem. testing of welded joints will as per ts and correction to be done if welding found not proper. welders deployed by contractor must have valid welder qualification certificate as per wps <(>&<)> pqr (gtaw <(>&<)> smaw process) and to be submitted to am/ns before commencement of work. final cool panel – gas tight welding to be done. panel to be full welded as per ts provided by oem. tentative quantity of apc panel welding 1500 running meter. welding test to be by dpt <(>&<)> red oxide paint to be done on welded joint. supply of paint <(>&<)> painting equipment will be in scope of contractor. alignment of apc panels , apc rolls as per ts. pressure testing of apc ,cold trail <(>&<)> hot trail to be conducted <(>&<)> corrections need to be carry out as per requirement. alignment of technological structure must confirm as per ts provided by oem. page 6 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details alignment of apc structure : columns must be set on a tolerance of ± 1.5 mm from centreline. the plumb of the columns is to be checked at each level, and each level is to be held to a tolerance of ± 5.0 mm overall from the structure foundations. equipment support beams must be set on a tolerance of ± 3 mm elevation. the elevation is to be checked at each level, and each level is to be held to this tolerance of ± 3 mm overall, and not be accumulative from the elevation below. walkie talkie arrangement must be provided for erection activity for proper communication at work at height. foundation bolt must be tightened with torque wrench as per ts <(>&<)> am/ns can ask any time to check fasteners tightening torque and contractor must fulfill the same. fabrication <(>&<)> erection of piping associated with apc which includes, air, fuel, hnx gas. all apc gaskets must create gas tight seal. all fiber fax / equivalent gasket must be coated with sterling/ equivalent varnish <(>&<)> supply of varnish will be scope of contractor. varnish must be purchased locally by an erection contractor and installed on site for all field erected equipment as needed. this ap plies to all apc accessories as well as burner and atmosphere exhaust flanges. proper coordination with refractory and insulation contractor must be done for sequential erection as per ts requirement. some sections of ducting will be in panel construction forms and not in pre assembled forms to avoid mismatch, so it will have to be fabricated and welded as per site requirements. all ducting must be cleaned thoroughly before fixing. all ducting ends must be reamed <(>&<)> cleaned (remove all shaving, slag, dirt and dust before fitting) assembly of all rolls with bearings, bearing blocks, seals and alignment of all rolls as per ts. final touch up of paint to technological structure <(>&<)> equipment as required will be scope of contractor. paint will be provided by am/ns. modifications/correction in technological structures as per site requirements. supply of shims like 0.03mm , 0.05mm, 0.1 mm as per site requirements. painting of the light structure: one coat of red oxide <(>&<)> two coat of paint. colour code as per the am/ns standard. supply of paint <(>&<)> painting equipment will be in contractor scope. working height: 10 metre to + 62 metre (refer to cgal ga) safety harness should contain standard lanyard to carry tools <(>&<)> tackles while working at height. gas cutting torch <(>&<)> nozzle must be of make : esab/messers all workers will deployed to height work must having height pass certified by am/ns. page 7 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details tools <(>&<)> tackles like wire rope sling, web sling must be brand new which is going to deploy at project site for work. penalty will be levied on vendor if equipment / structure material got damaged during handling or erection , amount will be deducted from bill to contractor. minimum 60 nos of manpower required at site to meet project requirement. this manpower projected requirement is purely tentative, this can increase as per progress of project. during trail <(>&<)> commissioning of cgal all work related for apc stabilization like pot equipment change, roll adjustment, apc equipment adjustment work etc need to be done by contractor. lighting arrangement inside of apc <(>&<)> inside of final cool assembly casing will be scope of contractor <(>&<)> must confirm confined space work <(>&<)> amns standard supply of welding rod to weld dis similar metals will be in scope of contractor as per requirement of project. in case dismantling of tech structure for alignment or modification purposes that need to be done by contractor. project tentative time schedule – unit erection start time duration (max) cgal june 2024 6 months general points contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; mill wright fitters, foreman, fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they have to execute the job in coordination with oem <(>&<)> am/ns team. a qualified safety manager to be deployed with complete safety org chart. page 8 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details a qualified <(>&<)> competent qa/qc engineer to be deploy to meet qa/qc standard of amns. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. contractor must follow the safety rules of am/ns. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. proper housekeeping of the erection area in contractor scope. contractor shall provide all the personal protective items like boiler suit, frp helmet, safety shoes, reflective jacket, goggles, hand gloves to all the team members according to the requirement and ensure 100% use of the same. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. am/ns will provide the required drawings/ documents of the equipment required for the erection. the contractor shall return the same after completion of job. shifting of scrap to the designated scrap yard. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. information to be provided in the technical offer – technical offer should have the following information’s – confirmation of all the points mentioned in am/ns inquiry. quality assurance plan. manpower deployment plan. equipment deployment plan. list of tools <(>&<)> tackles list of material handling equipment like farhana, forklift, trailers etc. reference list for similar kind of jobs in cold rolling complex. measurement criteria weight of the equipment will be as per the net weight of the equipment mentioned by the oem supplier in the invoice. page 9 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details temporary fabrication of structure for erection and alignment will not be part of light structure fabrication weight. fabricated pipeline <(>&<)> ducting (supplied by oem) will be considered as tonnage of equipment. annexure no 1 sr no. description / activity uom qty 1 erection <(>&<)> alignment of technological structure mt 1250 2 erection, alignment, testing and commissioning of apc equipment with blowers, motors mt 1150 3 fabrication and erection of light structures mt 150 4 dismantling of tech structure /equipment mt 150 5 modification in structure <(>&<)> equipment mt 100 6 supply <(>&<)> fixing of chemical hilti bolts page 10 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details nos 200 7 only fixing of chemical/mechanical hilti bolts nos 200 8 supply of manpower for stabilization of apc mandays 200 primary hse requirementinitial documents required to start work: 1.hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3.hira (hazard identification and risk assessment) of activities. 4.tool and tackles third party inspection certificates. 5.dedicated safety manager should depute at site with organogram of company. 6.communication contact details with mobile no. /email id. 7.list of vehicle/equipment/machines with tpi and other relevant legal documents. 8.list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter(note the scaffolding team will be screened by our team to verify their competency level.) scaffolding material must be approved <(>&<)> certified by tpi. some other focused requirements are as below: all workers coming at site with adequate and appropriate ppe’s. daily tbt must be done by site engineer in presence of safety person. report all incidents and near miss andconduct mock drill every month. page 11 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details take work permit as per amns ptw system and no work allowed without work permit. a permit box must be available at site. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. proper rest sheds for workers and rain cover shed for electrical equipment. in case of any lifting work, no one allowed under the suspended load. in case of working at height, valid height pass required as per amns norms. make designated assembly point on site and valid first aid box available on site. alcohol, tobacco, and smoking is strictly prohibited on site. use of mobile phone is restricted while entering in plant. all electrical equipment’s must have protected with proper earthing and elcb/rccb. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. area must be barricaded during height work. make one separate training/induction area for workers at site. only 3 pipe type torches shall be used in gas cutting set. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type andalways tied with chain in vertical straight position. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. gas cutting set must be kept in adequate trolley only. farana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. loto kit required in energy isolation work. daily checklist must be filled by farana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. safety motivational program must be done in every month for workers. height register must be maintained at site during work. during working hours one vehicle must be available at site for emergency case. page 12 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details all formats of training, safety committee meeting, mock drill will be of amns. every week and month proper submission of training records and reports. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. at height, standardtool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. all rotating parts must be covered by safety guards. walkie talkie required is mandatory for communication during working at height. body earthing must be available in porta cabin, welding machines and other electrical equipment. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. don’t store any diesel or fuel in stores at site. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02, dpc) must be available at site. make designated assembly point with display at site. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. submit tbra before night work started and inform to amns safety team. (if plan) only frp helmets allowed at site. each worker shall be provided with cover all/boiler suit. identification numbers on each tools and tackles are compulsory on site. every 50 manpower needs 1 safety officer present at site with megaphone. only industrial type ladder with flat rungs is allowed in site. wheel stopper required in each vehicle. proper earthing pit (as per amns electrical department) with testing details displayed on site. no smoking board displayed at required location. availability of sufficient fire blanket. hose and cable for gas cutting work should be of esab brand. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. adequate number of emergency rescue kit should be available at site with trained rescuers. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. page 13 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details retro reflective strips shall be pasted on each vehicle/equipment body. safety officer, electrician and site engineer must be available at site during working hours in day/night. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). the minimum work experience of the personnel is 2 years. he should be medically fit(the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report)and should possess a valid medical fitness certificate for work at height jobs from care hospital atarcelormittal nippon steel india ,hazira complex(cnh)before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) general points related to scaffolding : prior to start any scaffolding related activity, it is mandatory to submit scaffold materials quantity and tpi along with safe work method for the same. it will help in smooth monitoring and accountability of scaffold material. amns will consider only certified scaffold inspector after verifying his certificate, training, and knowledge. so, deploy a scaffolding inspector with valid certification and adequate knowledge. base plate (100 x 100 x 3 mm) is mandatory for every vertical pipe while making a scaffolding. sole plate shall also be used at all unpaved area to support base plate. a scaffolding platform will only be considered as fully safe after provision of all the minimum mandatory requirements/supports. provision of access ladder, top <(>&<)> mid hand railing, toe board and tagging system is mandatory for each <(>&<)> every scaffolding structure. appropriate barricades shall be installed to protect people in the vicinity during scaffold erection, use, modification, and dismantling. as far as practicable, barricades shall be provided by keeping a clear page 14 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details distance of 1.0 meter from scaffold structure. fall protection when erecting, dismantling, and modifying scaffolds shall be under the direction of a competent person (scaffold sup ervisor/inspector). scaffolds shall be designed to support at least 4 times of the anticipated weight of men/material. scaffold shall be constructed at least 2 planks wide (minimum) at all the sides. onlyanti skidtype planks are allowed to be used for scaffolding structure. during the erection stage of a scaffold, warning notices with the wordingscaffold incomplete, don not useshall be fixed to all the scaffold access points. the status board with the wordingscaffold complete, safe for useshall be displayed when the scaffold is ready to use. once erected the scaffolding shall be inspectedevery weekand recorded. scaffold after due date of inspections shall not be permitted for use without re inspection by the scaffolding inspector. both erection <(>&<)> removal of scaffold shall be done through permit to work. person who uses scaffold shall be trained. he shall know the safe work practices to be performed, able to assess the hazards and can take proper protective measures. any non standard or damaged material shall not be used on the scaffold. those materials shall immediately declare as scrap. all the material used shall be up to the amns standard and shall only be used as per its designed/designated place. any alteration shall be approved from a competent person before implying it on ground. toe board shall be fixed at the platform to restrict fall of materials/person. permit to work at height is mandatory for working on a scaffolding platform. also, the person working on the platform shall have valid height pass and full body harness with them. apart from these points all the general safe working method must be followed to ensure risk free working in scaffolding platform. tentative quantity of scaffolding will be = 2000 cubic meter contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns, as per annexure attached below. details documents will be shared with contractor during detailed technical discussion. sr. no sop document reference no. 1 page 15 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details safety signage <(>&<)> display of safety information amns/project/ts/hsem/18 2 night work safety amns/project/ts/hsem/05 3 lone work safety amns/project/ts/hsem/06 4 working near oh lines amns/project/ts/hsem/08 5 waste management amns/project/ts/hsem/11 6 unloading of container amns/project/ts/hsem/12 7 ppes management amns/project/ts/hsem/13 8 plant <(>&<)> machinery operation amns/project/ts/hsem/08 9 handling <(>&<)> storage of compressed gas cylinder amns/project/ts/hsem/06 10 working in confined space amns/project/ts/hsem/14 11 hot work amns/project/ts/hsem/10 12 page 16 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details hydro test amns/project/ts/hsem/06 13 work at height amns/project/ts/hsem/04 14 blasting <(>&<)> painting safety amns/project/ts/hsem/19 15 simultaneous operation amns/project/ts/hsem/17 16 management of hazardous substances amns/project/ts/hsem/15 17 structural steel fabrication <(>&<)> erection amns/project/ts/hsem/11 18 manual material handling amns/project/ts/hsem/05 19 hand tools <(>&<)> portable power tool safety amns/project/ts/hsem/07 20 age of equipment guidelines amns/safe/71 21 loto amns/project/ts/hsem/20 exclusions from contractor’s scope: drawings, qap approved document, delivery schedule will be provided by amns electrical power <(>&<)> water. am/ns will give required power for the execution of job on free of cost basis at one point. page 17 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details any structural steel, plates required for the execution of the job. equipment’s grouting job refractory <(>&<)> insulation work. cranes <(>&<)> man lifter required for equipment erection. tentative required manpower <(>&<)> resources plan: required resources, tools <(>&<)> tackles category number farhana (23 ton – 1 no, 15 ton 2 nos) 2 trailer 1 gas cutter set with trolley 4 arc welding machines (600 amp) 10 tig welding machines 5 single phase welding machine 3 grinding machines 4 tool boxes with spanner set 10 page 18 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details box spanner set 10 pug cutting machine 2 plasma cutting machine 1 induction heater set 2 oil heating set arrangement for bearing 1 torque wrenches 5 chain blocks (1 ton <(>&<)> 2 ton) 5 each chain block (5 ton <(>&<)> 10 ton ) 4 each ff2 grinder 4 portable drilling machine 2 radial drilling machine 1 magnetic drilling machine 2 thread chaser set 2 drill tapping machine 2 hydraulic jacks 10 to 50 ton 8 coupling pullers 3 grease guns page 19 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 4 shim cutter 2 manual oil filling pump 2 motorised pump for oil filling 2 hand blowers 4 extension board for electrical connection 5 wire rope sling (1/2, 3/4,1) 6 pair each web sling (2 ton, 5 ton, 10 ton) 8 pair each d shackle (wll 1 ton, 5 ton, 10 ton) 8 pair each bow shackle (wll 1 ton, 5 ton, 10 ton) 4 pair each welding cable (600 amp) of 100 m <(>&<)> earthing cable 100 m of length for each welding machine electrical power panels, industrial extension boards with 100 m cables, db’s, jb’s, single core/ 3 core armoured cables etc as per requirement. (note : manpower <(>&<)> resources plan is purely indicative and will have to be increased as per front availability and project schedule requirement) ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43382767 tender for structural erection & equipment erection 27020382 10 10 20 erection & comm.of plant equipements 160 to 30 supply of un skilled labour 2,400 tag 10 unloading & erection of structure 700 to email : gopal.thummar@amns.in contact : name : gopal thummar item details : amns scope1. drawings, qap approved document, delivery schedule will be provided by amns 2. electrical power <(>&<)> water. am/ns will give required power for the execution of job on free of cost basis at one point. 3. any structural steel, plates required for the execution of the job. 4. equipment’s grouting job scope of the contractor related to the erection <(>&<)> alignment of mechanical equipment’s : 1. job procedure/itp/ wps/pqr for work to be submit before commencement of work. 2. unloading, shifting, unpacking, and stacking of equipment/structures at the designated place (storage yard). 3. maintaining equipment wise location tracking <(>&<)> shifting to site for erection as per requirement. 4. open package inspection of each package with oem <(>&<)> am/ns. 5. co ordinate with am/ns and equipment supplier for the planning of sequential and quality work execution in accordance with the best engineering practice. 6. fixing of permanent datum marks for future reference. 7. checking the equipment’s foundation in accordance with the erection drawing, marking of centre lines and levels with reference to the benchmark. 8. preparing <(>&<)> taking handing over protocols with civil equipment foundations. 9. fixing of pad plates as per required level. 10. erection and alignment of technological structure, mechanical equipment (metallic <(>&<)> non metallic), non metallic chimney, n on metallic tanks, electrical equipment like motors, pneumatics equipment, etc as per the layout <(>&<)> alignment a specifications of oem. 11. erection and alignment of structures, platforms, gratings, handrails etc. 12. preparation of the protocol of the final alignment <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. 13. checking of the final alignment by concerned authority of equipment supplier <(>&<)> am/ns. correction needs to be done in the alignment if found beyond tolerance limits. 14. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. 15. clearance for final grouting of the equipment’s. 16. assembly of equipment at site, drilling tapping work (if any), 17. first filling of oil and lubricants. first fill will be provided by am/ns. 18. fixing of the instruments on the equipment as per the drawing. 19. assisting in cold <(>&<)> hot commissioning of the line. 20. attend the work if any during commissioning. 21. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, tig welding machine, cutting wheels, wire rope for equipment lifting <(>&<)> shifting, die penetration kit for welding page 2 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details testing, cold bending machines for pipe bending etc in scope of contractor. 22. all tools, tackles, consumables <(>&<)> instruments required like arc welding machines, argon welding machines, cutting sets, pug cutting machines, hydraulic jacks <(>&<)> pumps, puller, chain pulley blocks, all types <(>&<)> sizes of spanners etc. all types of measuring equipment like micrometres, vernier gauge, piano wires, total stations, torque wrenches, automatic surveyor’s level, theodolite, dial gauge, feeler gauges, slip gauges, will be in scope of contractor. 23. equipment’s required for material shifting, stacking and erection like farhana, forklift, trailers etc. will be in scope of contractor and ensuring adequate number of equipment to perform parallel erection activity throughout the length 24x7. 24. cranes <(>&<)> man lifter required for erection will be in scope of contractor. 25. all alignment tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to amns. 26. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type <(>&<)> planks) and certified scaffolding inspector. 27. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. 28. all height work approach to be done only with man lifter. 29. farhana f15/ f23 for internal shifting of equipment’s. (hydra is not allowed) 30. cutting of plates for fabrication/trench covers etc to be done using pug cutter only. 31. misc. requirement related to erection of the equipment’s. for example, hole drilling, minor slot cutting as per requirement etc. 32. balancing work of blowers as and when required (if vibration found beyond the norms during trial or commissioning). 33. erection of technological structure to be done with mobile cranes. 34. equipment erection to be done with mobile cranes till availability of eot crane. 35. correction required need to be done to equipment base, minor modification in civil foundation, structural material as per site c ondition <(>&<)> requirement of project. 36. all structures/ equipment to be properly cleaned prior to erection and should be free from dust. 37. resources deployment plan to be submit as per requirement of project. 38. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. scope of the contractor related to the erection <(>&<)> alignment of structure : 1. making of suitable bed for for controlled assembling of portal, columns, bracings wherever required. dismantling the bed and load ing/unloading at given area or as per instruction of amns engineer if required. 2. all machines, equipment’s, <(>&<)> tackles including jacks (manual <(>&<)> hydraulic). third party/ govt approved agency test certificate required for machinery/ tools <(>&<)> tackles/ equipment. 3. calibration certificate by third party/govt approved agency of all machineries used by contractor. 4. unloading of prefab steel structures <(>&<)> proper stacking with wooden packing at erection site or storage yard as per am/ns in structions. wooden packing shall be in scope of vendor . 5. all fasteners required for preassembly <(>&<)> erection of am/ns approved make <(>&<)> as per specs mentioned as per drawings. 6. thorough cleaning of structures to wipe of dust /muds etc. before erections shall be in scope of vendor. vendor should made appropriate arrangement for the same at site. 7. welding consumables of approved manufacturer. 8. consumables other than welding consumables such as grinding wheel, cutting wheel, buffing wheel, drill bit/ core cutter, da, oxygen etc. page 3 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details spares for machineries, tools and tackles. 9. supply of crane, farana , manlifter , trailer etc. 10. controlled assembly for columns, rafters, bracings, galleries. 11. calibrated measuring instruments required for dimensional checking. 12. manpower should be as per project requirement to meet the time line. 13. site in charge, erection foreman <(>&<)> planning engineer to expedite progress. 14. qc engineer, safety personal (certified by amns qc team). 15. adequate skilled manpower for assembling work as per project requirement. 16. qc checking <(>&<)> offer for amns inspection in prescribed format. 17. welding consumable issue record, welding consumable baking record <(>&<)> wps record. 18. daily progress report in approved format by am/ns. 19. service support during <(>&<)> after client inspection and rectification if required. 20. labour license, compliance of statutory requirements as per govt. norms <(>&<)> amns policies, pf/esic/insurance requirements. 21. processing of gate pass <(>&<)> other formalities. 22. monthly materials reconciliation report. 23. worker accommodation. 24. transportation of workers to worksite. 25. housekeeping at worksite daily area cleaning after work completion and during site evacuation. 26. ppes for workers, supervisors engaged. 27. surveyor with total stations for alignment of structures and offering for inspections. 28. safety apparatus like flashback arrester, dial gauge, conduit pipes flexible wires, db with proper rating elcb/rccb. am/ns india crm#2 project 2 29. providing lifeline, safety harness, safety/florescent jacket, fall arrester, safety net, ladder wherever required. 30. turn buckles, jacks of required capacity. 31. anywhere for whatsoever reasons due to unavailability of access for man lifters, scaffolding shall be in scope of vendor. scaffolding should be tested by scaffolding inspector. arranging scaffolding inspector shall be in scope of vendor. 32. fixing of mounting bolts for assembly wherever required. 33. levelling, alignment, <(>&<)> handing over for eot erection, 34. supply of required approved fasteners as per approved construction drg /am/ns requirement for erection work. 35. any touch paint required before erection /post erection shall be in scope of vendor. 36. header and down take pipe (roof drainage system) shall be integral part and parcel of structural erections. accordingly, vendor shall be provided with pipes of appropriate sizes duly blasted and painted. 37. all erection methodologies /method statements shall be made by contractor and shall be put for approval before am/ns. 38. tolerances in structural erection shall be according to is 12843 (latest revision). 39. vendor should follow safety in structural erection as per is 7205. 40. vendor is liable to complete their scope of work within the battery limits of height and operating radius of cranes. 41. vendor shall make appropriate arrangement of any structural erections by conventional methods, by using chain blocks, manual lif ting, using scaffolding etc in case work is not accessible by cranes ,manlifter etc. . however, lifting plans must be approved by am/ns execution and safety team. 42. qap / job procedures / wps/ pqr / submission of final quality dossier as per approved itp. 43. submission of qap/itp inspection formats, pqp (project quality plan) for approval. 44. qa/qc documentation as per amns requirement (weld visual, ndt <(>&<)> final inspection). 45. keeping qualified and competent qa/qc staffs for maintaining and monitoring quality across the entire project and mitigate/taking corrective and preventive action of any non conformity arises. page 4 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details project tentative time schedule – unit erection start time duration (max) arp 3 aug 2024 6 months general points 1. contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; mill wright fitters, foreman, fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. 2. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they have to execute the job in coordination with oem <(>&<)> am/ns team. 3. a qualified safety manager to be deployed with complete safety org chart. 4. a qualified <(>&<)> competent qa/qc engineer to be deploy to meet qa/qc standard of amns. 5. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 6. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. 7. contractor must follow the safety rules of am/ns. 8. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. 9. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. 10. proper housekeeping of the erection area in contractor scope. 11. contractor shall provide all the personal protective items like boiler suit, frp helmet, safety shoes, reflective jacket, goggles, hand gloves to all the team members according to the requirement and ensure 100% use of the same. 12. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 13. am/ns will provide the required drawings/ documents of the equipment required for the erection. the contractor shall return the same after completion of job. 14. shifting of scrap to the designated scrap yard. 15. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. equipment deployment plan. 5. list of tools <(>&<)> tackles 6. list of material handling equipment like farhana, forklift, trailers etc. 7. reference list for similar kind of jobs in cold rolling complex. measurement criteria 1. the weight of the equipment will be as per the net weight of the equipment mentioned by the oem supplier in the invoice. 2. temporary fabrication of structure for erection and alignment will not be part of light structure fabrication weight. 3. fabricated pipeline <(>&<)> ducting (supplied by oem) will be considered as tonnage of equipment. page 5 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details primary hse requirementinitial documents required to start work: 1.hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3.hira (hazard identification and risk assessment) of activities. 4.tool and tackles third party inspection certificates. 5.dedicated safety manager should depute at site with organogram of company. 6.communication contact details with mobile no. /email id. 7.list of vehicle/equipment/machines with tpi and other relevant legal documents. 8.list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter (note the scaffolding team will be screened by our team to verify their competency level.) scaffolding material must be approved <(>&<)> certified by tpi. some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss and conduct mock drill every month. 4. take work permit as per amns ptw system, and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. use of mobile phone is restricted while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type and always tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. page 6 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standard tool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02, dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blanket. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. 4. he should be medically fit (the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report) and should possess a valid medical fitness page 7 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details certificate for work at height jobs from care hospital at arcelormittal nippon steel india, hazira complex(cnh) before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) general points related to scaffolding : 1. prior to start any scaffolding related activity, it is mandatory to submit scaffold materials quantity and tpi along with safe work method for the same. it will help in smooth monitoring and accountability of scaffold material. 2. amns will consider only certified scaffold inspector after verifying his certificate, training, and knowledge. so, deploy a scaffolding inspector with valid certification and adequate knowledge. 3. base plate (100 x 100 x 3 mm) is mandatory for every vertical pipe while making a scaffolding. sole plate shall also be used at all unpaved area to support base plate. 4. a scaffolding platform will only be considered as fully safe after provision of all the minimum mandatory requirements/supports. 5. provision of access ladder, top <(>&<)> mid hand railing, toe board and tagging system is mandatory for each <(>&<)> every scaffolding structure. 6. appropriate barricades shall be installed to protect people in the vicinity during scaffold erection, use, modification, and dismantling. as far as practicable, barricades shall be provided by keeping a clear distance of 1.0 meter from scaffold structure. 7. fall protection when erecting, dismantling, and modifying scaffolds shall be under the direction of a competent person (scaffold supervisor/inspector). 8. scaffolds shall be designed to support at least 4 times of the anticipated weight of men/material. 9. scaffold shall be constructed at least 2 planks wide (minimum) at all the sides. only anti skid type planks are allowed to be used for scaffolding structure. 10. during the erection stage of a scaffold, warning notices with the wording scaffold incomplete, don not use shall be fixed to all the scaffold access points. 11. the status board with the wording scaffold complete, safe for use shall be displayed when the scaffold is ready to use. 12. once erected the scaffolding shall be inspected every week and recorded. scaffold after due date of inspections shall not be permitted for use without re inspection by the scaffolding inspector. 13. both erection <(>&<)> removal of scaffold shall be done through permit to work. 14. person who uses scaffold shall be trained. he shall know the safe work practices to be performed, able to assess the hazards and can take proper protective measures. 15. any non standard or damaged material shall not be used on the scaffold. those materials shall immediately declare as scrap. 16. all the material used shall be up to the amns standard and shall only be used as per its designed/designated place. any alteration shall be approved from a competent person before implying it on ground. 17. toe board shall be fixed at the platform to restrict fall of materials/person. 18. permit to work at height is mandatory for working on a scaffolding platform. also, the person working on the platform shall have valid height pass and full body harness with them. apart from these points all the general safe working method must be...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43354237 tender for barrication work for slab yard at smp i 27020357 10 10 10 providing, laying & fixing barrication 800 m2 email : hitesh.kanthariya@amns.in contact : name : hitesh kanthariya item details : service provider’s scope of work: • all typical sketch / drawing for fabrication <(>&<)> fixing of gi sheet to be done in coordination with amns site in charge. • providing, laying <(>&<)> fixing of gi sheet as per drawing (thk. 0.7mm × 2000 mm height) on ms channel (ismc 150) and angle (isa 75) with help of self tapping screw <(>&<)> washer. • all legs of ms channel will be concreted with m30 rcc in the ground below 500mm depth. • required excavation work, rcc <(>&<)> backfilling work in vendor scope of supply. • application of red oxide / japan black primer <(>&<)> paint on ms channel <(>&<)> angle. paint <(>&<)> primer will be vendor scope of supply. • all required sheeting material, rolled sections (angle, channel <(>&<)> plates etc.), fasteners <(>&<)> other required materials are in contractor scope of supply. • all required consumables, tools <(>&<)> tackles are in vendor scope of supply. • qap / itp approved by amns to be followed for stage wise inspection and format of record. • supply of all consumables viz. electrodes, gas, etc., tools <(>&<)> tackles, equipment and skilled/unskilled labours, expert riggers / grinders / gas cutters <(>&<)> competent mill right filters etc. • all required capacity new generation farana, trailer <(>&<)> other required equipment for erection is in contractor scope of supply throughout the project tenure. the am/ns top management commitment to the contractor’s safety is very important. top management needs to ensure the following: 1. to implement safe methods and practices, deploy appropriate machinery, tools <(>&<)> tackles, experienced supervision, and skilled workforce, etc. required for the execution. 2. to ensure that employees and workers deployed are physically and mentally fit. they should possess requisite skills, qualifications, experience, etc. 3. to deploy qualified and trained safety supervisors, safety officers, and safety managers. amns safety department approval is required before the deployment of safety personnel. 4. to ensure that the employees and workers have appropriate health and safety training. the certification of such training should be produced for verification, on demand. 5. to obtain all necessary and applicable licenses, permits, and insurance policies of his employees and workers before executing any work. 6. to ensure that all incidents (minor/major injuries, fatality, fire, property damage, etc.) including near misses shall be reported to the amns team immediately verbally as well as in written format provided by amns. 7. to provide personal protective equipment required for the safety and page 2 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112225 date 10.05.2024 submission date 17.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. shubham shirgire contact email shubham.shirgire@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details first aid kits at the worksite. 8. contractor shall not employ any labor below 18 years of age. 9. to follow and implement all the safety rules and regulations of the local bodies, state, and national. the contractor shall also comply with all the statutory requirements and notifications, as applicable, about the employment of his employees issued from time to time by the concerned authorities. 10. contractor may ask for clarifications required in safety related issues, whenever a need arises scope of work amns: • amns will give single point electrical supply. item note : service provider’s scope of work: • all typical sketch / drawing for fabrication <(>&<)> fixing of gi sheet to be done in coordination with amns site in charge. • providing, laying <(>&<)> fixing of gi sheet as per drawing (thk. 0.7mm × 2000 mm height) on ms channel (ismc 150) and angle (isa 75) with help of self tapping screw <(>&<)> washer. • all legs of ms channel will be concreted with m30 rcc in the ground below 500mm depth. • required excavation work, rcc <(>&<)> backfilling work in vendor scope of supply. • application of red oxide / japan black primer <(>&<)> paint on ms channel <(>&<)> angle. paint <(>&<)> primer will be vendor scope of supply. • all required sheeting material, rolled sections (angle, channel <(>&<)> plates etc.), fasteners <(>&<)> other required materials are in contractor scope of supply. • all required consumables, tools <(>&<)> tackles are in vendor scope of supply. • qap / itp approved by amns to be followed for stage wise inspection and format of record. • supply of all consumables viz. electrodes, gas, etc., tools <(>&<)> tackles, equipment and skilled/unskilled labours, expert riggers / grinders / gas cutters <(>&<)> competent mill right filters etc. • all required capacity new generation farana, trailer <(>&<)> other required equipment for erection is in contractor scope of supply throughout the project tenure. the am/ns top management commitment to the contractor’s safety is very important. top management needs to ensure the following: 1. to implement safe methods and practices, deploy appropriate machinery, tools <(>&<)> tackles, experienced supervision, and skilled workforce, etc. required for the execution. 2. to ensure that employees and workers deployed are physically and mentally fit. they should possess requisite skills, qualifications, experience, etc. 3. to deploy qualified and trained safety supervisors, safety officers, and safety managers. amns safety department approval is required before the deployment of safety personnel. 4. to ensure that the employees and workers have appropriate health and safety training. the certification of such training should be produced for verification, on demand. 5. to obtain all necessary and applicable licenses, permits, and insurance policies of his employees and workers before executing any work. 6. to ensure that all incidents (minor/major injuries, fatality, fire, property damage, etc.) including near misses shall be reported to the page 3 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112225 date 10.05.2024 submission date 17.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. shubham shirgire contact email shubham.shirgire@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details amns team immediately verbally as well as in written format provided by amns. 7. to provide personal protective equipment required for the safety and first aid kits at the worksite. 8. contractor shall not employ any labor below 18 years of age. 9. to follow and implement all the safety rules and regulations of the local bodies, state, and national. the contractor shall also comply with all the statutory requirements and notifications, as applicable, about the employment of his employees issued from time to time by the concerned authorities. 10. contractor may ask for clarifications required in safety related issues, whenever a need arises scope of work amns: • amns will give single point electrical supply. ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43310012 tender for spr 27020254 housekeeping services(pltcm & roll shop)crm#2 27020254 10 10 10 regular manpower support 9,880 tag email : anil.bhujade@amns.in contact : name : anil bhujade item details : manpower required for house keeping vendor scope of work: cleaning of cgl4 shopfloor, ecrs, pulpits, utility ecrs. • roll shop area • ecrs • shopfloor • equipment • debris removal • light weight material shifting • sedentary work • miscellaneous job • eot cranes (work at height cert. required) a. qualification as per amns msa policy. b. medically and phisically fit person. c. age limit – less than 50 years supply of cleaning equipment • manual sweepers. • air blower machine. supply of cleaning equipment • long handle floor cleaning brushes. • cleaning solutions (detergent, washing powder etc) • cleaning articles. (cotton cloth, mops etc) • all required ppes personnel protective equipment (ppe): 1. contractor must ensure following listed ppe for their workmen working under this contract as per the amns ppes standard guideline of first party which are mandatory to execute the service: 1. safety helmet (frp) – isi make 2. high ankle safety shoes – safety approved 3. jeans jacket / fluorescent jacket 4. safety goggle – isi make good quality. 5. dust mask 6. ear plug 7. hand gloves as required 8. full body safety harness 9. safety belt – for height work note: as per ppes matrix shall issue the ppes to each workman d. apart for the above norms the following safety precaution are to be observed by the vender 1. the contractor should deploy all his workmen after having proper safety induction training of 5 days for operational contracts and 3 days for project contracts to be provided by am/ns india safety dept. and the new contract workmen should be deployed at site only after the necessary safety induction training and getting the training card. 2. contractor should deploy workmen having age 18 years or above. contractors should provide equipment as per details given below: a) personal protective mandatory ppes: safety shoes, safety helmet, fluorescent jacket, safety goggles as per the am/ns india ppe guideline. as per am/ns india safety standards. page 2 of 2 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000111851 date 04.05.2024 submission date 11.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null ragini mishra contact email ragini.mishra@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details b) other ppes according to job <(>&<)> location in plant requirement 3. the contractor should appoint work supervisors at each location while performing the job at company premises. item note :...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43128448 tender for dust suppresion system for mh 7019804 10 10 10 pipe fabrication & erection 1,890 inm 20 pipe fabrication & erection 1,512 inm 30 pipe fabrication & erection 1,900 inm 40 fab & erection of pipe support 630 to 50 prov & fixing metallic nozzle & grouting 45 no 60 installation of spray nozzles 50 no 70 installation of spray nozzles 50 no 80 fixing of valve 55 ind 90 fab & erection of pipe support 190 to 100 installation of valves 4 ind 110 mounting sensors / erection/fabrication 2 lo 120 providing and replacement of flange 1,232 no 130 pvc pipe fitting work 2 lo 140 fab & erection of pipe support 1.5 to 150 erection & installation of pumps 2 to 160 erection & installation of pumps 2 to email : vishvendu.dave@amns.in contact : name : vishvendu dave item details : • scope of work vendor: dust suppression system at oxide yard to control dust emission in atmosphere. • unloading of equipment: • unloading of equipment’s with appropriate identification marks at project site. • all tools <(>&<)>tackles are in contractor scope of work throughout project tenure. 1.shifting of pipes, fittings, valves, and all other material: • dismantling of old lines, shifting <(>&<)> unloading of the same and new lines and all related material to designated place as shown by amns engineer. • all tools <(>&<)> tackles and consumables are considered in contractor scope of supply. • crane, hydra trailer are in amns scope throughout project duration. 2.fabrication of structures: • shifting of material, angel, channels from store to fabrication yard, unloading <(>&<)> fabrication. • all consumables are considered in the contractor’s scope of supply. 3.erection, installation <(>&<)> alignment of water pump: • shifting of fabricated structures from fabrication site to project site, unloading, erection <(>&<)>alignment as per requirement. • all erection related tools <(>&<)> tackles are in the contractor scope of work. • after erection of water pump and related equipment trial must be taken and any abnormalities and vibration must be attended by the contractor. • all consumables are considered in the contractor’s scope of supply. 4. welding, grinding, pipe supports and erection and fabrication of line: • all welding joints must be leaking proof. • after erection of entire line water leakage must be checked by contractor and leakage must be attended. • all pipe support should be taken from rigid structure to bare entire line weight and all welding joints must be fully welded according to structures. • all consumables are considered in the contractor’s scope of supply. • special instruction for vendor: • re welding of weld joints to be done if required after inspection. • • job quantity will be decided by the department/site in charge. • • contractor shall complete the job as per the approved specifications, drawings, and as per the direction <(>&<)> satisfaction of amns engineer in charge. • • contractor shall ensure for housekeeping/cleaning of the area including cleaning /removing the debris/scrap/waste and used material and shifting the same/surplus materials to the location specified or shown by the engineer, area in charge. bill certification will be only done after complete housekeeping. • contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all page 2 of 2 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109815 date 06.04.2024 submission date 13.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. aman burnwal contact email aman.burnwal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details required ppe’s (personal protective equipment) • contractor shall ensure that all the tools and tackles deployed are certified by competent authority for use in factory. certificate should be duly valid at all points of time. • hse requirement contractor shall comply with the health, safety and environment policy as laid down by amns steel limited. • penalty will be applicable for violating safety norms as per amns policy. • penalty will be applicable for not completing the job as per the agreed timeline with site in charge. note the quantities shown in drawing is for estimation. however, it may increase or decrease depending on the actual requirements • scope of work amns • all jobs are to be carried out as per given instruction by amns engineer. • providing structural and technological materials valves, fog canon, flow meter, pressure gauges, pump, water tank etc. • crane, hydra <(>&<)>trailer are in amns scope throughout project ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43085061 tender for equipment interconnecting piping work in cgal 27016816 30 10 90 fld radiography test as per scope of wrk 5,000 in 10 fabrication of carbon steel pipes 17,000 ind 20 erec carbon steel pipes, valves, & fitng 18,000 inm 50 fab & ere of ss tubing 5,000 m 80 p & f of mechanical hilti bolts 500 no 60 fab, blasting & pntg, & erec of s struc 10 to 40 erec. stnless steel pipes,valves,&fiting 11,000 inm 30 fabrication of stainless steel pipe 9,000 ind 70 chemical cleaning of cs pipeline 5,000 inm 100 miscellaneous 1 lo email : gopal.thummar@amns.in contact : name : gopal thummar item details : scope of work doc no amns/crm2/cgal/006 scope of work for fabrication, laying, <(>&<)> fixing of terminal piping for continuous galvanizing <(>&<)> annealing line (cgal) brief summary <(>&<)> scope – am/ns, hazira is in process of installation of 1 mtpa cgal and for this we need a contractor who is specialized in continuous galvanizing line <(>&<)> annealing line for pipeline fabrication, laying and fixing of ss and cs pipelines of ng, steam, air, hydrogen, nitrogen, hnx, water etc. as per below table. sr no. description / activity uom qty 1 fabrication of carbon steel pipes ind 14000 2 erection of carbon steel pipes, valves, and fittings inm 12000 3 fabrication of stainless steel pipe ind 8100 4 erection of stainless steel pipes, valves, and fittings inm 11000 5 fabrication <(>&<)> erection of instrument tubing inm 2000 6 fabrication, blasting <(>&<)> painting, and erection of support structure mt 10 7 chemical cleaning of cs pipeline inm 5000 8 providing and fixing of mechanical hilti bolts size (12 16) mm no 500 location of site: hazira, surat, gujarat scope of the contractor a) pipeline fabrication and blasting <(>&<)> painting 1. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 2. fabrication of pipe line and supports as per drawing <(>&<)> welding method will be as per specified by am/ns. 3. welders deployed by contractor must have valid welder qualification certificate as per wps <(>&<)> pqr (gtaw <(>&<)> smaw process) and to be submitted to am/ns before commencement of work. welder performance qualification test shall be performed after receiving request for inspection from the contractor. 4. the connections shall be made either by an but weld, in some special case the socket weld is allowed only in special cases, before to perform this type of welding , the erection contractor has to inform the site representative and obtain the agreement. 5. all the piping and accessories shall be but welded by tig process for root joint. the filling stages can be made with the electrode. the filler metal shall be perfectly compatible to the bare metal (analysis to be specified to us). 6. the root of weld shall be protected by the injection of inert gas in the tube during the weld stage. supply of inert gas cylinders will be in vendors scope. 7. tubes shall be prepared as per din 2559. for the preparation and performing of the work a receiving of all the welds by radiography shall be taken into account. in case of poor welds the repair and re control costs shall be charged to the contractor. 8. fabrication of spools as per drawing and minimise welding joints during erection. spools end must be protected with caps after fa page 2 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details brication. 9. in order to reduce as much as possible, the welding, the pipes of size below 1.5 inch shall be cold bent by the hydraulic bending machine. the jaws of the bending machine shall perfectly fit the diameter of the tube. when it is not possible to bend the curves cold, weld accessories should be allowed. 10. testing of joints as per ts and qap. 11. blasting and painting of pipes and supports as per ts. supply of paint material <(>&<)> painting equipment will be in contractor scope as per am/ns approved make list. 12. all the required manpower, tools and tackles for completion of work in totality. 13. preparation of beds for fabrication and painting work. 14. painting specification of pipelines is given in below table and detail specification is attached. 15. unloading, shifting, unpacking, and stacking of pipes <(>&<)> fitting at the designated place (storage yard). 16. opi will be as per amns specifications and required manpower, equipment will be supplied by contractor b) scope of work for pipeline erection 1. erection of pipelines, fittings, valves, gaskets, and accessories as per drawing and p<(>&<)>id. 2. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 3. maintaining drawing wise location of pipes <(>&<)> tracking, shifting to site for erection as per requirement 4. pre fabrication and fixing of pipe support at location in accordance with the required level. regular distance as specified by oem between supports to follow. 5. providing and fixing of chemical or mechanical hilti bolts for supports as per requirement. 6. welding of pipe joints, fittings must be done according to technical specification (ts) only. 7. threading of pipes for fitment of threaded fittings and valves wherever required will be in vendors scope. 8. all the piping shall arrange in non superposed levels, with a spacing between them and with a sufficient gap towards the bulkhead, so as to dismantle them with usual tools and particularly when the tube joining shall be made with removable fittings. 9. all the piping shall be laid without any erection difficulty. a draining shall be set at each end. an airing shall be foreseen at each high point. 10. simultaneous and sequential erection of pipeline at each level must be done along with scaffolding with all safety requirements of work at height including lifelines, safety nets and proper handrails, staircase and ladders must be provided. 11. laying of pipeline over the supports at position and fit up of joints, field welding as per specification/ ts and fixing of clamps. 12. welding of pipeline <(>&<)> joints to be done with suitable welding electrode in all pipe lines. welding electrode shall be procure as per am/ns approved make list. 13. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, cutting wheels, die penetration kit for welding testing, wire rope slings / web slings of appropriate sizes, spanners all types <(>&<)> sizes of etc. 14. all tools and tackles for lifting /shifting/erection will be in contractor’s scope. 15. all machines and tools for erection like pipe bending machines, arc welding machines, tig/argon welding machines, gas cutting sets, grinding <(>&<)> cutting machines, hydraulic jacks <(>&<)> pumps, flushing unit, pressure testing pumps etc. 16. charging of accumulators to be done as per ts. supply of filled nitrogen gas cylinder, n2 charging kit <(>&<)> all accessories will be page 3 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details in scope of contractor. 17. clamping of pipe lines as per drawing / ts. 18. co ordinate with am/ns for the planning of sequential and quality work execution in accordance with the best engineering practice. 19. preparing <(>&<)> taking handing over protocols with civil/structural dept. 20. preparation of the protocol of the erection <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. 21. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. 22. assisting in cold <(>&<)> hot trail in line commissioning. 23. all inspection <(>&<)> testing tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to am/ns. 24. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type) and certified scaffolding inspector. 25. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. 26. all height work approach to be done only with man lifter. wherever man lifter approach is not possible contractor has to prepare scaffolding platforms for pipeline erection. 27. farhana (hydra not allowed) for loading/ unloading shifting. 28. final paint touch up need to be done as required and paint and painting equipment will be in scope of contractor. 29. working height: 0 to 35 metre (refer to cgal ga) 30. penalty will be levied on vendor if equipment / structure material got damaged during handling or erection of pipe line, same amount will be deducted from bill to contractor. 31. resources deployment plan to be submit as per requirement of project. 32. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. 33. crane <(>&<)> man lifter required for erection will be provided by am/ns. wherever crane approach is not possible contractor has to place and erect pipes with chain pulley blocks. 34. pre filling of oil in hydraulic power pack will be scope of contractor 35. dp test – all socket weld joints must be dp tested by contractor. 36. any crimping job for instrumentation line or grease line will be in vendor scope. 37. no o ring or gaskets should not be damaged during installation of pipe end fitting. 38. all pipe fittings , hoses and accessories unloading and record keeping at storage area will be in contractor scope . 39. crimping tool for crimping of pneumatic piping 40. all flange and clamping bolts tightening with torque wrench 41. any extra tapping points required considering site conditions c) hydro testing 1. hydro testing of all the erected lines has to be performed by vendor/contractor. 2. final pressure testing will be 1.5 times of designed pressure by oem for hydrotest. 3. pump and all accessories for pressure testing will be in contractors scope. 4. looping of the pipeline for testing will be scope of contractor. temporary material required for looping like hoses, valves, pipe fittings, fasteners etc will be in contactor’s scope. 5. system components which may present a restriction to flow or which may be damaged by pressure testing and high flushing flow should be by passed with suitable make up pieces. 6. after hydro testing pipe lines must be flushed and dried by compressed air. 7. itp (inspection and test plan) shall be submitted for approval before pressure testing begins. page 4 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details d) flushing 1. all the pipelines must be flushed with compressed air till quality is achieved. 2. compressed air will be provided by amns at single point. 3. temporary fittings to perform flushing will be in contractors scope. 4. system components which may present a restriction to flow or which may be damaged high flushing flow should be by passed with suitable make up pieces. 5. flushing quality has to be checked with white paper to achieve zero dust. 6. carboard blasting has to performed by contractor wherever required. e) rt testing 1. pipe lines after fabrication and erection must be rt tested by contractor against each welder as per media requirement given in below table s no media rt percentage 1 water lines no rt 2 pneumatic lines no rt 3 hydraulic 10% 4 steam <(>&<)> over heated water 10% 5 nitrogen n2 10% 6 hydrogen h2 100% 7 ng gas 100% 8 h2 n2 mix gas 100% 2. all compliance related to safety has to be complied with 100% without fail. 3. vendor shall deploy radiography camera with sufficient curie strength. 4. your rso/site in charge shall collect the details of welding joints offered for radiography in the evening from amns quality in charge. 5. vendor shall submit the previous day/night generated film/ report to amns by the next day. 6. helper’s will be in vendor’s scope. 7. lighting, scaffolding <(>&<)> platform to facilitate work. 8. d7 grade film will be used but slow processing film like d4 or d5 may be asked if situation demands. 9. if any rt film is given retake by amns quality due to any issue then that segment will not be considered. 10. against failure of joint vendor will have to perform rt for 3 more joints as penalty against failed joint. f) chemical cleaning of cs hyd <(>&<)> lubrication piping : process a. degreasing: degreasing prior to pickling the pipes have to be degreased after installation if they have been ordered greased or phosphate treated. this consists in circulating during 2 hours the following solution in each pipe: aqueous degreasing solution: 8 % sodium hydroxide 0.8 % bi sodium phosphate 1.15% wetting agent b. pickling : prior to neutralisation and flushing pipes have to be pickled after installation. this consists in having during 6 hours and circulating during 2 hours the following solution (total 8 hours) in each pipe aqueous pickling solution: 8 % sulphuric acid 0.3 % inhibitor 0.5 % ammonium bi fluoride 0.1 % rust remover 0.05 rust prevention c. neutralisation : prior to flushing pipes have to be neutralised after pickling. this consists in circulating during 2 hours the following solution in each page 5 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details pipe. afterward a complete liquid removal shall be performed from the piping. the neutralising solution consists in 0.5 % sodium nitrite, 0.02 rust prevention d. drying with nitrogen: after neutralisation and prior to flushing the piping has to be dried with nitrogen. this consists in blowing nitrogen under pressure in each pipe until it is dry. immediately after the pipes drying, hydraulic oil has to be filled in the circuit. scope – 1. all the material, consumables, chemicals, pumps, tools for chemical cleaning as per above process will be in vendor scope. 2. preparation of temporary spools and loops for total process. 3. temporary hoses and fittings for looping and recirculation. 4. removal and refixing of valves, fittings which may get damaged during cleaning process. 5. proper storage and handling of chemicals as per safety protocols. 6. neutralisation of all the chemicals after process completion and proper discharge. 7. required safety ppe for handling of chemicals. g) inspection and testing amns scope 1. qap/itp approval. 2. technical specification 3. job procedures approval 4. proposed wps and final wps approval 5. fabrication and erection methodology approval 6. pqr <(>&<)> welder qualification etc. approval for lab testing process. 7. rm <(>&<)> consumable lab testing approval. vendor’s scope 1. competent person to be engaged who should be having well knowledge in inspection of fabrication and erection of piping, welding, welder qualification, incoming material inspection etc. having well versed in asme b31.3, secix, secii, secv etc as per approved itp and piping ts. 2. initial approval of engaged manpower from amns concern person is required by sharing resume and subsequent interview. inspection during fabrication 1. conducting wps/pqr, welder performance qualification test after receiving request for inspection from the contractor. 2. inspection of all incoming material and signing the reports after clearing. 3. marking dimensions checking, cutting etc. 4. piping fitup/alignment, orientation, flange alignment etc. inspection to be done as per drawing and approved wps. 5. all stagewise inspection to be carried out as per approved itp. 6. witnessing root dpt and giving clearance for further subsequent pass. 7. knowledge of film interpretation is required. 8. weld visual <(>&<)> rf pad testing (if required) inspection to be done after receiving rfi from the contractor. inspection during erection 1. inspection erection and alignment of spools valves etc. for in situ joints of above ground location <(>&<)> disposition of terminal joints, elevation, slope, identification of the components <(>&<)> support erection. 2. checking blasting, painting, climate monitoring etc. as per ts and standard. inspection during mechanical <(>&<)> post testing completion 1. checking test pack/loop files for mechanical clearance wrt isometric drawings, p<(>&<)>id etc. and providing punch points and same to be closed post compliance. 2. lhs checking wrt ndt and quality point of view, providing punch points if any and same to be closed post compliance. 3. witnessing hydro/pneumatic testing. 4. witnessing carboard blasting, air blowing etc. and box up inspection. ensuring all components to be reinstate as per the p<(>&<)>id requirement. page 6 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 5. checking all final documents and report signing as per approved itp. h) measurement criteria 1. welded joints of pipe fitting will be calculated in inch diameter. 2. pipe laying will be calculated in inch meter. no separate billing will be claimed for cold bends, will be also a part of pipe laying in inch meter. 3. one flange joint in the pipeline will be considered as per the size in inch diameter. 4. installation charges of valves, bellows, strainers in pipe fitting will be considered as 1 meter straight pipe length. 5. fabrication of pipeline mentioned in inch diameter as uom will be measured on basis of dn. 6. fabrication of special fittings such as reducers, tee branches of pipe fitting will be calculated as per welding in running inch diameter. 7. pipe and tube size less than 1 inch will be calculated as per actual running weld in inch diameter <(>&<)> actual length in inch meter. tubing will be part of piping scope. 8. any hydraulic fittings which will be fitted on pipe, will not be claimed in billing. 9. no separate bill will be claimed for pipe clamping, pressure testing <(>&<)> flushing of pipeline, it will be covered in pipe erection. i) project tentative time schedule – unit erection start time duration (max) cgal feb 24 8 months j) general points 1. contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. 2. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they must execute the job in coordination with oem <(>&<)> am/ns team. 3. a qualified <(>&<)> competent safety manager to be deployed with complete safety org chart. 4. a qualified <(>&<)> competent qa/qc engineer to be deployed to meet qa/qc standard of amns 5. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 6. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. no space is available on site for accommodation. 7. contractor must follow the safety rules of am/ns. 8. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. 9. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. 10. proper housekeeping of the erection area in contractor scope. 11. contractor shall provide all the personal protective items like helmet, safety shoes, safety jacket to all the team members according to the requirement and ensure 100% use of the same. 12. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 13. am/ns will provide the required drawings/ documents required for erection. page 7 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 14. shifting of scrap to the designated scrap yard. 15. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. 16. any revise drawing job and modification in line as per site condition should be in contractor scope. 17. safety kit/first aid box, flashback arrestor, dial guage, conduit piping, flexible wires, electrical db with proper rating elcb/rccb will be contractor scope. 18. manpower support for acid disposal tank and housekeeping activity after execution of job at work will be in contractor scope. k) information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. equipment deployment plan. 5. list of tools <(>&<)> tackles 6. list of material handling equipment like farhana, forklift, trailers etc. 7. reference list for similar kind of jobs in cold rolling complex. e. start up commissioning <(>&<)> final acceptance (general) scope the contractor shall provide necessary equipment, tools, tackles, instruments, labor, supervision etc. for the following: a) prepare piping for trial and start up. b) start up and commissioning piping c) final acceptance. preparation of piping for trial and start up: the contractor shall provide adequate personnel as approved by the site in charge to assist the equipment supplier and operating personnel of amnsi in starting up and commissioning of piping as well as for adjustments, repairs, and rectifications of defects in erection of the piping during commissioning of the equipment. the contractor shall adjust piping as required by the equipment supplier with the approval of the site in charge (amnsi). the contractor shall be required to clean up the piping and prepare it for trial runs and operation in accordance with the equipment supplier’s instructions. the contractor shall bring to site such equipment, tools, instruments, labor etc. as it is deemed necessary to cater for the work, which shall include but not limited to the following. 1. clean up dirt, remove any protective coating applied by the manufacturer, clean ventilating openings and remove all visible foreign bodies from the equipment erected. 2. all flanges, inlet and outlet connections etc. shall be checked for tightness. 3. blow down all piping systems, install and remove strainers in piping and equipment as required. 4. any modification related to hydraulic power pack piping <(>&<)> hydraulic piping supplied by oem need to be done by contractor 5. any piping cleaning need to be done by pre fitted provided by oem( removing, cleaning <(>&<)> fitting of all pipes <(>&<)> joint) 6. replacement of oil fitter during trail will be in scope of contractor if at any time during trials and commissioning, till the piping is finally accepted, any part or parts either structural or belonging to the required to be opened for inspection and checking by the equipment supplier/site in charge (amnsi), this shall be done by the contractor and the parts should be properly refitted and satisfactorily tried after refitting. if it is established that the defects are due to bad workmanship during installation and/or materials, which are within the scope of the contractor’s supply, the charges for all rectification work inclusive of labour, materials and supervision used will be borne by the contractor. until the piping are finally accepted by m/s amnsi and taken over after page 8 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details the successful commissioning, the contractor shall be responsible for any loss/ damage theft etc. for the piping erected by him. l) primary hse requirementinitial documents required to start work: 1. hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3. hira (hazard identification and risk assessment) of activities. 4. tool and tackles third party inspection certificates. 5. dedicated safety manager should be depute at site with organogram of company. 6. communication contact details with mobile no. /email id. 7. list of vehicle/equipment/machines with tpi and other relevant legal documents. 8. list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter (note the scaffolding team will be screened by our team to verify their competency level.) some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss and conduct mock drill every month. 4. take work permit as per amns ptw system and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. mobile phones are not allowed while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type and always tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farhana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farhana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team page 9 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standard tool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02 ,dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blankets/tarpaulin with mtc. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. page 10 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 4. he should be medically fit (the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report ) and should possess a valid medical fitness certificate for work at height jobs from care hospital at arcelormittal nippon steel india, hazira complex(cnh) before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns, as per annexure attached below. details documents will be shared with contractor during detailed technical discussion. sr. no sop document reference no. 1 safety signage <(>&<)> display of safety information amns/project/ts/hsem/18 2 night work safety amns/project/ts/hsem/05 3 lone work safety amns/project/ts/hsem/06 4 working near oh lines amns/project/ts/hsem/08 5 waste management amns/project/ts/hsem/11 6 unloading of container amns/project/ts/hsem/12 7 ppes management amns/project/ts/hsem/13 8 plant <(>&<)> machinery operation amns/project/ts/hsem/08 9 handling <(>&<)> storage of compressed gas cylinder amns/project/ts/hsem/06 10 working in confined space amns/project/ts/hsem/14 11 hot work amns/project/ts/hsem/10 12 hydro test amns/project/ts/hsem/06 13 work at height amns/project/ts/hsem/04 14 blasting <(>&<)> painting safety amns/project/ts/hsem/19 15 simultaneous operation amns/project/ts/hsem/17 16 management of hazardous substances amns/project/ts/hsem/15 17 structural steel fabrication <(>&<)> erection amns/project/ts/hsem/11 18 manual material handling amns/project/ts/hsem/05 19 hand tools <(>&<)> portable power tool safety amns/project/ts/hsem/07 20 age of equipment guidelines amns/safe/71 21 loto amns/project/ts/hsem/20 m) amns scope 1. drawings, qap approved document, delivery schedule will be provided by amns 2. providing essentials like power and water at work site on single point only. 3. lifting and handling equipment’s / eot/ man lifter will be in amns scope. 4. supply of hydraulic oil <(>&<)> flushing oil. 5. raw pipe , elbow, union, tee, reducer, coupling, adaptor, valves, cap, flange, hoses, angles channels etc. 6. raw material for pipe supports. 7. supply of n2 and ca compressed air. 8. electricity will be provided at single point near entry <(>&<)> exit area of shed. n) tentative required manpower <(>&<)> resources plan: (note : manpower <(>&<)> resources plan is purely indicative and will have to be increased as per front availability and project schedule requirement) required manpower page 11 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details category number project manager 1 safety manager 1 safety supervisors 2 admin 1 qa/qc engineer 1 scaffold inspector 1 site engineers 2 surveyor 1 storekeeper 1 supervisors 4 foreman 3 structure fitter 2 pipe fitter 6 welders 7 gas cutter 3 grinder/ cutter 6 riggers 15 scaffolders 12 helpers 20 electrician 1 housekeeping manpower 5 blaster <(>&<)> painter 3 farhana, trailer 2 total 100 required resources, tools <(>&<)> tackles category number farhana (15 ton) 1 gas cutter set with trolley 4 arc welding machines (600 amp) 4 tig welding machines 4 single phase welding machine 3 grinding/ cutting machines 10 toolboxes with spanner set 3 box spanner set 3 torque wrenches 2 chain blocks (1 ton, 2 ton <(>&<)> 5 ton) 2 each ff2 grinder 4 portable drilling machine 2 hilti bolt drilling machine 1 pipe bending machine 4 motorised pump for oil filling 1 extension board for electrical connection 5 manual pump for oil 2 web sling (2 ton, 5 ton, 10 ton) 5 pair each d shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each bow shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each welding cable (600 amp) of 100 m <(>&<)> earthing cable 100 m of length for each welding machine 1 lot electrical power panels, industrial extension boards with 100 m cables, db’s, jb’s, single core/ 3 core armoured cables etc as per requirement. 1 lot hydro testing pump with accessories 1 air compressor for pressure testing and flushing 1 pipe cleaning setup with accessories and chemicals 1 set blasting and painting machine with accessories 1 set temporary hoses, valves, and fittings 1 lot page 12 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details item note : 2 27016816 40 20 30 fabrication of stainless steel pipe 24,000 ind 20 erec carbon steel pipes, valves, & fitng 30,000 inm 40 erec. stnless steel pipes,valves,&fiting 8,000 inm 70 p & f of mechanical hilti bolts 500 no 50 fab & ere of ss tubing 10,000 m 60 fab, blasting & pntg, & erec of s struc 10 to 10 fabrication of carbon steel pipes 60,000 ind 80 fld radiography test as per scope of wrk 100,000 in 90 miscellaneous 1 lo email : gopal.thummar@amns.in contact : name : gopal thummar item details : scope of work doc no amns/crm2/cgal/007 scope of work for fabrication, laying, <(>&<)> fixing of furnace piping for continuous galvanizing <(>&<)> annealing line (cgal) brief summary <(>&<)> scope – am/ns, hazira is in process of installation of 1 mtpa cgal and for this we need a contractor who is specialized in continuous galvanizing line <(>&<)> annealing line for pipeline fabrication, laying and fixing of ss and cs pipelines of ng, steam, air, hydrogen, nitrogen, hnx, water etc. as per below table. sr no. description / activity uom qty 1 fabrication of carbon steel pipes ind 59000 2 erection of carbon steel pipes, valves, and fittings inm 30000 3 fabrication of stainless steel pipe ind 24000 4 erection of stainless steel pipes, valves, and fittings inm 7200 5 fabrication <(>&<)> erection of instrument tubing inm 2000 6 fabrication, blasting <(>&<)> painting, and erection of support structure mt 10 7 providing and fixing of mechanical hilti bolts size (12 16) mm no 500 location of site: hazira, surat, gujarat scope of the contractor a) pipeline fabrication and blasting <(>&<)> painting 1. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 2. fabrication of pipe line and supports as per drawing <(>&<)> welding method will be as per specified by am/ns. 3. welders deployed by contractor must have valid welder qualification certificate as per wps <(>&<)> pqr (gtaw <(>&<)> smaw process) and to be submitted to am/ns before commencement of work. welder performance qualification test shall be performed after receiving request for inspection from the contractor. 4. the connections shall be made either by an but weld, in some special case the socket weld is allowed only in special cases, before to perform this type of welding , the erection contractor has to inform the site representative and obtain the agreement. 5. all the piping and accessories shall be but welded by tig process for root joint. the filling stages can be made with the electrode. the filler metal shall be perfectly compatible to the bare metal (analysis to be specified to us). 6. the root of weld shall be protected by the injection of inert gas in the tube during the weld stage. supply of inert gas cylinders will be in vendors scope. 7. tubes shall be prepared as per din 2559. for the preparation and performing of the work a receiving of all the welds by radiography shall be taken into account. in case of poor welds the repair and re control costs shall be charged to the contractor. 8. fabrication of spools as per drawing and minimise welding joints during erection. spools end must be protected with caps after fa brication. 9. in order to reduce as much as possible, the welding, the pipes of size below 1.5 inch shall be cold bent by the hydraulic bending machine. the jaws of the bending machine shall perfectly fit the diameter of the tube. when it is not possible to bend the curves cold, weld accessories should be allowed. 10. testing of joints as per ts and qap. 11. blasting and painting of pipes and supports as per ts. supply of paint material <(>&<)> painting equipment will be in contractor scope as per am/ns approved make list. 12. all the required manpower, tools and tackles for completion of work page 13 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details in totality. 13. preparation of beds for fabrication and painting work. 14. painting specification of pipelines is given in below table and detail specification is attached. 15. unloading, shifting, unpacking, and stacking of pipes <(>&<)> fitting at the designated place (storage yard). 16. opi will be as per amns specifications and required manpower, equipment will be supplied by contractor b) scope of work for pipeline erection 1. erection of pipelines, fittings, valves, gaskets, and accessories as per drawing and p<(>&<)>id. 2. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 3. maintaining drawing wise location of pipes <(>&<)> tracking, shifting to site for erection as per requirement 4. pre fabrication and fixing of pipe support at location in accordance with the required level. regular distance as specified by oem between supports to follow. 5. providing and fixing of chemical or mechanical hilti bolts for supports as per requirement. 6. welding of pipe joints, fittings must be done according to technical specification (ts) only. 7. threading of pipes for fitment of threaded fittings and valves wherever required will be in vendors scope. 8. all the piping shall arrange in non superposed levels, with a spacing between them and with a sufficient gap towards the bulkhead, so as to dismantle them with usual tools and particularly when the tube joining shall be made with removable fittings. 9. all the piping shall be laid without any erection difficulty. a draining shall be set at each end. an airing shall be foreseen at each high point. 10. simultaneous and sequential erection of pipeline at each level must be done along with scaffolding with all safety requirements of work at height including lifelines, safety nets and proper handrails, staircase and ladders must be provided. 11. laying of pipeline over the supports at position and fit up of joints, field welding as per specification/ ts and fixing of clamps. 12. welding of pipeline <(>&<)> joints to be done with suitable welding electrode in all pipe lines. welding electrode shall be procure as per am/ns approved make list. 13. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, cutting wheels, die penetration kit for welding testing, wire rope slings / web slings of appropriate sizes, spanners all types <(>&<)> sizes of etc. 14. all tools and tackles for lifting /shifting/erection will be in contractor’s scope. 15. all machines and tools for erection like pipe bending machines, arc welding machines, tig/argon welding machines, gas cutting sets, grinding <(>&<)> cutting machines, hydraulic jacks <(>&<)> pumps, flushing unit, pressure testing pumps etc. 16. charging of accumulators to be done as per ts. supply of filled nitrogen gas cylinder, n2 charging kit <(>&<)> all accessories will be in scope of contractor. 17. clamping of pipe lines as per drawing / ts. 18. co ordinate with am/ns for the planning of sequential and quality work execution in accordance with the best engineering practice. 19. preparing <(>&<)> taking handing over protocols with civil/structural dept. 20. preparation of the protocol of the erection <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. 21. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. page 14 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 22. assisting in cold <(>&<)> hot trail in line commissioning. 23. all inspection <(>&<)> testing tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to am/ns. 24. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type) and certified scaffolding inspector. 25. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. 26. all height work approach to be done only with man lifter. wherever man lifter approach is not possible contractor has to prepare scaffolding platforms for pipeline erection. 27. farhana (hydra not allowed) for loading/ unloading shifting. 28. final paint touch up need to be done as required and paint and painting equipment will be in scope of contractor. 29. working height: 0 to 35 metre (refer to cgal ga) 30. penalty will be levied on vendor if equipment / structure material got damaged during handling or erection of pipe line, same amount will be deducted from bill to contractor. 31. resources deployment plan to be submit as per requirement of project. 32. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. 33. crane <(>&<)> man lifter required for erection will be provided by am/ns. wherever crane approach is not possible contractor has to place and erect pipes with chain pulley blocks. 34. pre filling of oil in hydraulic power pack will be scope of contractor 35. dp test – all socket weld joints must be dp tested by contractor. 36. any crimping job for instrumentation line or grease line will be in vendor scope. 37. no o ring or gaskets should not be damaged during installation of pipe end fitting. 38. all pipe fittings , hoses and accessories unloading and record keeping at storage area will be in contractor scope . 39. crimping tool for crimping of pneumatic piping 40. all flange and clamping bolts tightening with torque wrench 41. any extra tapping points required considering site conditions c) hydro testing 1. hydro testing of all the erected lines has to be performed by vendor/contractor. 2. final pressure testing will be 1.5 times of designed pressure by oem for hydrotest. 3. pump and all accessories for pressure testing will be in contractors scope. 4. looping of the pipeline for testing will be scope of contractor. temporary material required for looping like hoses, valves, pipe fittings, fasteners etc will be in contactor’s scope. 5. system components which may present a restriction to flow or which may be damaged by pressure testing and high flushing flow should be by passed with suitable make up pieces. 6. after hydro testing pipe lines must be flushed and dried by compressed air. 7. itp (inspection and test plan) shall be submitted for approval before pressure testing begins. d) flushing 1. all the pipelines must be flushed with compressed air till quality is achieved. 2. compressed air will be provided by amns at single point. 3. temporary fittings to perform flushing will be in contractors scope. 4. system components which may present a restriction to flow or which may be damaged high flushing flow should be by passed with suitable make up pieces. 5. flushing quality has to be checked with white paper to achieve zero dust. page 15 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 6. carboard blasting has to performed by contractor wherever required. e) rt testing 1. pipe lines after fabrication and erection must be rt tested by contractor against each welder as per media requirement given in below table s no media rt percentage 1 water lines no rt 2 pneumatic lines no rt 3 hydraulic 10% 4 steam <(>&<)> over heated water 10% 5 nitrogen n2 10% 6 hydrogen h2 100% 7 ng gas 100% 8 h2 n2 mix gas 100% 2. all compliance related to safety has to be complied with 100% without fail. 3. vendor shall deploy radiography camera with sufficient curie strength. 4. your rso/site in charge shall collect the details of welding joints offered for radiography in the evening from amns quality in charge. 5. vendor shall submit the previous day/night generated film/ report to amns by the next day. 6. helper’s will be in vendor’s scope. 7. lighting, scaffolding <(>&<)> platform to facilitate work. 8. d7 grade film will be used but slow processing film like d4 or d5 may be asked if situation demands. 9. if any rt film is given retake by amns quality due to any issue then that segment will not be considered. 10. against failure of joint vendor will have to perform rt for 3 more joints as penalty against failed joint. f) inspection and testing amns scope 1. qap/itp approval. 2. technical specification 3. job procedures approval 4. proposed wps and final wps approval 5. fabrication and erection methodology approval 6. pqr <(>&<)> welder qualification etc. approval for lab testing process. 7. rm <(>&<)> consumable lab testing approval. vendor’s scope 1. competent person to be engaged who should be having well knowledge in inspection of fabrication and erection of piping, welding, welder qualification, incoming material inspection etc. having well versed in asme b31.3, secix, secii, secv etc as per approved itp and piping ts. 2. initial approval of engaged manpower from amns concern person is required by sharing resume and subsequent interview. inspection during fabrication 1. conducting wps/pqr, welder performance qualification test after receiving request for inspection from the contractor. 2. inspection of all incoming material and signing the reports after clearing. 3. marking dimensions checking, cutting etc. 4. piping fitup/alignment, orientation, flange alignment etc. inspection to be done as per drawing and approved wps. 5. all stagewise inspection to be carried out as per approved itp. 6. witnessing root dpt and giving clearance for further subsequent pass. 7. knowledge of film interpretation is required. 8. weld visual <(>&<)> rf pad testing (if required) inspection to be done after receiving rfi from the contractor. inspection during erection 1. inspection erection and alignment of spools valves etc. for in situ joints of above ground location <(>&<)> disposition of terminal joints, elevation, slope, identification of the components <(>&<)> page 16 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details support erection. 2. checking blasting, painting, climate monitoring etc. as per ts and standard. inspection during mechanical <(>&<)> post testing completion 1. checking test pack/loop files for mechanical clearance wrt isometric drawings, p<(>&<)>id etc. and providing punch points and same to be closed post compliance. 2. lhs checking wrt ndt and quality point of view, providing punch points if any and same to be closed post compliance. 3. witnessing hydro/pneumatic testing. 4. witnessing carboard blasting, air blowing etc. and box up inspection. ensuring all components to be reinstate as per the p<(>&<)>id requirement. 5. checking all final documents and report signing as per approved itp. g) measurement criteria 1. welded joints of pipe fitting will be calculated in inch diameter. 2. pipe laying will be calculated in inch meter. no separate billing will be claimed for cold bends, will be also a part of pipe laying in inch meter. 3. one flange joint in the pipeline will be considered as per the size in inch diameter. 4. installation charges of valves, bellows, strainers in pipe fitting will be considered as 1 meter straight pipe length. 5. fabrication of pipeline mentioned in inch diameter as uom will be measured on basis of dn. 6. fabrication of special fittings such as reducers, tee branches of pipe fitting will be calculated as per welding in running inch diameter. 7. pipe and tube size less than 1 inch will be calculated as per actual running weld in inch diameter <(>&<)> actual length in inch meter. tubing will be part of piping scope. 8. any hydraulic fittings which will be fitted on pipe, will not be claimed in billing. 9. no separate bill will be claimed for pipe clamping, pressure testing <(>&<)> flushing of pipeline, it will be covered in pipe erection. h) project tentative time schedule – unit erection start time duration (max) cgal feb 24 8 months i) general points 1. contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. 2. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they must execute the job in coordination with oem <(>&<)> am/ns team. 3. a qualified <(>&<)> competent safety manager to be deployed with complete safety org chart. 4. a qualified <(>&<)> competent qa/qc engineer to be deployed to meet qa/qc standard of amns 5. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 6. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. no space is available on site for accommodation. 7. contractor must follow the safety rules of am/ns. page 17 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 8. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. 9. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. 10. proper housekeeping of the erection area in contractor scope. 11. contractor shall provide all the personal protective items like helmet, safety shoes, safety jacket to all the team members according to the requirement and ensure 100% use of the same. 12. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 13. am/ns will provide the required drawings/ documents required for erection. 14. shifting of scrap to the designated scrap yard. 15. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. 16. any revise drawing job and modification in line as per site condition should be in contractor scope. 17. safety kit/first aid box, flashback arrestor, dial guage, conduit piping, flexible wires, electrical db with proper rating elcb/rccb will be contractor scope. 18. manpower support for acid disposal tank and housekeeping activity after execution of job at work will be in contractor scope. j) information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. equipment deployment plan. 5. list of tools <(>&<)> tackles 6. list of material handling equipment like farhana, forklift, trailers etc. 7. reference list for similar kind of jobs in cold rolling complex. e. start up commissioning <(>&<)> final acceptance (general) scope the contractor shall provide necessary equipment, tools, tackles, instruments, labor, supervision etc. for the following: a) prepare piping for trial and start up. b) start up and commissioning piping c) final acceptance. preparation of piping for trial and start up: the contractor shall provide adequate personnel as approved by the site in charge to assist the equipment supplier and operating personnel of amnsi in starting up and commissioning of piping as well as for adjustments, repairs, and rectifications of defects in erection of the piping during commissioning of the equipment. the contractor shall adjust piping as required by the equipment supplier with the approval of the site in charge (amnsi). the contractor shall be required to clean up the piping and prepare it for trial runs and operation in accordance with the equipment supplier’s instructions. the contractor shall bring to site such equipment, tools, instruments, labor etc. as it is deemed necessary to cater for the work, which shall include but not limited to the following. 1. clean up dirt, remove any protective coating applied by the manufacturer, clean ventilating openings and remove all visible foreign bodies from the equipment erected. 2. all flanges, inlet and outlet connections etc. shall be checked for tightness. 3. blow down all piping systems, install and remove strainers in piping and equipment as required. 4. any modification related to hydraulic power pack piping <(>&<)> hydraulic piping supplied by oem need to be done by contractor 5. any piping cleaning need to be done by pre fitted provided by oem( removing, cleaning <(>&<)> fitting of all pipes <(>&<)> joint) 6. replacement of oil fitter during trail will be in scope of contractor page 18 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details if at any time during trials and commissioning, till the piping is finally accepted, any part or parts either structural or belonging to the required to be opened for inspection and checking by the equipment supplier/site in charge (amnsi), this shall be done by the contractor and the parts should be properly refitted and satisfactorily tried after refitting. if it is established that the defects are due to bad workmanship during installation and/or materials, which are within the scope of the contractor’s supply, the charges for all rectification work inclusive of labour, materials and supervision used will be borne by the contractor. until the piping are finally accepted by m/s amnsi and taken over after the successful commissioning, the contractor shall be responsible for any loss/ damage theft etc. for the piping erected by him. k) primary hse requirementinitial documents required to start work: 1. hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3. hira (hazard identification and risk assessment) of activities. 4. tool and tackles third party inspection certificates. 5. dedicated safety manager should be depute at site with organogram of company. 6. communication contact details with mobile no. /email id. 7. list of vehicle/equipment/machines with tpi and other relevant legal documents. 8. list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter (note the scaffolding team will be screened by our team to verify their competency level.) some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss and conduct mock drill every month. 4. take work permit as per amns ptw system and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. mobile phones are not allowed while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and page 19 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details as per category with 6m distance from one to another type and always tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farhana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farhana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standard tool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02 ,dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blankets/tarpaulin with mtc. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at page 20 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. 4. he should be medically fit (the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report ) and should possess a valid medical fitness certificate for work at height jobs from care hospital at arcelormittal nippon steel india, hazira complex(cnh) before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns, as per annexure attached below. details documents will be shared with contractor during detailed technical discussion. sr. no sop document reference no. 1 safety signage <(>&<)> display of safety information amns/project/ts/hsem/18 2 night work safety amns/project/ts/hsem/05 3 lone work safety amns/project/ts/hsem/06 4 working near oh lines amns/project/ts/hsem/08 5 waste management amns/project/ts/hsem/11 6 unloading of container amns/project/ts/hsem/12 7 ppes management amns/project/ts/hsem/13 8 plant <(>&<)> machinery operation amns/project/ts/hsem/08 9 handling <(>&<)> storage of compressed gas cylinder amns/project/ts/hsem/06 10 working in confined space amns/project/ts/hsem/14 11 hot work amns/project/ts/hsem/10 12 hydro test amns/project/ts/hsem/06 13 work at height amns/project/ts/hsem/04 14 blasting <(>&<)> painting safety amns/project/ts/hsem/19 15 simultaneous operation amns/project/ts/hsem/17 16 management of hazardous substances amns/project/ts/hsem/15 17 structural steel fabrication <(>&<)> erection amns/project/ts/hsem/11 18 manual material handling amns/project/ts/hsem/05 19 hand tools <(>&<)> portable power tool safety amns/project/ts/hsem/07 20 age of equipment guidelines amns/safe/71 21 loto amns/project/ts/hsem/20 l) amns scope 1. drawings, qap approved document, delivery schedule will be provided by amns 2. providing essentials like power and water at work site on single point only. 3. lifting and handling equipment’s / eot/ man lifter will be in amns scope. 4. supply of hydraulic oil <(>&<)> flushing oil. page 21 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 5. raw pipe , elbow, union, tee, reducer, coupling, adaptor, valves, cap, flange, hoses, angles channels etc. 6. raw material for pipe supports. 7. supply of n2 and ca compressed air. 8. electricity will be provided at single point near entry <(>&<)> exit area of shed. m) tentative required manpower <(>&<)> resources plan: (note : manpower <(>&<)> resources plan is purely indicative and will have to be increased as per front availability and project schedule requirement) required manpower category number project manager 1 safety manager 1 safety supervisors 2 admin 1 qa/qc engineer 1 scaffold inspector 1 site engineers 2 surveyor 1 storekeeper 1 supervisors 5 foreman 4 structure fitter 3 pipe fitter 7 welders 10 gas cutter 3 grinder/ cutter 10 riggers 25 scaffolders 20 helpers 30 electrician 1 housekeeping manpower 10 blaster <(>&<)> painter 5 farhana, trailer 2 total 150 required resources, tools <(>&<)> tackles category number farhana (15 ton) 1 trailer 1 gas cutter set with trolley 4 arc welding machines (600 amp) 4 tig welding machines 4 single phase welding machine 3 grinding/ cutting machines 10 toolboxes with spanner set 3 box spanner set 3 torque wrenches 2 chain blocks (1 ton, 2 ton <(>&<)> 5 ton) 2 each ff2 grinder 4 portable drilling machine 2 hilti bolt drilling machine 1 pipe bending machine 4 motorised pump for oil filling 1 extension board for electrical connection 5 manual pump for oil 2 web sling (2 ton, 5 ton, 10 ton) 5 pair each d shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each bow shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each welding cable (600 amp) of 100 m <(>&<)> earthing cable 100 m of length for each welding machine 1 lot electrical power panels, industrial extension boards with 100 m cables, db’s, jb’s, single core/ 3 core armoured cables etc as per requirement. 1 lot hydro testing pump with accessories 1 page 22 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details air compressor for pressure testing and flushing 1 blasting and painting machine with accessories 1 set temporary hoses, valves, and fittings 1 lot item note : 3 27016816 50 30 20 erec. stnless steel pipes,valves,&fiting 12,000 inm 10 fabrication of stainless steel pipe 7,000 ind 40 fab, blasting & pntg, & erec of s struc 5 to 50 p & f of mechanical hilti bolts 500 no 30 fab & ere of ss tubing 3,000 m 60 fld radiography test as per scope of wrk 7,500 in 70 miscellaneous 1 lo email : gopal.thummar@amns.in contact : name : gopal thummar item details : scope of work doc no amns/crm2/cgal/008 scope of work for fabrication, laying, <(>&<)> fixing of hydraulic piping for continuous galvanizing <(>&<)> annealing line (cgal) brief summary <(>&<)> scope – am/ns, hazira is in process of installation of 1 mtpa cgal and for this we need a contractor who is specialized in continuous galvanizing line <(>&<)> annealing line for pipeline fabrication, laying and fixing of hydraulic piping sr no. description / activity uom qty 1 fabrication of stainless steel pipe ind 6900 2 erection of stainless steel pipes, valves, and fittings inm 12000 3 fabrication <(>&<)> erection of instrument tubing inm 2000 4 fabrication, blasting <(>&<)> painting, and erection of support structure mt 5 5 providing and fixing of mechanical hilti bolts size (12 16) mm no 500 location of site: hazira, surat, gujarat scope of the contractor a) pipeline fabrication 1. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 2. fabrication of pipe line and supports as per drawing <(>&<)> welding method will be as per specified by am/ns. 3. welders deployed by contractor must have valid welder qualification certificate as per wps <(>&<)> pqr and to be submitted to am/ns before commencement of work. welder performance qualification test shall be performed after receiving request for inspection from the contractor. 4. all the piping and accessories shall be but welded by tig process only. 5. the root of weld shall be protected by the injection of inert gas in the tube during the weld stage. supply of inert gas cylinders will be in vendors scope. 6. tubes shall be prepared as per din 2559. for the preparation and performing of the work a receiving of all the welds by radiography shall be taken into account. in case of poor welds the repair and re control costs shall be charged to the contractor. 7. fabrication of spools as per drawing and minimise welding joints during erection. spools end must be protected with caps after fa brication. 8. in order to reduce as much as possible, the welding, the pipes of size below 1.5 inch shall be cold bent by the hydraulic bending machine. the jaws of the bending machine shall perfectly fit the diameter of the tube. when it is not possible to bend the curves cold, weld accessories should be allowed. 9. testing of joints as per ts and qap. 10. painting of supports as per ts. supply of paint material <(>&<)> page 23 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details painting equipment will be in contractor scope as per am/ns approved make list. 11. all the required manpower, tools and tackles for completion of work in totality. 12. unloading, shifting, unpacking, and stacking of pipes, fittings, valves accessories, support structure at the designated place (storage yard). 13. opi will be as per amns specifications and required manpower, equipment will be supplied by contractor b) scope of work for pipeline erection 1. erection of pipelines, fittings, valves, gaskets, and accessories as per drawing and p<(>&<)>id. 2. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 3. maintaining drawing wise location of pipes <(>&<)> tracking, shifting to site for erection as per requirement 4. pre fabrication and fixing of pipe support at location in accordance with the required level. regular distance as specified by oem between supports to follow. 5. fixing piping up to end position of machine piping will be desirable and under contractor’s scope. 6. support painting and clamping will be under the contractor’s scope. 7. fabrication, painting and fixing of pipe support will be in contractor scope. supply of red oxide and paints will be in contractor scope. (1 coat red oxide, 2 coat paints) 8. providing and fixing of chemical or mechanical hilti bolts for supports as per requirement. 9. welding of pipe joints, fittings must be done according to technical specification (ts) only. 10. threading of pipes for fitment of threaded fittings and valves wherever required will be in vendors scope. 11. all the piping shall arrange in non superposed levels, with a spacing between them and with a sufficient gap towards the bulkhead, so as to dismantle them with usual tools and particularly when the tube joining shall be made with removable fittings. 12. all the piping shall be laid without any erection difficulty. a draining shall be set at each end. an airing shall be foreseen at each high point. 13. simultaneous and sequential erection of pipeline at each level must be done along with scaffolding with all safety requirements of work at height including lifelines, safety nets and proper handrails, staircase and ladders must be provided. 14. laying of pipeline over the supports at position and fit up of joints, field welding as per specification/ ts and fixing of clamps. 15. welding of pipeline <(>&<)> joints to be done with suitable welding electrode in all pipe lines. welding electrode shall be procure as per am/ns approved make list. 16. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, cutting wheels, die penetration kit for welding testing, wire rope slings / web slings of appropriate sizes, spanners all types <(>&<)> sizes of etc. 17. all tools and tackles for lifting /shifting/erection will be in contractor’s scope. 18. all machines and tools for erection like pipe bending machines, arc welding machines, tig/argon welding machines, gas cutting sets, grinding <(>&<)> cutting machines, hydraulic jacks <(>&<)> pumps, flushing unit, pressure testing pumps etc. 19. charging of accumulators to be done as per ts. supply of filled nitrogen gas cylinder, n2 charging kit <(>&<)> all accessories will be in scope of contractor. 20. clamping of pipe lines as per drawing / ts. 21. co ordinate with am/ns for the planning of sequential and quality work execution in accordance with the best engineering practice. 22. preparing <(>&<)> taking handing over protocols with page 24 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details civil/structural dept. 23. preparation of the protocol of the erection <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. 24. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. 25. manpower for assisting in cold <(>&<)> hot trail in line commissioning till handover. 26. all inspection <(>&<)> testing tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to am/ns. 27. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type) and certified scaffolding inspector. 28. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. 29. all height work approach to be done only with man lifter. wherever man lifter approach is not possible, contractor has to prepare scaffolding platforms for pipeline erection. 30. final paint touch up need to be done as required and paint and painting equipment will be in scope of contractor. 31. farhana/crane if required for erection will be provided by amns but erection and handling of pipes and fittings to be done manually by contractor. 32. resources deployment plan to be submit as per requirement of project. 33. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. 34. pre filling of oil in hydraulic power pack will be scope of contractor 35. dp test – all socket weld joints must be dp tested by contractor 36. any crimping job for instrumentation line or grease line will be in vendor scope. 37. no o ring or gaskets should not be damaged during installation of pipe end fitting. 38. hydraulic power unit and required filters till nas value stabilization 39. all pipe fittings , hoses and accessories unloading and record keeping at storage area will be in contractor scope . 40. crimping tool for crimping of pneumatic piping 41. all flange and clamping bolts tightening with torque wrench 42. any extra tapping points required considering site conditions c) hydro testing 1. hydro testing of all the erected lines has to be performed by vendor/contractor. 2. final pressure testing will be 1.5 times of designed pressure. 3. pump and all accessories for pressure testing will be in contractors scope. 4. looping of the pipeline for testing will be scope of contractor. temporary material required for looping like hoses, valves, pipe fittings, fasteners etc will be in contactor’s scope. 5. system components which may present a restriction to flow or which may be damaged by pressure testing and high flushing flow should be by passed with suitable make up pieces. 6. after hydro testing pipe lines must be flushed and dried by compressed air. 7. itp (inspection and test plan) shall be submitted for approval before pressure testing begins. d) flushing 1. flushing of hydraulic lines will be under contractor’s scope as per amnsi sop(s). 2. flushing of lines with looping of pipes and its accessories including hoses , powerpack, supports, headers, valve, flanges, heater, filters, page 25 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details filtration unit and etc. will be under contractors scope. all flushing unit will be in contractors scope. 3. flushing should be in every pipes as per amnsi sop. 4. oil cleaning and maintaining oil filtration with filtration machine as per sop. providing <(>&<)> replacement of filter cartridge will be in contractors’ scope till the required nas level is achieved. 5. nas kit/machine will be in contractor scope. (the nas value should be less than or equal to 4 strictly) 6. system components which may present a restriction to flow or which may be damaged by high flushing flow should be by passed with suitable make up pieces. 7. flushing oil will be provided by amns. e) rt testing 1. a minimum of 10 % radiography testing (random) will be under contractor’s scope. 2. all compliance related to safety has to be complied with 100% without fail. 3. vendor shall deploy radiography camera with sufficient curie strength. 4. your rso/site in charge shall collect the details of welding joints offered for radiography in the evening from amns quality in charge. 5. vendor shall submit the previous day/night generated film/ report to amns by the next day. 6. helper’s will be in vendor’s scope. 7. lighting, scaffolding <(>&<)> platform to facilitate work. 8. d7 grade film will be used but slow processing film like d4 or d5 may be asked if situation demands. 9. if any rt film is given retake by amns quality due to any issue then that segment will not be considered. 10. against failure of joint vendor will have to perform rt for 3 more joints as penalty against failed joint. f) inspection and testing amns scope 1. qap/itp approval. 2. technical specification 3. job procedures approval 4. proposed wps and final wps approval 5. fabrication and erection methodology approval 6. pqr <(>&<)> welder qualification etc. approval for lab testing process. 7. rm <(>&<)> consumable lab testing approval. vendor’s scope 1. competent person to be engaged who should be having well knowledge in inspection of fabrication and erection of piping, welding, welder qualification, incoming material inspection etc. having well versed in asme b31.3, secix, secii, secv etc as per approved itp and piping ts. 2. initial approval of engaged manpower from amns concern person is required by sharing resume and subsequent interview. inspection during fabrication 1. conducting wps/pqr, welder performance qualification test after receiving request for inspection from the contractor. 2. inspection of all incoming material and signing the reports after clearing. 3. marking dimensions checking, cutting etc. 4. piping fitup/alignment, orientation, flange alignment etc. inspection to be done as per drawing and approved wps. 5. all stagewise inspection to be carried out as per approved itp. 6. witnessing root dpt and giving clearance for further subsequent pass. 7. knowledge of film interpretation is required. 8. weld visual <(>&<)> rf pad testing (if required) inspection to be done after receiving rfi from the contractor. inspection during erection 1. inspection erection and alignment of spools valves etc. for in situ joints of above ground location <(>&<)> disposition of terminal joints, elevation, slope, identification of the components <(>&<)> page 26 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details support erection. 2. checking blasting, painting, climate monitoring etc. as per ts and standard. inspection during mechanical <(>&<)> post testing completion 1. checking test pack/loop files for mechanical clearance wrt isometric drawings, p<(>&<)>id etc. and providing punch points and same to be closed post compliance. 2. lhs checking wrt ndt and quality point of view, providing punch points if any and same to be closed post compliance. 3. witnessing hydro/pneumatic testing. 4. witnessing carboard blasting, air blowing etc. and box up inspection. ensuring all components to be reinstate as per the p<(>&<)>id requirement. 5. checking all final documents and report signing as per approved itp. g) measurement criteria 1. welded joints of pipe fitting will be calculated in inch diameter. 2. pipe laying will be calculated in inch meter. no separate billing will be claimed for cold bends, will be also a part of pipe laying in inch meter. 3. one flange joint in the pipeline will be considered as per the size in inch diameter. 4. installation charges of valves, bellows, strainers in pipe fitting will be considered as 1 meter straight pipe length. 5. fabrication of pipeline mentioned in inch diameter as uom will be measured on basis of dn. 6. fabrication of special fittings such as reducers, tee branches of pipe fitting will be calculated as per welding in running inch diameter. 7. pipe and tube size less than 1 inch will be calculated as per actual running weld in inch diameter <(>&<)> actual length in inch meter. tubing will be part of piping scope. 8. any hydraulic fittings which will be fitted on pipe, will not be claimed in billing. 9. no separate bill will be claimed for pipe clamping, pressure testing <(>&<)> flushing of pipeline, it will be covered in pipe erection. h) project tentative time schedule – unit erection start time duration (max) cgal feb 24 8 months i) general points 1. contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. 2. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they must execute the job in coordination with oem <(>&<)> am/ns team. 3. a qualified <(>&<)> competent safety manager to be deployed with complete safety org chart. 4. a qualified <(>&<)> competent qa/qc engineer to be deployed to meet qa/qc standard of amns 5. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 6. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. no space is available on site for accommodation. 7. contractor must follow the safety rules of am/ns. 8. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. 9. packing list received from material boxes to be submitted to amns. page 27 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details loose items to be kept properly in rack/boxes. 10. proper housekeeping of the erection area in contractor scope. 11. contractor shall provide all the personal protective items like helmet, safety shoes, safety jacket to all the team members according to the requirement and ensure 100% use of the same. 12. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 13. am/ns will provide the required drawings/ documents required for erection. 14. shifting of scrap to the designated scrap yard. 15. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. 16. any revise drawing job and modification in line as per site condition should be in contractor scope. 17. safety kit/first aid box, flashback arrestor, dial guage, conduit piping, flexible wires, electrical db with proper rating elcb/rccb will be contractor scope. 18. manpower support for acid disposal tank and housekeeping activity after execution of job at work will be in contractor scope. j) information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. equipment deployment plan. 5. list of tools <(>&<)> tackles 6. list of material handling equipment like farhana, forklift, trailers etc. 7. reference list for similar kind of jobs in cold rolling complex. e. start up commissioning <(>&<)> final acceptance (general) scope the contractor shall provide necessary equipment, tools, tackles, instruments, labor, supervision etc. for the following: a) prepare piping for trial and start up. b) start up and commissioning piping c) final acceptance. preparation of piping for trial and start up: the contractor shall provide adequate personnel as approved by the site in charge to assist the equipment supplier and operating personnel of amnsi in starting up and commissioning of piping as well as for adjustments, repairs, and rectifications of defects in erection of the piping during commissioning of the equipment. the contractor shall adjust piping as required by the equipment supplier with the approval of the site in charge (amnsi). the contractor shall be required to clean up the piping and prepare it for trial runs and operation in accordance with the equipment supplier’s instructions. the contractor shall bring to site such equipment, tools, instruments, labor etc. as it is deemed necessary to cater for the work, which shall include but not limited to the following. 1. clean up dirt, remove any protective coating applied by the manufacturer, clean ventilating openings and remove all visible foreign bodies from the equipment erected. 2. all flanges, inlet and outlet connections etc. shall be checked for tightness. 3. blow down all piping systems, install and remove strainers in piping and equipment as required. 4. any modification related to hydraulic power pack piping <(>&<)> hydraulic piping supplied by oem need to be done by contractor 5. any piping cleaning need to be done by pre fitted provided by oem( removing, cleaning <(>&<)> fitting of all pipes <(>&<)> joint) 6. replacement of oil fitter during trail will be in scope of contractor if at any time during trials and commissioning, till the piping is finally accepted, any part or parts either structural or belonging to page 28 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details the required to be opened for inspection and checking by the equipment supplier/site in charge (amnsi), this shall be done by the contractor and the parts should be properly refitted and satisfactorily tried after refitting. if it is established that the defects are due to bad workmanship during installation and/or materials, which are within the scope of the contractor’s supply, the charges for all rectification work inclusive of labour, materials and supervision used will be borne by the contractor. until the piping are finally accepted by m/s amnsi and taken over after the successful commissioning, the contractor shall be responsible for any loss/ damage theft etc. for the piping erected by him. k) primary hse requirementinitial documents required to start work: 1. hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3. hira (hazard identification and risk assessment) of activities. 4. tool and tackles third party inspection certificates. 5. dedicated safety manager should be depute at site with organogram of company. 6. communication contact details with mobile no. /email id. 7. list of vehicle/equipment/machines with tpi and other relevant legal documents. 8. list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter (note the scaffolding team will be screened by our team to verify their competency level.) some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss and conduct mock drill every month. 4. take work permit as per amns ptw system and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. mobile phones are not allowed while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type and always tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) page 29 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farhana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farhana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standard tool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02 ,dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blankets/tarpaulin with mtc. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and page 30 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. 4. he should be medically fit (the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report ) and should possess a valid medical fitness certificate for work at height jobs from care hospital at arcelormittal nippon steel india, hazira complex(cnh) before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns, as per annexure attached below. details documents will be shared with contractor during detailed technical discussion. sr. no sop document reference no. 1 safety signage <(>&<)> display of safety information amns/project/ts/hsem/18 2 night work safety amns/project/ts/hsem/05 3 lone work safety amns/project/ts/hsem/06 4 working near oh lines amns/project/ts/hsem/08 5 waste management amns/project/ts/hsem/11 6 unloading of container amns/project/ts/hsem/12 7 ppes management amns/project/ts/hsem/13 8 plant <(>&<)> machinery operation amns/project/ts/hsem/08 9 handling <(>&<)> storage of compressed gas cylinder amns/project/ts/hsem/06 10 working in confined space amns/project/ts/hsem/14 11 hot work amns/project/ts/hsem/10 12 hydro test amns/project/ts/hsem/06 13 work at height amns/project/ts/hsem/04 14 blasting <(>&<)> painting safety amns/project/ts/hsem/19 15 simultaneous operation amns/project/ts/hsem/17 16 management of hazardous substances amns/project/ts/hsem/15 17 structural steel fabrication <(>&<)> erection amns/project/ts/hsem/11 18 manual material handling amns/project/ts/hsem/05 19 hand tools <(>&<)> portable power tool safety amns/project/ts/hsem/07 20 age of equipment guidelines amns/safe/71 21 loto amns/project/ts/hsem/20 l) amns scope – 1. drawings, qap approved document, delivery schedule will be provided by amns 2. providing essentials like power and water at work site on single point only. 3. lifting and handling equipment’s / eot/ man lifter will be in amns scope. 4. supply of hydraulic oil <(>&<)> flushing oil. 5. raw pipe , elbow, union, tee, reducer, coupling, adaptor, valves, cap, flange, hoses, angles channels etc. 6. raw material for pipe supports. page 31 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 7. supply of n2 8. electricity will be provided at single point near entry <(>&<)> exit area of shed. m) tentative required manpower <(>&<)> resources plan: (note : manpower <(>&<)> resources plan is purely indicative and will have to be increased as per front availability and project schedule requirement) required manpower category number project manager 1 safety manager 1 safety supervisors 2 admin 1 qa/qc engineer 1 scaffold inspector 1 site engineers 2 surveyor 1 storekeeper 1 supervisors 4 foreman 3 structure fitter 2 pipe fitter 6 welders 7 gas cutter 3 grinder/ cutter 6 riggers 15 scaffolders 12 helpers 20 electrician 1 housekeeping manpower 5 blaster <(>&<)> painter 3 farhana, trailer 2 total 100 required resources, tools <(>&<)> tackles category number farhana (15 ton) 1 gas cutter set with trolley 4 arc welding machines (600 amp) 4 tig welding machines 4 single phase welding machine 3 grinding/ cutting machines 10 toolboxes with spanner set 3 box spanner set 3 torque wrenches 2 chain blocks (1 ton, 2 ton <(>&<)> 5 ton) 2 each ff2 grinder 4 portable drilling machine 2 hilti bolt drilling machine 1 pipe bending machine 4 motorised pump for oil filling 1 extension board for electrical connection 5 manual pump for oil 2 web sling (2 ton, 5 ton, 10 ton) 5 pair each d shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each bow shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each welding cable (600 amp) of 100 m <(>&<)> earthing cable 100 m of length for each welding machine 1 lot electrical power panels, industrial extension boards with 100 m cables, db’s, jb’s, single core/ 3 core armoured cables etc as per requirement. 1 lot hydro testing pump with accessories 1 air compressor for pressure testing and flushing 1 oil flushing unit with accessories 2 set temporary hoses, valves, and fittings 1 lot...

Jamnagar Municipal Corporation - Gujarat

42126315 supplying of fire fighting instrument; sor / estimated rate item no. item description qty unit 0.00 21 150 gms ifr coverall with collar, front zipper closere with flap, two chest pocket with fr velcro closure flap, one hip pockets with fr velcro closure flap, one tool pockets on right leg, two lateral pockets, plain straight cuff and elasticated waist, pen holder and spectable holder, color navy blue, 1 nos 0.00 22 led search lights range 1 km rechagable 1 nos 0.00 23 ba servicing 1 nos 0.00 24 hydrotest of ba cylinder 300 bar 6 ltr 1 nos 0.00 25 refilling of ba cylinder 300 bar 6 ltr 1 nos 0.00 26 chlorine kit isi marked 1 nos 0.00 27 rope rescue kit 1 nos 0.00 28 1 ton capacity rope ( synthatic fire export quality ) 1 nos 0.00 29 full body harness 1 nos 0.00 30 half body harness 1 nos 0.00 31 karabiner 1 nos 0.00 32 fiture of 8 1 nos 0.00 33 d sender 1 nos 0.00 34 a sender 1 nos 0.00 35 single pully & double pully 1 nos 0.00 36 prisek loop 1 nos 0.00 37 red sealling & blue sealling 1 nos 0.00 38 breathing apparatus ( ba set ) 300 bar pressure 6 ltr 1 nos 0.00 39 breathing apparatus ( ba set ) 300 bar pressure 6.8 ltr with composite cylinder 1 nos 0.00 40 fireman axe ( is:926 ) 1 nos 0.00 41 celling hook 1 nos 0.00 42 ba set servicing & maintenance 1 nos 0.00 43 ba set repairing 1 nos 0.00 44 spare parts f ba set & fire extinguisher 1 nos 0.00 45 life jacket mmd approved 1 nos 0.00 46 ring boya mmd approved 1 nos 0.00 47 branch : fb 5x foam making branch pipe, 7 kg, / cml size : 63 mm flow 225 450 ppm aluminium : material 1 nos 0.00 48 branch : fb 10x ioran making branch aluminium : material presser : 7 kg / cml, nozzle diameter 63 mm more inst. 1 nos 0.00 49 branch : hand control nozzle : material : gunmatal / ss, presser : 7 kg / cm2, nozzle diameter 63 mm more inst. 1 nos 0.00 50 wooden cutter ( petrol cutter ) engine power in kw ( 3.3 kld ) bsc power : 8500 / 22 inch. 1 nos; 0.00 1 dry chemical powder 6 kg a.b.c., type stored pressure isi mark fire extinguisher stos pressure type bis 15683 1 nos 0.00 2 co2 type fire extinguisher 4.5 kg, isi mark as per bis:15683 1 nos 0.00 3 chlorine gas detector alarm with battery operated 1 nos 0.00 4 stand alone type smoke detector alarm with battery operated 1 nos 0.00 5 refilling of following fire extinguisher ( inciluding all charges like transportation, receiveng, delivering, installation, etc ) 1 nos 0.00 6 hydrotest of following fire extinguisher ( abc 6kg & co2 4.5 kg ) 1 nos 0.00 7 canvas hose fire; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 15 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 15m with ss coupling. 1 nos 0.00 8 canvas hose fire; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 30 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 30m with ss coupling. 1 nos 0.00 9 reinforce rubber line hose fire ; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 15 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 15m with ss coupling. 1 nos 0.00 10 reinforce rubber line hose fire; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 30 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 30m with ss coupling. 1 nos 0.00 11 synthetic hose fire ; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 15 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 15m with ss coupling. 1 nos 0.00 12 synthetic hose fire; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 30 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 30m with ss coupling. 1 nos 0.00 13 afff form compound isi mark 20 litre packing 1 nos 0.00 14 personal protective equipment 1 nos 0.00 15 gum boot steel toe type 1 pair 0.00 16 fireman safety helmet ( frp open type ) flame retardant rubber outsole, fuei oil resistant sole suilable for inimical environment, with stand 18 kv of life current at dry condition, cold insuilation sole construction, ( in with standerd, ansi, ce, fda, etc. ) nfpa 1971 2013 1 nos 0.00 17 spectacles, frameless with 99.9 % uv protected scratch 7 impact resistant polycarbonate clear lens ( isi / ce marked ) 1 nos 0.00 18 supported hand gloves having black polyester liner 13 gauge with black pu coating smooth finish and yellow elastic. 1 nos 0.00 19 11 kv electrical hand gloves ( with certificate ) 1 nos 0.00 20 disposble surgical gloves 1 pair...

Jamnagar Municipal Corporation - Gujarat

41582996 supply of fire fighting item; 1 dry chemical powder 6 kg a.b.c., type stored pressure isi mark fire extinguisher stos pressure type bis 15683 1 nos 2 co2 type fire extinguisher 4.5 kg, isi mark as per bis:15683 1 nos 3 chlorine gas detector alarm with battery operated 1 nos 4 stand alone type smoke detector alarm with battery operated 1 nos 5 refilling of following fire extinguisher ( inciluding all charges like transportation, receiveng, delivering, installation, etc ) 1 nos 6 hydrotest of following fire extinguisher ( abc 6kg & co2 4.5 kg ) 1 nos 7 canvas hose fire; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 15 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 15m with ss coupling. 1 nos 8 canvas hose fire; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 30 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 30m with ss coupling. 1 nos 9 reinforce rubber line hose fire ; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 15 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 15m with ss coupling. 1 nos 10 reinforce rubber line hose fire; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 30 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 30m with ss coupling. 1 nos 11 synthetic hose fire ; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 15 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 15m with ss coupling. 1 nos 12 synthetic hose fire; 63 mm , 15, is636 1988, type b hose, fire; inside diameter:63 mm, length: 30 m, standard: is 636 1988; fft: type b, with ss coupling hose fire; 63mm, 30m with ss coupling. 1 nos 13 afff form compound isi mark 20 litre packing 1 nos 12 personal protective equipment 1 nos 13 gum boot steel toe type 1 pair...

Department Of Panchayat & Rural Development - Gujarat

41412394 bids are invited for hypodermic needle and syringes hypodermic needle 18 gauge , sterile hypodermic syringe 5 ml , personal protective equipment ppe kit , protective eye goggles , surgical rubber gloves total quantity : 600600...

Arcelor Mittal Nippon Steel India Limited - Gujarat

41289412 tender for supply& appl. lrb insulation k3 baghouse 1 27018123 10 10 10 supply& appl. lrb insulation 50mm 600 m2 email : harit.mehta@amns.in contact : name : harit mehta item details : annexure – 1 spr title: kiln#3 baghouse insulation work job description: lrb insulation 50mm with density 80 kg/m3 with 22 swg al.sheet cladding for lime kiln#3 baghouse qty: 600 m2 scope of work vendor • contractor shall provide all services inclusive of all materials like lbr insulation 50mm with density 80 kg/m3, 22 swg al cladding (sheet), ms strip for spacer ring, screw and the putty for sealing etc… • providing all necessary required manpower, skilled / unskilled worker, technical supervisor tools <(>&<)> tackles and equipments at site of work • fixing of insulation work of entire baghouse and connecting ducts. • lifting and shifting of insulation material at site. • required scaffolding in scope of vendor. • required tools, tackles and equipment to complete the work. • all necessary services to complete the job in scope of vendor. • work will be done from 8.5 mtr to 19 mtr platform level. scope of work amnsi • work supervision and ongoing and final inspection of scaffolding work. • utility like power, water and air. specific penalty for nonperformance by vendor and must be cardinally measured • safety violation must be penalizing as per central safety committee rule. • job quantity will be decided by the department/site in charge • contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all necessary ppe’s (personal protective equipment) item note :...

Ministry Of Defence - Gujarat

41093036 bids are invited for personal protective equipment helmet , gloves 440v , working gloves , safety goggles , safety harness , plastic approns , ear defender , gum boots , line tester , reflective jacketes , linoleum sheet , temperature gun , stroboscope total quantity : 396...

Health And Family Welfare Department - Gujarat

40998772 tender document for tablets, injections, miscellaneous and surgical items year 2023 24 ( part 2 ) solution hydrogen peroxide 200 ml, solution povidone iodine 10% 1 litre, solution salbutamol for nebulizer 2.5 mg / 3 ml 15 ml, x ray fixture 5 liters, rapid readout biological indicators for rapid read out indicator • rapid readout biological indicators for steam sterilization containing a standardized, viable population of bacillus stearothermophilus spores 10 5 or 10, biological indicator for steam steriliser • self contained vials of spore strip b. stero thermophilus population 10 5 or 10 6 population • easily identifiable color change, biological indicator for eto steriliser • self contained vials of spore strip bacillus atropheus population 10 5 or 10 6 population • easily identifiable color change in ca, enzyme cleaner • multiple enzymatic concentrate solution with lipases, cellulases, proteases and amylases • must act aga, gluteraldehyde monitor • indicator strips to check the minimum effective concentration ( 1.5% ) of 2% glutaraldehyde solution • visual co, chemical indicator tape steam sterilser •1nos=18mm wide x 50 meter length , self adhesive should be lead free • heat sensitive chemical indicator self adherent tape • should not leave any adhesive residue, for steam sterilization cycles. • unmistakable color change for easy identification after processed in steam autoclaves of different time and temperature requirements, within 15 minutes at 121 degree c and 3 minutes at 134 degree c. •class 1: confirms to ansi / aami / iso 11140 1: 2005 • certificate of analysis should be available for every batch, chemical integrator • moving front chemical integrators, indicating accept or reject, to verify all perimeters of steam sterilization together i.e. time, temperature and quality of steam. • can be used for pack control monitoring of all 121 134°c steam sterilization cycles • chemical should be inside a laminate to ensure any chemical transfer from indicator to pack / instruments should be compliant to bs / en / iso 11140 1: 2005, bowie dick test pack • test packs for monitoring vacuum formation in autoclave chambers. • test sheet along with penetration challenge material should be in a single easy handled pack. • should be lead free • weight per pack should be 110 to 125 gms • should be compliant to ansi / aami / iso 11140 1:20051 • should be compliant to ansi / aami / iso 11140 5:20072, bowie dick test pack early warning •consists of chemical indicators on two test sheets positioned inside porous materials and sealed inside a disposable outer wrap. the primary test sheet will turn a uniform dark brown / black color, except when air removal failures such as air leaks occur. • an early warning indicator sheet identifies problems sooner, so the sterilizer may be repaired before it must be taken out of use. this sheet has an indicator dot that turns from yellow to dark brown / black for early detection of air removal failures before they appear on the primary test sheet, packaging material for steam steriliser • heat sealable sterilization packaging material of medical grade paper on one side and laminate of polyester and polypropylene on the other for both steam and eo sterilization. • packaging material should have chemical process indicators for both eto and steam sterilization processes, printed on the paper side to allow the differentiation between processed and unprocessed packages. • for easy computation of length multibar heat sealants with measurements at regular interval incorporated., non ahldehyde disinfectants for surface cleaning , fogging and fumigation . ph neutral . super oxidized solution along with hypochlorous acid and sodium hypochlorite and other ions .with good stability of at least for 1 year non cytotoxic, steroid free and non irritating bactericidal, virucidal, fungicidal, mycobactericidal, sporicidal, showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus, non ahldehyde disinfectants for surface cleaning , fogging and fumigation . ph neutral . silver nitrate and hydrogen peroxide .with good stability of at least for 1 year non cytotoxic, steroid free and non irritating bactericidal, virucidal, fungicidal, mycobactericidal, sporicidal, showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus, non ahldehyde disinfectants for surface cleaning , fogging and fumigation quaternary ammonium compounds polyhexamethylen biguanide hcl, didecyl dimethyl ammon ium chloride non cytotoxic, steroid free and non irritating bactericidal, virucidal, fungicidal, mycobactericidal, sporicidal, showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus, process challenge device for vacuum steam steriliser • process challenge device ( pcd ) that contains a 3 hour readout biological indicator plus a steam chemical integrator for fast turnaround times for load releases • class 5 integrator moving front chemical integrators to verify all perimeters of steam sterilization together i.e. time, temperature and quality of steam. read out indicates accept or reject after processing. • rapid bi rapid readout biological indicators for steam sterilization containing a standardized, viable population of bacillus stearothermophilus spores. the indicator detects the presence of viable spores by the production of fluorescence in one to three hours. designed and certified as per iso 11138 and en 866 • should be compliant to aami standards that recommend a bi pcd containing a class 5., gluteraldehyde • 2% glutraldehyde for disinfection and sterilization purpose • liquid activator with unique anticorrosive property for safety of long term exposed instruments and devices non cytotoxic, steroid free and non irritating.bactericidal, virucidal, fungicidal, mycobactericidal, sporicidal, showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus, gluteraldehyde and opa • 2% glutraldehyde and opa for disinfection and sterilization purpose • liquid activator with unique anticorrosive property for safety of long term exposed instruments and devices.bactericidal, virucidal, fungicidal, mycobactericidal, sporicidal, showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus, radiology department x ray film size 12" x 15", x ray film size 10" x 12", x ray film size 8" x 10", liver lock syring 5 ml, lead markers, lead markers, lead markers, lead vinyl radiation protection appron., x ray developing hanger, x ray developing hanger, x ray developing hanger, lead markers, lead markers, lead markers, fibrin sealant kit contain ( thrombin 500 iu and 4 iu ) with calcium chloride 1 ml and aprotinin, us fda approved aprotinin free fibrin sealant with tri lumen catheter tip, containing one vial of bac2 ( 55 85 mg / ml fibrinogen ) & thrombin ( 800 1200 iu / ml human thrombin ) frozen solutions, us fda approved aprotinin free fibrin sealant with tri lumen catheter tip, containing one vial of bac2 ( 55 85 mg / ml fibrinogen ) & thrombin ( 800 1200 iu / ml human thrombin ) frozen solutions, dry view laser camera dvb films for kodak cr system, repsules budesonide 0.5mg / 2ml, solution 0.01% ionic silver nitrate with surfactant, trisbuffer, menthol and glycerol 100 ml, solution 0.01% ionic silver nitrate with surfactant, trisbuffer, menthol and glycerol 250 ml, soda lime jar 5kg, fusion ( nutrition ) powder, budecort respule, duolin respule, syp. citralka, vitamine d3 sachet, budacort solution nebulization, pow. neomycine, syp. cefixime, syp.ibugesic plus, syp. augmentine, syp. citralka, syp. iron folic acid, syp. rantac, syp. calcium, syp.peracitamol, syp. moxiclave, syp.mextra.p, syp. acicaine, syp. potrate mb6, syp. refzil o, syp.rantac mp3, syp mulmin, syp. heam up, eye drop.moxi, eye drop c.m.c, vita d3 sachet, bitadine gargle, neb. mucomix, neb duoline plus budecort, eye drop saliwax, eye drop ciplox, bpd 5 / %lotion, ointment. thrombophobe, ointment. mupic, ointment. fusiat, ointment. bethamethasone, ointment smily, soda lime jar, gluco meter strips, isoflurone vaporizer 200ml, savlone solutione 1 liter, b.p cuff obese, b.p coff large, b.p cuff pediatric, carboxy methyleye drope, lox 10% spray, xylometazoline nasal drope, spirit, k 3 edta vaccuty purple, plan vaccuty red, sodium citrete 3.2% ( blue ) , sodium fluoride na2edta, digital x ray film size ( 8 x 10 ) dry view camera films for carestream cr system size:8"*10" mfg.by carestream, absorbent cotton wool ( 400 gm ) 1 roll, absorbent cotton wool ( 500 gm ) 1 roll, absorbent gauze ( 20mtr x 90cm ) 1 than, adhesive tape ( 5cm x 10mtr ) 6 roll ( 1 cylinder ) , adhesive tape ( 7.5cm x 10mtr ) 4 roll 1 cylinder, bandage cloth ( 20mtr x 90cm ) 1 than, bandage plaster of paris ( 10cm x 2.7mtr ) 1 roll, bandage plaster of paris ( 15cm x 2.7mtr ) 1 roll, bain circuit pediatric, bain circuit adult, biological indicator 1292 / 3 mm, biological chemical intigrator 1243a / 3 m, bd spinal needle 22g, closed circuit pediatric, closed circuit adult, crepe bandage pack ( 10cm x 4mtr ) 1 roll, crepe bandage pack ( 6cm x 4mtr ) 1 roll, condom catheter adult, catury wire, disposable urine container 40 ml, eco protect wipes, elastic adhesive bandage ( 10 cm x 4 mtr. ) 1 roll, h.m.e filter, jamshidi done biopsy needle size. ( 8 ) , jamshidi done biopsy needle size. ( 9 ) , jamshidi done biopsy needle size. ( 10 ) , silicon catheter size ( 14 ) , silicon catheter size ( 16 ) , silicon catheter size ( 18 ) , soft cotton roll 4", soft cotton roll 6", soft cotton roll3", spinal drape, , kanee u drape, hip u drape, pft mouthpiece, plaster of paris bandage 7.5 cm x2.7 mtr, plaster of paris bandage 10 cm x2.7 mtr, plaster of paris bandage 15 cm x2.7 mtr, plain plastic sheet, hydrogen peroxide 11% w / v with 0.01% w / v of diluted silver nitrate solution 500 ml, i.v.flow regulator dialflow, disposable diet gloves, disposable diet cap, disposable rubber gloves ( non sterile ) , disposable rubber gloves ( non sterile ) , disposable rubber gloves ( non sterile ) , disposable rubber gloves ( non sterile ) , disposable rubber gloves ( non sterile ) , disposable rubber gloves ( sterile ) , disposable rubber gloves ( sterile ) , disposable rubber gloves ( sterile ) , disposable rubber gloves ( sterile ) , disposable rubber gloves ( sterile ) , disposable sterile plastic gloves, disposable surgical set suction handle with tube ( romson vaccue ) , disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable plastic syringe, disposable hypodermic needle, disposable hypodermic needle, disposable hypodermic needle, disposable hypodermic needle, disposable hypodermic needle, disposable hypodermic needle, disposable hypodermic needle, disposable hypodermic needle, disposable spinal needle sterile, disposable spinal needle sterile, disposable spinal needle sterile, disposable spinal needle sterile, disposable spinal needle sterile, disposable spinal needle sterile, disposable spinal needle sterile, disposable spinal needle sterile, disposable spinal needle sterile, long spinal needle, long spinal needle, long spinal needle, long spinal needle, long spinal needle, long spinal needle, long spinal needle, long spinal needle, disposable i.v. cannula eto sterilised, disposable i.v. cannula eto sterilised, disposable i.v. cannula eto sterilised, disposable i.v. cannula eto sterilised, disposable i.v. cannula eto sterilised, disposable infant feeding tube eto sterilised, disposable infant feeding tube eto sterilised, disposable infant feeding tube eto sterilised, disposable infant feeding tube eto sterilised, disposable infant feeding tube eto sterilised, disposable suction catheter, disposable suction catheter, item name with specification, disposable suction catheter, disposable suction catheter, disposable suction catheter, disposable suction catheter, disposable suction catheter, disposable ryles tube eto sterilised, disposable ryles tube eto sterilised, disposable ryles tube eto sterilised, disposable ryles tube eto sterilised, disposable ryles tube eto sterilised, disposable ryles tube eto sterilised, disposable urethral cathater eto sterilised, disposable urethral cathater eto sterilised, disposable urethral cathater eto sterilised, scalp vein set eto sterilised, scalp vein set eto sterilised, scalp vein set eto sterilised, scalp vein set eto sterilised, scalp vein set eto sterilised, scalp vein set eto sterilised, two way foley’s catheter, two way foley’s catheter, two way foley’s catheter, two way foley’s catheter, two way foley’s catheter, two way foley’s catheter, two way foley’s catheter, intra costal drainage tube ( icd tube ) , intra costal drainage tube ( icd tube ) , intra costal drainage tube ( icd tube ) , intra costal drainage tube ( icd tube ) , intra costal drainage tube ( icd tube ) , intra costal drainage tube ( icd tube ) , intra costal drainage tube ( icd tube ) , intra costal drainage tube ( icd tube ) , closed wound suction unit sterilised, closed wound suction unit sterilised, closed wound suction unit sterilised, closed wound suction unit sterilised, closed wound suction unit sterilised, epidural catheter, epidural catheter, epidural catheter, epidural needle with stylet, epidural needle with stylet, epidural needle with stylet, epidural needle with stylet, paediatric epidural set containing epidural needle & catheter, sterile epidural kit containing needle 18 g, catheter & three lateral eyes & luer lock / twist connector, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube with cuff, disposable endotracheal tube without cuff, disposable endotracheal tube without cuff, disposable endotracheal tube without cuff, disposable endotracheal tube without cuff, disposable endotracheal tube without cuff, disposable endotracheal tube without cuff, disposable endotracheal tube without cuff, disposable endotracheal tube without cuff, disposable endotracheal tube without cuff, surgical blade sterile, surgical blade sterile, surgical blade sterile, surgical blade sterile, surgical blade sterile, surgical blade sterile, surgical blade sterile, surgical blade sterile, ecg roll standard size, ecg roll standard size, chest lead, three way stopcocks, extension line with three way stop cock, extension line with three way stop cock, extension line with three way stop cock, disposable shoe cover, disposable surgeon cap non woven, disposable surgeon gown non woven medium size, disposable surgeon gown non woven large size, disposable surgical face mask, n 95 mask, protective goggles ( red / yellow ) , personal protective equipment kit containing face mask, cap, surgical gown ( non woven ) , shoe cover, googles, refrigerator temperature thermometer...

Department of School Education - Gujarat

40995861 bids are invited for skill lab equipment 1 51 single needle stitch machine with needle guard , over lock machine , sewing machine accessories and attachments , shears 8 to 10 inch iron blade for cutting fabric , paper scissors , seam ripper , tracing wheel , tailors chalk , craft bayonet , safety pins , dress marker pin , scale , measuring tapeline , bobbin and bobbin case for industrial machine , hand needles , machine needles , needle threader , notcher 1i4 x 1i6 inch opening , dress form male and female , thread , personal protective equipment nose mask goggles etc , cutting table , students sewing stools , first aid box , receptacle for storing items , white board ands adjunct , machine oil , stationary chattels , delineate grid , sewing caskate , student refuge sewing casing , automatic thread indicator , teaching learning material , drawing sheets , pencils , rubber , tracing paper , cartridge sheets , board pins , hooks blouse pant skirt , zips , charts of color theory , poster colors set of 12 , paint brush flat and round , brown paper , detergents and strain removing agents , screw driver set , plier set of 4 , spanner set , garment hanger , rubber mate , electric press automatic , waste paper basket , buckets 20 litres , magnifying glass , pencils 2b 4b 6b 8b hb , sharpener , cutter , fabric swatch card , extension board electric , tailor art curve 1i4 16 , shaper wooden leg arm hole collar , thimble , pin bolster , spectrum skewer collection , fabric glue , elite collapsible wardrobe , costume flag , button pressing tool , punch needle , bobbin winder ring , sew and knit gauge , choker resonator , fiber to fabric tools , sewing clamps total quantity : 610...

Arcelor Mittal Nippon Steel India Limited - Gujarat

40600778 tender for mechanical work for smp 1 project 1 27018883 10 10 10 erection of structure 45 to email : harit.mehta@amns.in contact : name : harit mehta item details : job description: • clearing site and preparation for erection. • shifting the material from stores, to and from sand blasting yard, loading and unloading of the material, cutting to size, edge pr eparation, leak proof welding. • complete erection as per the drawing. in case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor, site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • visual preparation, by finishing, grinding extra material, dimensional inspection and report preparation. • proper leveling <(>&<)> alignment to be done. tolerances of more than ±5 mm for level <(>&<)> ±1mm for horizontal <(>&<)> lateral alignment are not allowed. • visual inspection, dimensional inspection and erection inspection report sign up • shifting the final product remains to stores or location as per the requirement. scope: • welding machine, cutting set, all tools tackles, jigs and fixtures, pressure testing equipment, measurement equipment will be in the scope of contractor. • all consumables like but not limited to welding rod, gas for cutting grinding wheel will be in the scope of contractor. • contractor shall provide all services inclusive of all equipment (hydra, crane, trailer, man lifter etc.), tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. • use e 7018 welding electrodes for all welding jobs. • scaffolding services/safety net are in contractor’s scope. • contractor should deploy required amount of skilled manpower to finish the job within the stipulated timeline. contractor should provide manpower deployment schedule. • contractor shall complete the job as per the approved specifications, drawings, and as per the direction <(>&<)> satisfaction of amns engineer in charge. • contractor shall ensure for housekeeping/cleaning of the area including cleaning /removing the debris/scrap/waste and used material and shifting the same/surplus materials to the location specified or shown by the engineer, area in charge. bill certification will be only done after complete housekeeping. • contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all required ppe’s (personal protective equipment). • contractor shall ensure that all the tools and tackles deployed are certified by competent authority for use in factory. certificate should be duly valid at all points of time. • hse requirement contractor shall comply with the health, safety and environment policy as laid down by amns steel limited. • penalty will be applicable for violating safety norms as per amns policy. • penalty will be applicable for not completing the job as per the 2 27018883 20 20 10 truss fabrication 35 to 20 truss erection 35 to email : harit.mehta@amns.in contact : name : harit mehta item details : scope of work for truss fabrication job description: • clearing site and preparation for fabrication. • shifting the material from stores, to and from sand blasting yard, loading and unloading of the material, cutting to size, edge pr eparation, welding. • complete fabrication as per the drawing. • visual preparation, by finishing, grinding extra material, dimensional inspection and report preparation. • visual inspection, dimensional inspection and inspection report signup of the material to be done before final shifting to sand blasting yard <(>&<)> from sand blasting yard to site/temporary storage area. • shifting material from temporary storage area to erection site. scope: • amns will provide material required for the fabrication like plate, sheet, i beam channel. • welding machine, cutting set, all tools tackles, jigs and fixtures, pressure testing equipment, measurement equipment will be in the scope of contractor. • all consumables like but not limited to welding rod, gas for cutting grinding wheel will be in the scope of contractor. • contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. • use e 7018 welding electrodes for all welding jobs. • 10% radiography of the finished product is in the scope of contractor. • dimensional tolerances (including bending, twisting, skewing, wave tolerances) of more than ±1 mm are not allowed for structure fa brication. scope of work for truss erection job description: • clearing site and preparation for erection. • shifting the material from stores, to and from sand blasting yard, loading and unloading of the material, cutting to size, edge pr eparation, leak proof welding. • complete erection as per the drawing. in case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor, site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • visual preparation, by finishing, grinding extra material, dimensional inspection and report preparation. • proper leveling <(>&<)> alignment to be done. 5 mm level, 1mm horizontal <(>&<)> lateral alignment. • visual inspection, dimensional inspection and erection inspection report sign up • shifting the final product remains to stores or location as per the requirement. scope: • welding machine, cutting set, all tools tackles, jigs and fixtures, pressure testing equipment, measurement equipment will be in the scope of contractor. • all consumables like but not limited to welding rod, gas for cutting grinding wheel will be in the scope of contractor. • contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. • use e 7018 welding electrodes for all welding jobs. scope of work for sandblasting <(>&<)> painting • clearing site and preparation for sandblasting and painting. • shifting the material from stores, to and from sand blasting yard, loading and unloading of the material. • complete sandblasting and painting as per the specifications. after sandblasting one coat of primer <(>&<)> 2 coats of paint to be applied. • inspection will be done and certification of the proper sandblasting to be signed by amns. painting /primer application shall be only started after the sand blasting certification signed by amns. • inspection will be done and certification of the proper painting/ primer application to be signed by amns. painting /shifting the material shall be only started after the sand blasting certification signed by amns. • shifting the final product /paint remains to stores or location as per the requirement. • amns will provide required amount of paint, thinner, primer. • all equipment like compressor, painting gun, hoses and sand blasting equipment, all tools tackle for lifting and shifting, packing, support, jigs and fixtures, measurement equipment will be in the scope of contractor. • all consumables like but not limited to copper slag, diesel, oil or anything other than (paint, thinner or primer) will be in the scope of contractor. • contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. scope of work for scaffolding services • clearing site and preparation for scaffolding. and handing over site after removal of the scaffolding completely clean. • shifting the material from stores, loading and unloading of the material. • complete scaffolding as per the amns instruction manual and will be considered complete after certification from the scaffolding c ertification engineer. • both side open margin of 500mm will be maintained on all pipes. • contractor should strictly adhere to the scaffolding standard laid by am/ns india. • contractor shall provide pipes and clamps, safety net, rope, aluminum ladders and all material required for making scaffolding. special scope of work for contractor (applicable for all fabrication, erection, dismantling, sheeting, commissioning etc. jobs) • am/ns india will provide plate/sheet, rolled section, fasteners required for fabrication <(>&<)> erection of various items. • primer, paint <(>&<)> thinners will be supplied by am/ns india. • all types of cranes, hydra, trailer, man lifter, (lifting <(>&<)> shifting equipment) are in contractor’s scope. • all equipment deployed must in be new condition and strictly adhere to guidelines suggested by am/ns india. farana f 15 or higher version of hydra must be deployed. • scaffolding services/safety net are in contractor’s scope. • sand blasting <(>&<)> painting is in contractor’s scope. • alignment <(>&<)> leveling is in contractor’s scope. • tolerances of more than ±5 mm for level <(>&<)> ±1mm for horizontal <(>&<)> lateral alignment are not allowed. • material lifting and shifting is in contractor’s scope. • re welding of weld joints to be done if required after inspection. • job quantity will be decided by the department/site in charge. • contractor shall furnish details of subcontractors hired for fabrication, erection, laser cutting, and other manufacturing processes. • contractor shall furnish details of vendors from which the equipment (crane, trailer etc.) is hired for various job. • contractor should provide equipment deployment schedule. • contractor should deploy required amount of skilled manpower to finish the job within the stipulated timeline. contractor should provide manpower deployment schedule. • contractor shall complete the job as per the approved specifications, 3 27018883 30 30 10 grating & beam dismantling 15 to email : harit.mehta@amns.in contact : name : harit mehta item details : job description: • canopy grating, supporting beams to be removed from furnace 1,2 <(>&<)> 3 canopy entry hood. • dismantling job to be carried out as per the shutdown schedule of smp 1 furnace. scope of work: • all tools, tackles, equipment/machines will be in the scope of the contractor. • all consumables like but not limited to welding rod, gas for cutting grinding wheel will be in the scope of contractor. • all types of cranes, hydra, trailer, man lifter, (lifting <(>&<)> shifting equipment) are in contractor’s scope. • scaffolding services/safety net are in contractor’s scope. • material lifting and shifting to required storage area or scrap yard is in contractor’s scope. • installing lifelines (12 mm steel wire rope) <(>&<)> plank boards on the smp 1 shed roof for safe walking is in the contractors scope. • providing safe access and working platforms from the smp 1 rooftop to canopy hood inspection door is in the scope of the contractor. • providing two lifelines (12 mm steel wire rope) inside the canopy hood for workers is in contractor’s scope. • emergency rescue man lifter to be deployed full time for rescuing/ installation safety net etc. the same is in the scope of contractor. • contractor shall complete the job as per the approved specifications, drawings, and as per the direction <(>&<)> satisfaction of amns engineer in charge. • contractor shall ensure for housekeeping/cleaning of the area including cleaning /removing the debris/scrap/waste and used material and shifting the same/surplus materials to the location specified or shown by the engineer, area in charge. bill certification will be only done after complete housekeeping. • contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all required ppe’s (personal protective equipment). • contractor shall ensure that all the tools and tackles deployed are certified by competent authority for use in factory. certificate should be duly valid at all points of time. • hse requirement contractor shall comply with the health, safety and environment policy as laid down by amns steel limited. ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

40523022 tender for 2000142985_inspection of hr/cr/galcoils/slits/sheet 1 2000142985 10 10 10 inspection of hr/cr/galcoils/slits/sheet 1 to 20 inspection of hr/cr/galcoils/slits/sheet 1 to email : kamiya.jogi@amns.in contact : 9879102357 name : jogi, kamiya am/ns india qa/qc (haz) item details : inspection of hot rolled, cold rolled ( crfh <(>&<)> crca ), galvanized coils and sheets / plates at various inspection lines at amns india ltd hazira plant and loading <(>&<)> container stuffing inspection at discharge ports/points. area of work: quality department : crm_dsc_hsm_csp <(>&<)> ports product scope : the scope of work include carrying out online inspection of hr pickled and oiled product, cold rolled ( crca <(>&<)> crfh ) product, galvanized product in coil <(>&<)> sheet form, hot rolled product in coil and sheet/plate form, shot blasted and primer coated plates being produced for export as per sale order requirement and guidelines issued by respective quality in charge / head . scope of work for third party agency : a) review of l/c, proforma invoice, purchase order, work order, sale order, tdc to understand the exact requirement of order. b) scope of quality inspection – · 100% online inspection during production of export material of hrpo, crfh, crca and galvanized coils ( mandatory <(>&<)> non mandatory ) for hrpo, crfh, crca and galvanized sheets : 10% sheets shall be inspected. · 10% online inspection for hr products : coils and sheets / plates ( mandatory <(>&<)> non mandatory ) · 10% online inspection for shot blasted and primer coated sheets / plates ( mandatory <(>&<)> non mandatory ) definition : non mandatory export orders : means product shall be exported but that country or customer does not require third party inspection and certification. how ever to add value to exported product we are getting material inspected and certified by third party. ( you ) following documents to be issued ( for internal records ) : release note loading supervision report review <(>&<)> endorsement of mill test certificate definition : mandatory export orders : means product shall be exported and third party inspection is mandatory either due to importing country rules or third party inspection and certification is required by importing customer all documents as described in non mandatory export orders shall also be covered in mandatory export order. for such orders you shall be required to issue coc ( certificate of conformity ) and / or coi ( certificate of inspection : note : for issuing coc and / or coi separate billing shall be done <(>&<)> is not included in this contract of material inspection. any material suspended for salvaging will be 100% inspected for rectification. c) dimensional check during production as per the relevant specification <(>&<)> sampling as per defined frequency d) verification of coil / packet weight during production and after packing. e) hard punching and sticker pasting as per requirement f) witnessing of tests applicable as per relevant specification, sale order and technical delivery conditions / contractual requirements. g) physical identification of material on labels and shipping marks provided on coils with reference to relevant order. h) inspection of packing and verification shipping marks on material as per relevant documents. i) review of mill test certificates as per sale order and tdc requirement j) order wise issuance of release / discrepancy note for the offered and inspected quantity once the order is completed. k) container stuffing and loading supervision ( vessel / barge ) at plant and / or port : 100% for mandatory order <(>&<)> for non mandatory order as and when required or as required by customer / order requirement l) in case of any customer claim / complaint and in case of proven negligence on the part of the service provider in the inspection of material, the service provider shall inspect the equivalent tonnage of material free of cost in subsequent orders. deputing competent inspectors who will be primarily accessed for competency by amns india qc in charges / hod. at least diploma or graduate with 2 years of relevant experience in hot and cold rolled products shall be required. to suffice the existing scope, minimum 3 persons per shift will be provided by vendor. one on each galvanizing line and one common for other areas <(>&<)> one dedicated person in g shift. calibrated measuring instruments, tools, tackles <(>&<)> all required ppes shall be in service providers scope. it is the sole responsibility of vendor to deploy correct/right set of skilled resources as per competency matrix for all jobs/works being executed by him at various sites of amns hazira complex as indicated in msa document. list of personal protective equipment (ppes) to be used for the job / work : safety helmet – hdpe/ frp spectacle type safety goggles with plain glass disposal type dust/gas mask hand gloves 14 canvas ear muff ear plug chemical resistant pvc suit / apron industrial safety shoes high ankle your person should wear proper ppe at the time of entering shop floor/plant, if any violation found, serious action/penalty shall be imposed. computer / desktop / laptop, report books and other stationary items shall be in the scope of service provider all medical and / or covid testing <(>&<)> use of medical ppes shall be in the scope of service provider transportation and stay arrangement of deputed inspectors shall be in the scope of service provider third party selected for export material online inspection job shall have to recruit persons (inspectors) on their own payroll either on fte (fixed term employment) or ftc (fixed term contract)and shall be required to submit copy of appointment letter of all inspectors to amnsil contracts and user deptartment qaqc movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass item note :...

Municipal Corporation - Gujarat

40366316 annual contract for desilting and cleaning of sewer dranage machine holes of existing drainageline with pawadi of siddarth nagar and other sulm area, society area in sub zone 03 in south zone a (udhana), surat. desilting of garbage, rubbish, clay, silt, grit,sludge, industrial waste and any kind of waste from machine hole of drainage line with help of pawdi and including stacking and disposing of the desilted materials and other waste materials brought from drainage machine holes as directed by the engineer in charge, contractor shall arrange for personal protective equipments for his employees as per guide lines such as helmets, refractive jackets, safety belts, harness, cotton mask set, hand gloves, gum boots, rope,first aid box etc. and taking all necessary precautions and safely measures with safety gears against accident hazards such as test for gases, safety belt, torches etc. contractor shall make proper arrangements for the safety of his employees/ workers as like diversion boards, dander sign boardes, barricading, cones, tapes.etc complete. note: to entering laboursor workers into machine hole(chmber) is strickly prohibited...

Health And Family Welfare Department - Gujarat

40065938 tender document for tablets, injections, miscellaneous and surgical items year 2023 24 (part 2) solution hydrogen peroxide 200 ml,solution povidone iodine 10% 1 litre,solution salbutamol for nebulizer 2.5 mg/3 ml 15 ml,x ray fixture 5 liters,rapid readout biological indicators for rapid read out indicator • rapid readout biological indicators for steam sterilization containing a standardized, viable population of bacillus stearothermophilus spores 10 5 or 10,biological indicator for steam steriliser • self contained vials of spore strip b. stero thermophilus population 10 5 or 10 6 population • easily identifiable color change,biological indicator for eto steriliser • self contained vials of spore strip bacillus atropheus population 10 5 or 10 6 population • easily identifiable color change in ca,enzyme cleaner • multiple enzymatic concentrate solution with lipases, cellulases, proteases and amylases • must act aga,gluteraldehyde monitor • indicator strips to check the minimum effective concentration (1.5%) of 2% glutaraldehyde solution • visual co,chemical indicator tape steam sterilser •1nos=18mm wide x 50 meter length ,self adhesive should be lead free • heat sensitive chemical indicator self adherent tape • should not leave any adhesive residue, for steam sterilization cycles. • unmistakable color change for easy identification after processed in steam autoclaves of different time and temperature requirements, within 15 minutes at 121 degree c and 3 minutes at 134 degree c. •class 1: confirms to ansi/ aami/ iso 11140 1: 2005 • certificate of analysis should be available for every batch,chemical integrator • moving front chemical integrators, indicating accept or reject, to verify all perimeters of steam sterilization together i.e. time, temperature and quality of steam. • can be used for pack control monitoring of all 121 134°c steam sterilization cycles • chemical should be inside a laminate to ensure any chemical transfer from indicator to pack/ instruments should be compliant to bs/ en/ iso 11140 1: 2005,bowie dick test pack • test packs for monitoring vacuum formation in autoclave chambers. • test sheet along with penetration challenge material should be in a single easy handled pack. • should be lead free • weight per pack should be 110 to 125 gms • should be compliant to ansi/aami/iso 11140 1:20051 • should be compliant to ansi/aami/iso 11140 5:20072,bowie dick test pack early warning •consists of chemical indicators on two test sheets positioned inside porous materials and sealed inside a disposable outer wrap. the primary test sheet will turn a uniform dark brown/black color, except when air removal failures such as air leaks occur. • an early warning indicator sheet identifies problems sooner, so the sterilizer may be repaired before it must be taken out of use. this sheet has an indicator dot that turns from yellow to dark brown/black for early detection of air removal failures before they appear on the primary test sheet,packaging material for steam steriliser • heat sealable sterilization packaging material of medical grade paper on one side and laminate of polyester and polypropylene on the other for both steam and eo sterilization. • packaging material should have chemical process indicators for both eto and steam sterilization processes, printed on the paper side to allow the differentiation between processed and unprocessed packages. • for easy computation of length multibar heat sealants with measurements at regular interval incorporated.,non ahldehyde disinfectants for surface cleaning , fogging and fumigation . ph neutral . super oxidized solution along with hypochlorous acid and sodium hypochlorite and other ions .with good stability of at least for 1 year non cytotoxic, steroid free and non irritating bactericidal, virucidal, fungicidal,mycobactericidal,sporicidal,showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus,non ahldehyde disinfectants for surface cleaning , fogging and fumigation . ph neutral . silver nitrate and hydrogen peroxide .with good stability of at least for 1 year non cytotoxic, steroid free and non irritating bactericidal, virucidal, fungicidal,mycobactericidal,sporicidal,showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus,non ahldehyde disinfectants for surface cleaning , fogging and fumigation quaternary ammonium compounds polyhexamethylen biguanide hcl, didecyl dimethyl ammon ium chloride non cytotoxic, steroid free and non irritating bactericidal, virucidal, fungicidal,mycobactericidal,sporicidal,showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus,process challenge device for vacuum steam steriliser • process challenge device (pcd) that contains a 3 hour readout biological indicator plus a steam chemical integrator for fast turnaround times for load releases • class 5 integrator moving front chemical integrators to verify all perimeters of steam sterilization together i.e. time, temperature and quality of steam. read out indicates accept or reject after processing. • rapid bi rapid readout biological indicators for steam sterilization containing a standardized, viable population of bacillus stearothermophilus spores. the indicator detects the presence of viable spores by the production of fluorescence in one to three hours. designed and certified as per iso 11138 and en 866 • should be compliant to aami standards that recommend a bi pcd containing a class 5.,gluteraldehyde • 2% glutraldehyde for disinfection and sterilization purpose • liquid activator with unique anticorrosive property for safety of long term exposed instruments and devices non cytotoxic, steroid free and non irritating.bactericidal, virucidal, fungicidal,mycobactericidal,sporicidal,showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus,gluteraldehyde and opa • 2% glutraldehyde and opa for disinfection and sterilization purpose • liquid activator with unique anticorrosive property for safety of long term exposed instruments and devices.bactericidal, virucidal, fungicidal,mycobactericidal,sporicidal,showing 4 log10 reduction or greater for bacillus subtilis or bacilus atropheus,radiology department x ray film size 12" x 15",x ray film size 10" x 12",x ray film size 8" x 10",liver lock syring 5 ml,lead markers,lead markers,lead markers,lead vinyl radiation protection appron.,x ray developing hanger,x ray developing hanger,x ray developing hanger,lead markers,lead markers,lead markers,fibrin sealant kit contain (thrombin 500 iu and 4 iu) with calcium chloride 1 ml and aprotinin,us fda approved aprotinin free fibrin sealant with tri lumen catheter tip, containing one vial of bac2 (55 85 mg/ml fibrinogen) & thrombin (800 1200 iu/ml human thrombin) frozen solutions,us fda approved aprotinin free fibrin sealant with tri lumen catheter tip, containing one vial of bac2 (55 85 mg/ml fibrinogen) & thrombin (800 1200 iu/ml human thrombin) frozen solutions,dry view laser camera dvb films for kodak cr system,repsules budesonide 0.5mg/2ml,solution 0.01% ionic silver nitrate with surfactant,trisbuffer,menthol and glycerol 100 ml,solution 0.01% ionic silver nitrate with surfactant,trisbuffer,menthol and glycerol 250 ml,soda lime jar 5kg,fusion (nutrition)powder,budecort respule,duolin respule,syp. citralka,vitamine d3 sachet,budacort solution nebulization,pow. neomycine,syp. cefixime,syp.ibugesic plus,syp. augmentine,syp. citralka,syp. iron folic acid,syp. rantac,syp. calcium,syp.peracitamol,syp. moxiclave,syp.mextra.p,syp. acicaine,syp. potrate mb6,syp. refzil o,syp.rantac mp3,syp mulmin,syp. heam up,eye drop.moxi,eye drop c.m.c,vita d3 sachet,bitadine gargle,neb. mucomix,neb duoline plus budecort,eye drop saliwax,eye drop ciplox,bpd 5/%lotion,ointment. thrombophobe,ointment. mupic,ointment. fusiat,ointment. bethamethasone,ointment smily,soda lime jar,gluco meter strips,isoflurone vaporizer 200ml,savlone solutione 1 liter,b.p cuff obese,b.p coff large,b.p cuff pediatric,carboxy methyleye drope,lox 10% spray,xylometazoline nasal drope,spirit,k 3 edta vaccuty purple,plan vaccuty red,sodium citrete 3.2% (blue),sodium fluoride na2edta,digital x ray film size(8 x 10) dry view camera films for carestream cr system size:8"*10" mfg.by carestream,absorbent cotton wool (400 gm) 1 roll,absorbent cotton wool (500 gm) 1 roll,absorbent gauze (20mtr x 90cm) 1 than,adhesive tape (5cm x 10mtr) 6 roll (1 cylinder),adhesive tape (7.5cm x 10mtr) 4 roll 1 cylinder,bandage cloth (20mtr x 90cm) 1 than,bandage plaster of paris (10cm x 2.7mtr) 1 roll,bandage plaster of paris (15cm x 2.7mtr) 1 roll,bain circuit pediatric,bain circuit adult,biological indicator 1292/3 mm,biological chemical intigrator 1243a/3 m,bd spinal needle 22g,closed circuit pediatric,closed circuit adult,crepe bandage pack (10cm x 4mtr) 1 roll,crepe bandage pack (6cm x 4mtr) 1 roll,condom catheter adult,catury wire,disposable urine container 40 ml,eco protect wipes,elastic adhesive bandage (10 cm x 4 mtr.) 1 roll,h.m.e filter,jamshidi done biopsy needle size.(8),jamshidi done biopsy needle size.(9),jamshidi done biopsy needle size.(10),silicon catheter size (14),silicon catheter size (16),silicon catheter size (18),soft cotton roll 4",soft cotton roll 6",soft cotton roll3",spinal drape,,kanee u drape,hip u drape,pft mouthpiece,plaster of paris bandage 7.5 cm x2.7 mtr,plaster of paris bandage 10 cm x2.7 mtr,plaster of paris bandage 15 cm x2.7 mtr,plain plastic sheet,hydrogen peroxide 11% w/v with 0.01% w/v of diluted silver nitrate solution 500 ml,i.v.flow regulator dialflow,disposable diet gloves,disposable diet cap,disposable rubber gloves ( non sterile),disposable rubber gloves ( non sterile),disposable rubber gloves ( non sterile),disposable rubber gloves ( non sterile),disposable rubber gloves ( non sterile),disposable rubber gloves (sterile),disposable rubber gloves (sterile),disposable rubber gloves (sterile),disposable rubber gloves (sterile),disposable rubber gloves(sterile),disposable sterile plastic gloves,disposable surgical set suction handle with tube (romson vaccue),disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable plastic syringe,disposable hypodermic needle,disposable hypodermic needle,disposable hypodermic needle,disposable hypodermic needle,disposable hypodermic needle,disposable hypodermic needle,disposable hypodermic needle,disposable hypodermic needle,disposable spinal needle sterile,disposable spinal needle sterile,disposable spinal needle sterile,disposable spinal needle sterile,disposable spinal needle sterile,disposable spinal needle sterile,disposable spinal needle sterile,disposable spinal needle sterile,disposable spinal needle sterile,long spinal needle,long spinal needle,long spinal needle,long spinal needle,long spinal needle,long spinal needle,long spinal needle,long spinal needle,disposable i.v. cannula eto sterilised,disposable i.v. cannula eto sterilised,disposable i.v. cannula eto sterilised,disposable i.v. cannula eto sterilised,disposable i.v. cannula eto sterilised,disposable infant feeding tube eto sterilised,disposable infant feeding tube eto sterilised,disposable infant feeding tube eto sterilised,disposable infant feeding tube eto sterilised,disposable infant feeding tube eto sterilised,disposable infant feeding tube eto sterilised,disposable suction catheter,disposable suction catheter,disposable suction catheter,disposable suction catheter,disposable suction catheter,disposable suction catheter,disposable suction catheter,disposable ryles tube eto sterilised,disposable ryles tube eto sterilised,disposable ryles tube eto sterilised,disposable ryles tube eto sterilised,disposable ryles tube eto sterilised,disposable ryles tube eto sterilised,disposable urethral cathater eto sterilised,disposable urethral cathater eto sterilised,disposable urethral cathater eto sterilised,scalp vein set eto sterilised,scalp vein set eto sterilised,scalp vein set eto sterilised,scalp vein set eto sterilised,scalp vein set eto sterilised,scalp vein set eto sterilised,two way foley’s catheter,two way foley’s catheter,two way foley’s catheter,two way foley’s catheter,two way foley’s catheter,two way foley’s catheter,two way foley’s catheter,intra costal drainage tube (icd tube),intra costal drainage tube (icd tube),intra costal drainage tube (icd tube),intra costal drainage tube (icd tube),intra costal drainage tube (icd tube),intra costal drainage tube (icd tube),intra costal drainage tube (icd tube),intra costal drainage tube (icd tube),closed wound suction unit sterilised,closed wound suction unit sterilised,closed wound suction unit sterilised,closed wound suction unit sterilised,closed wound suction unit sterilised,epidural catheter,epidural catheter,epidural catheter,epidural needle with stylet,epidural needle with stylet,epidural needle with stylet,epidural needle with stylet,paediatric epidural set containing epidural needle & catheter,sterile epidural kit containing needle 18 g, catheter & three lateral eyes & luer lock / twist connector,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube with cuff,disposable endotracheal tube without cuff,disposable endotracheal tube without cuff,disposable endotracheal tube without cuff,disposable endotracheal tube without cuff,disposable endotracheal tube without cuff,disposable endotracheal tube without cuff,disposable endotracheal tube without cuff,disposable endotracheal tube without cuff,disposable endotracheal tube without cuff,surgical blade sterile,surgical blade sterile,surgical blade sterile,surgical blade sterile,surgical blade sterile,surgical blade sterile,surgical blade sterile,surgical blade sterile,ecg roll standard size,ecg roll standard size,chest lead,three way stopcocks,extension line with three way stop cock,extension line with three way stop cock,extension line with three way stop cock,disposable shoe cover,disposable surgeon cap non woven,disposable surgeon gown non woven medium size,disposable surgeon gown non woven large size,disposable surgical face mask,n 95 mask,protective goggles ( red / yellow),personal protective equipment kit containing face mask, cap, surgical gown ( non woven), shoe cover, googles,refrigerator temperature thermometer,digital thermometer,room temperature thermometer,weight machine,weight machine,weight machine,reservoir bag,reservoir bag,reservoir bag,reservoir bag,laryngoscope bulb,plastic apron,disposable infusion set (i.v. set),blood administration (b.t.set),disposable knife no.15,adson dissecting forcep toothless,adson dissecting forcep toothless,adson dissecting forcep toothless,adson dissecting forcep toothless,adson dissecting forcep toothless,adson dissecting forcep toothless,adson dissecting forcep toothless,adson dissecting forcep with tooth,adson dissecting forcep with tooth,adson dissecting forcep with tooth,adson dissecting forcep with tooth,adson dissecting forcep with tooth,adson dissecting forcep with tooth,adson dissecting forcep with tooth,allis tissue holding forcep,allis tissue holding forcep,allis tissue holding forcep,allis tissue holding forcep,artery forcep curved,artery forcep curved,artery forcep curved,artery forcep curved,artery forcep curved,artery forcep curved,artery forcep curved,artery forcep curved,artery forcep straight,artery forcep straight,artery forcep straight,artery forcep straight,artery forcep straight,artery forcep straight,artery forcep straight,artery forcep straight,needle holder,needle holder...

Surat Municipal Corporation - Gujarat

38277373 tender for supply personal protective equipment (fire fighting suits) 70 nos part(a) aluminized 07 layer suit with rechargeable torch 20 nos. part(b) fire training suit 03 layer 50nos.(w.3)(through e tendering only check https://smc.nprocure.com)....

Indian Oil Corporation Limited - Gujarat

37543780 annual contract for operation and maintenance of 66 kv switchyard and associated ht equipment at wrpl vadinar. annual contract for operation & maintenance of 66 kv switchyard and associated ht equipment at wrpl vadinar. 2 lightning arrestor : supply of lightning arrestors with insulating base fittings etc. as per specifications: for 60 kv rated voltage ( highest system voltage 72.5 kv ) , 10 ka lightening arrestors 3 isolator : supply of 3 poles, centre post rotating type, offload motarized isolator cum earthing switch with accessories and fittings for outdoor installation as required as per specification: 66kv, 630 a, 31.5 ka for 1 sec, rated short time current 4 supply of all necessary tarrif metering and equipments to be mounted at receiving end of supply in the switchyard and should consist of following: 3 phase outdoor type pts of ratings & ratio as per respective state electricity board guidelines: 66kv / v3 / 110v / v3 / 110v / v3 5 supply of all necessary tarrif metering and equipments to be mounted at receiving end of supply in the switchyard and should consist of following: 1 phase outdoor type cts of ratio and rating as per respective state electricity board guidelines. 6 lightning arrestor : erection, installation, testing & commissioning of lightning arrestors with insulating base, discharge counter, fittings etc. including assembling as required, installation on already made steel structures or fixtures, aligning, levelling, grouting, assembling and fitting of accessories / instruments etc. supplied separately, if any, making of the conductor connection, cables connections as required, earthing, testing, commissioning the same, complete in all respects including consumables, tools / equipments and labour as per specifications, drawings and directions of engineer in charge / site engineer. the supply of earthing strip is not covered in this item.for 60 kv rated voltage ( highest system voltage 72.5 kv ) , 10 ka lightening arrestors 7 isolator : erection, installation, testing & commissioning of centre post rotating type, offload isolator cum earthing switch with accessories and fittings as required, including installation on already made steel structures or fixtures, aligning, assembling and fitting all accessories / instruments etc. supplied separately, if any making connections of outgoing / incoming conductor, cable connection as required, earthing, testing, commissioning the same, complete in all respects including consumables, tools / equipments and labour as per specifications, drawings and directions of engineer in charge / site engineer. the supply of cables and earthing strip are not covered in this item.66kv, 630 a, 31.5 ka for 1 sec, rated short time current 8 erection, installation, testing and commissioning of tariff metering and equipments including connection of cables as per respective state electricity board guidelines.outdoor pt ( 3 phase ) 9 erection, installation, testing and commissioning of tariff metering and equipments including connection of cables as per respective state electricity board guidelines. outdoor cts ( single phase ) 10 strain insulators for 66 kv 11 acsr dog conductors for 66 kv 12 shield wire for 66 kv 13 post insulators for 66 kv 14 connectors for 66 kv 15 galvanised steel structure : supply, fabrication, erection, installation including rcc foundation works of galvanised steel structural works of any type and shape for outdoor switchyard equipments, gantry and column etc. complete in all respects including consumables, tools / equipments and labour as per specifications, drawings and directions of engineer in charge / site engineer. 16 supply & replacement of oti / wti as per direction of engineer in charge. 17 supply & replacement of buchholz relay as per direction of engineer in charge. 18 supply, fixing, installation of breather unit without silicagel suitable for upto 750gm silicagel as per direction of engineer in charge. 19 supply, fixing, installation of breather unit without silicagel suitable for upto 1000gm silicagel as per direction of engineer in charge. 20 supply, fixing, installation of breather unit without silicagel suitable for upto 1500gm silicagel as per direction of engineer in charge. 21 supply & replacement of silica gel in transformers as per direction of engineer in charge. 22 cleaning of cable trenches of depth upto 3 meter and width 1.5 meter of cable galleries, sub stations and other locations etc. the job includes lifting of rcc slabs / chequerred plates, removing of paper waste jute, mud, or any other unwanted materials lying in trenches & dumping these waste materials in the nearest dust bin or as directed by the engineer in charge., keeping back rcc slabs / chequerred plates in positions. all complete with men and materials as per direction of the engineer in charge. 23 cleaning of ht bus panel ( each breaker panel ) . it includes opening of top cover, removal of dust by vaccum cleaning / blower etc. checking & tightening of connections, cleaning of insulator, application of petroleum jelly and boxing up of the bus bars / panels. all cleaning materials such as cotton waste, markin cloth etc. shall be supplied by the contractor. all complete with men, materials and equipments like tools & tackles as per direction and satisfaction of the engineer in charge. 24 cleaning of transformer includes surface cleaning i.e. cleaning of accumulated sticky oil and other dust, oil fins. job includes opening of lt duct & ht terminal box, cleaning of duct and terminal box, tightening of nuts & bolts wherever is required. job to be completed with all men, materials and equipments like tools & tackles as per direction and satisfaction of the engineer in charge. all cleaning materials such as markin cloth, cotton waste etc. shall be supplied by the contractor. 25 cleaning of surface, rust removing of foreign matter, rubbing down thoroughly with emery paper, wire brush, washing with degreasing solvent ( white spirit ) to remove grease etc. and preparation of surface for application of enamel paint by spray painting on bus ducts, transformers / motors / or any other metallic surface with one coat of ready mixed primer and two coats of approved quality / apcolite asian synthetic enamel paint including supply of paint suitable for a temperature of 100 degree celsius. all complete with labour and materials as per directions of the engineer in charge. 26 painting of electrical equipments: cleaning of surface, rust removing of foreign matter, rubbing down thoroughly with emery paper, wire brush, washing with degreasing solvent ( white spirit ) to remove grease etc. and preparation of surface for application of paint by spray painting on electrical equipment / structures / poles or any other metallic surface with two coats of approved brand and manufacturer aluminium paint including supply of paint suitable for a temperature of 100 degree celsius. all complete with labour and materials as per directions of the eic 27 lettering with black japan paint of approved brand and manufacture including supply of all material & labour and transportation etc note : unit of measurement is considered each which is equal to per cm height per letter. 28 re lettering with black japan paint of approved brand and manufacture. note : unit of measurement is considered each which is equal to per cm height per letter. 29 yearlymaintenance visit for maintenance of substation equipment as per detail scope of work and instruction of site engineer and eic. 30 minor breakdown maintenance visit for maintenance of transformer & ngr, curcuit breaker ( vcb & sf6 ) , current transformer, potential transformer, isolator switch, earth switch, lightining arrestor, rtcc panel, battery & charger, protection system as when requiredand as per instruction of eic and site engineer 31 majorbreakdown maintenance visit maintenance of transformer & ngr, curcuit breaker ( vcb & sf6 ) , current transformer, potential transformer, isolator switch, earth switch, lightining arrestor, rtcc panel, battery & charger, protection systemas when required and as per instruction of eic and site engineer 32 supervision charges for 24 hrs monitoring of 66 / 6.6 kv switchyard at wrpl vadinar and related equipments as per detailed scope of work and instruction of eic / site engineer. deployment of required manpower deployment for operation and maintenance of the system on each shift basis for 24 hours shall include 07 no of semi skilled person with wireman license, ( two person in each shift with one reliever on rotary weekly off of other ) , tools and tackles including personal protective equipment for the manpower deployed at site, testing equipment / instruments including supply of all consumables. ( payment of semi skilled manpower will be done on basis of minimum wages which will be revised as applicable and line item of the same will be separate and need not be quoted ) including consideration of15% contractors profit. 33 reimbursements of lump sum annual wage enhancement only as per minimum wage notification, issued by ministry of labour & employment, gov. of india....

Ministry Of Petroleum And Natural Gas - Gujarat

37381641 bids are invited for personal protective equipment safety goggles goggles, chemical splash protection dust mask disposable mask, with exhalation valve hand gloves, kavlar, protect high temperat glove, electrical, 15in suitable f / 33kv flam retardant coverall, singl layr nomex burn dressing, water gel blanket...

Gas Authority Of India Limited - Gujarat

36688706 procurement of personal protective equipment and consumables fire and safety items. , socks, wind size:d:2 ft x l:12 ft thickness: 4 mm,width: 1 ft colour: red and white refer specification of ppes and consumables , fire blanket piece type: non asbestos refer specification of ppes and consumables , barricading tape refer specification of ppes and consumables , ear plugs model:3m,make:1110 rubber cushioned with cord refer specification of ppes and consumables , water jel blanket size: 3ft x 2.5ft refer specification of ppes and consumables , jacket,safety refer specification of ppes and consumables , gloves, hand refer specification of ppes and consumables , hand gloves,pvc polka dotted blue coloured refer specification of ppes and consumables...

Western Railway - Gujarat

35612580 supply of set of industrial personal protectiveset of industrial personal protective, set of industrial personal protective equipments. one set consist of ( 1 ) industrial safety belt and harnesses as per bis specification no is 3521:1999, amds 2 qty / set : 01 no. ( 2 ) supply of luminous vests safety jackets net type as per bis specification i.e. is:15809 2008, type 2, class 3 specified by en471 standard high visibility warning clothes with synthetic side fasteners, fluorescent orange colour qty / set : 01 no. ( size : xxl ) . ( 3 ) industrial safety helmet with lamp, new airwing 8000 vpr qty / set : 01 no. senior section gujarat 30.00 set => limited...

Jamnagar Municipal Corporation - Gujarat

31637277 supply of fire fighter instrument item 1 dry chemical powder 4 kg a.b.c., type stos pressure isi mark fire extinguisher stos pressure type bis 15683 2 water co2 type fire extinguisher 9 litre, isi mark 3 co2 type fire extinguisher 4.5 kg, isi mark 4 chlorine gas detector alarm with battery operated 5 smoke detector alarm with battery operated 6 refilling of following fire extinguishers : 6.1 dry chemical powder 5 kg a.b.c., type stos pressure isi mark 6.2 water co2 type fire extinguisher 9 litre, isi mark 6.3 co2 type fire extinguisher 4.5 kg, isi mark 7 63 mm hose pipe fire red colour ( with coupling, flange and all fittings ) type – a, isi mark “ jamnagar municipal corporation fire & emergency services “ including painting these letters on hose pipe “pyroprotect” / equivalent brand flexible fire fighting delivery hose • three layered synthetic jacketed, with elastomeric outer covering highly resistant to liquids, oils, chemicals, acid, alkalies, solvent, abrasion & heat, • dia. 63mm x 15mtr. length, • working pressure 18kg / cm2, proof pressure 25kg / cm2, burst pressure 42kg / cm2, • bearing is: 636 1988 type b, isi mark, isi marked • kitemark approved • ul listed • gl approved • ce marked • dully fitted with hose coupling made of gunmetal / stainless steel 304, pair of male & female parts, instantaneous pattern, size: 63mm x 63mm, bearing is: 903 isi mark, ss / copper wire binding 7.1 canvas hose pipe – 15 mtr 7.2 canvas hose pipe – 30 mtr 7.3 reinforce rubber line hose pipe – 15 mtr 7.4 reinforce rubber line hose pipe – 30 mtr 7.5 synthetic hose pipe – 15 mtr 7.6 synthetic hose pipe – 30 mtr 8 afff form compound isi mark 20 litre packing 9 personal protective equipment 9.1 gum boot steel toe type 9.2 fireman safety helmet 9.3 safety goggles 9.4 safety gloze 9.5 gloze for the rescue work 9.6 disposable surgical gloze 10 cotton fire retardant, dangari for fireman ( over all ) 11 hand operated search light ( torch light ) 1 km 312 b. a. set air cylinder 300 bar pressure air refilling & maintenance 13 chlorine kit isi 14 rope rescue kit 14.1 1 ton capacity rope ( synthetic fire export quality ) 14.2 full body harness 14.3 half body harness 14.4 kerebina 14.5 figure of eight 14.6 d sender 14.7 a sender 14.8 single pulley and double pulley 14.9 prisek loop 14.1 red sealing and blue sealing 15 breathing apparatus ( b.a. ) set 300 bar pressure – 6 litre 16 breathing apparatus ( b.a. ) set 300 bar pressure – 6.8 litre with composite cylinder...

Jamnagar Municipal Corporation - Gujarat

30559884 supply of fire fighter instrument item 1 dry chemical powder 4 kg a.b.c., type stos pressure isi mark fire extinguisher stos pressure type bis 15683 2 water co2 type fire extinguisher 9 litre, isi mark 3 co2 type fire extinguisher 4.5 kg, isi mark 4 chlorine gas detector alarm with battery operated 5 smoke detector alarm with battery operated 6 refilling of following fire extinguishers : 6.1 dry chemical powder 5 kg a.b.c., type stos pressure isi mark 6.2 water co2 type fire extinguisher 9 litre, isi mark 6.3 co2 type fire extinguisher 4.5 kg, isi mark 7 63 mm hose pipe fire red colour (with coupling, flange and all fittings) type – a, isi mark “ jamnagar municipal corporation fire & emergency services “ including painting these letters on hose pipe “pyroprotect” / equivalent brand flexible fire fighting delivery hose • three layered synthetic jacketed, with elastomeric outer covering highly resistant to liquids, oils, chemicals, acid, alkalies, solvent, abrasion & heat, • dia. 63mm x 15mtr. length, • working pressure 18kg/cm2,proof pressure 25kg/cm2, burst pressure 42kg/cm2, • bearing is: 636 1988 type b, isi mark, isi marked • kitemark approved • ul listed • gl approved • ce marked • dully fitted with hose coupling made of gunmetal / stainless steel 304, pair of male & female parts, instantaneous pattern, size: 63mm x 63mm, bearing is: 903 isi mark, ss / copper wire binding 7.1 canvas hose pipe – 15 mtr 7.2 canvas hose pipe – 30 mtr 7.3 reinforce rubber line hose pipe – 15 mtr 7.4 reinforce rubber line hose pipe – 30 mtr 7.5 synthetic hose pipe – 15 mtr 7.6 synthetic hose pipe – 30 mtr 8 afff form compound isi mark 20 litre packing 9 personal protective equipment 9.1 gum boot steel toe type 9.2 fireman safety helmet 9.3 safety goggles 9.4 safety gloze 9.5 gloze for the rescue work 9.6 disposable surgical gloze 10 cotton fire retardant, dangari for fireman (over all) 11 hand operated search light (torch light) 1 km 12 b. a. set air cylinder 300 bar pressure air refilling & maintenance 13 chlorine kit isi 14 rope rescue kit 14.1 1 ton capacity rope (synthetic fire export quality) 14.2 full body harness 14.3 half body harness 14.4 kerebina 14.5 figure of eight 14.6 d sender 14.7 a sender 14.8 single pulley and double pulley 14.9 prisek loop 14.1 red sealing and blue sealing 15 breathing apparatus (b.a.) set 300 bar pressure – 6 litre 16 breathing apparatus (b.a.) set 300 bar pressure – 6.8 litre with composite cylinder...

Directorate Of Employment And Training - Gujarat

29520455 bids are invited for bobbin and bobbin case, , ( 1 ) original bobbin with yokealuminium suitable for all types of full shuttle highspeed sewing machine, ( 2 ) original bobbin case for allautometic, industrial sewing machine with premiumquality of steel. , scissor carbon stainless steel, 10 inches in length, has golden shears specification: fabric cutting made of high , computer and computer peripherals 2tb ssd, 8gb ram, led screen 17, i7 processor, 4gb graphics card, with bluetooth & wi fi connectivity , cutting table size: 2400x1200x800 mmmade from: ms square pipe 50x50 mm structuretop having 25 mm black board with 1 padded from for pressing cloth , design patterns template standard design pattern templates , different type of sewing machine needles packof needle number of 11, 14, 16, 18 pins, high qualitysteel, for automatic sewing machine. , dress form 1. male size 10 adams mannequins dressform 2. female dffo3g size 8 , collapsible shouldersand a sturdy metal construction with four leggedwheeled stand, increase and decreased theheight, internal material :fibredress form half without hand adjust theheight of the dress form by pushing the footpedal on the bottom of the base with casterwheelsurface pin able forminside body material fibre glass out side material 4 mm thick cloth , dress makers pin nickel plated pin, with ballpoint head, prym size 20 straight pins steel dressmakers stainless steelpackaging type: boxsize: 1 inch , first aid box first aid box approx size:300x150x150mm unbreakable plastic box hook for hanging, scissor 10 cm, 100 ml dettol, 100ml tincture iodine & benzoin, cotton 250 gm, cotton tap, cottonbendeade tap 500 metre long, burnol tub 200 gram locking arrangement and lifting handle is provided. first aid leaflet issued by director journal of factories and instruction book is provided.applicationsuitable up to 50 students. , booklet garment, made ups and home furnishing sample , machine folders with attachments ( 1 ) a10 rightangle bias binder ( single needle lock stitch machine ) ( 2 ) a11 / s72l swing hemmer folder / binder, ( 3 ) f521piping folder, ( 4 ) f514 tape attaching folder ( multineedle & flat lock machine, ( 5 ) f219 sleeve placketfolder ( snlm ) , ( 6 ) f342 loop folder, ( 7 ) f211 shouldertop stitch attachment, ( 8 ) f224 cuff setter , needle threader, automatic plastic needlethreader, thread guide, multi colour cucurbit headwire loop, approx size: 2cm*6cm , paper scissors for paper cutting madeof high carbon stainless steel, 8 in length, with plastichandle , personal protective equipment, i.e; rubber mate forroom, sewing machine paddle mat kept fitted withpaddle so that not take any electric sock, metal glovesfor cutter man, needle guard etc. , pin cushion cute ball shaped diy craft needle pincushion holder sewing kit, carry on finger or wrist , pins and safety pins , it’s a stainless steel pins coverhead with perl or rubber.dimension:5*5*5cm;250grams, pack of 120 assorted colours perl headpins, perfect for hand sewing diy craft and fashiondesigning and pattern making. , printer function:print, scan, copyresolution:600x600dpi, 2400 dpi qualityprint speed:up to 18 / 19ppm ( a4 / ltr ) leser system, 4gb graphics card, with bluetooth & wi fi inability , required trims / accessory, ( raw material ) thosematerials that are used in a garment other than mainfabric i.e;ribbon, ruffels, laces, chains , buttons, studs, fasteners etc. , scale , plastic or steel scales 12 metric scales 30 cms long with offset scales. , seam ripper 8 stainless stills with generic plasticthread cutter, seam ripper, stitch unpacker sewing toolcover with transparent plastic , sewing machine accessories and attachments zipper foot, cording foot, narrow hemmer foot, genericbias binder foot tape size 28 mm for industrial sewingmachine , specialised industrial sewing machines single niddle lock stich industrial modellight to medium fabric hookmax speed: 4500 spmstitch length: 5 mmmax pressure foot lift ( mm ) 5.5 / 13 mmmotor type: clutchwith suitable steel standapplication: heavy fabric hook 2.large max3mechanism, 3. 4500spm speed 4. max.stitch length 8mm 5. max pressure foot lift ( mm ) 6 / 13, 6. clutch motorwith 250watt , students sewing stools wooden stool specification: 1 x 1 x 2.5ft , teachers tablerevolving chair with arm chaird x w x h 450 mm 400 mm 460 padded with polyurethane foammaterial of fabric: polyestersteel tablesize: 4x2.5x2.5 ( lwh ) table top material and thickness 18 / 20 mm thick prelaminated mdf board. storage 1 side ( 3 storage ) 0.6 mm m s sheetpedestal: mild steel square section of outside side minimum 25 mm and wall thickness minimum 1.2 mm , thimble finger thimble sewing grip metal shield pinneedle protector , thread clipper 8 stainless stills with generic plasticthread cutter , threads for sewing polyester 300 metres, multicolour thread rill box , ( raw material ) spun , tracing wheel a pattern wheel or known as dart wheelis an instrument with multiple teeth on a wheel attachedto a handle, used to transfer the marking from patternon fabric. , trimmers it’s a 4 steel blade thread cutter, withcoloured handle , projector technology lcd, native resolution 1024 x768 ( xga ) brightness ( lumens ) 2800 optical zoom yesstandard throw ( 0.91 to 2.5 ) type of light source uhp / uhe / uhmminimum life of light source ( in normal mode ) hours 5000 total quantity : 1...

Prime Ministers Office - Gujarat

29428185 bids are invited for 3m™ half face piece reusable respirator 6300 / 6200 / similar ( 03 size large & 02 medium ) , personal protective equipment’s ( ppe ) tyvek / similar suits with hoods , safety googles 3m , latex / nitrile gloves ( one box or 50 pieces ) 3m™ , plastic shoes covers ( 50 pairs:100 pieces ) , whatman filter papers grade1 ( one box : 100 pieces ) , borosilicate glass bottle with screw cap & measuring scale 1000 ml ( color: transparent ) , all purpose wide mouth funnel ( plastics / glass ) 2 / 3 inch in diameter , syringe large plastic 100 ml / cc syringe to suck the liquid total quantity : 1...

Directorate Of Employment And Training - Gujarat

28950340 bids are invited for boq total quantity : 1 1 all types of branches or nozzles * 63 mm 4 no. 2 all types of couplings * 63mm 1 set 3 hydrant stand pipe type * 63mm 2 no. 4 metal strainer * size: 75 mm material : gunmetal / stainless steel as per is : 907 weight : 3.0 kg 2 no. 5 basket strainer * material ms size / dimension dn 100 brand bew application industrial pipe for fire thickness ( mm ) 13 mm approx 1 no. 6 ear plug application noise reduction color orange material pu packaging unit 50 pcs pin type 2 pin length 10 20 mm snr 25 35 db 10 set 7 canal caps size : standard, weighing less then 500 gms., it has a concealed handle with good grip to protect the hand and reduce welders fatigue for industrial use, provided with with black glass personal protective equipment, made in india color may vary 10 no. 8 cooling vest m, l, xl, xxlas a req 10 no. 9 safety shirt comfortable to wear skin friendly quality approved m, l, xl, xxl as a req 10 no. 10 safety trouser m, l, xl, xxlas a req 10 no. 11 collecting breeching * 63 mm 2 no. 12 dividing breeching ( hand control ) * c34 2 no. 13 hydrant flange * 4 1 / 2 and 5 1 / 4 inch 2 no. 14 hydrant key & bar ( with hydrant spindle ) * 1010 x 460mm 1 no. 15 adopter for air store pressure 11cm / 4, 3 2 no. 16 sprinklers head ( bulb type, fusible type ) * working pressure 12 bar material ; brass 2 no. 17 fire suit proximity suit type 3 layer material outer layer made from 430 gsm, commercial aluminized grade am and middle layer vapor barrier and 3 inner most layer flame retardant cotton. size universal color silvery white weight 8 to 10 kg. features it consist of ( 1 ) one piece coverall ( 2 ) hood with visor ( 3 ) a pair of five finger gloves & shoes with neoprene sole. it is commercial quality. factory packing 01 set approval aluminized fabric is certified by en iso 11612...

Western Railway - Gujarat

28651209 supply of ppeppe,set of industrial personal protective equipments. one set consist of (1) industrial safety belt andharnesses as per bis specification no is 3521:1999, amds 2 qty/set : 01 no. (2) supply of luminous vestssafety jackets net type as per bis specification i.e. is:15809 2008,type 2, class 3 specified by en471standard high visibility warning clothes with synthetic side fasteners, fluorescent orange colour qty/set : 01no.( size : xxl). (3) industrial safety helmet with lamp, new airwing 8000 vpr qty/set : 01 no.senior section gujarat 30.00 set...