Bids Are Invited For Mandap With Zool-1 Day , Mandap With Zool-2 Day , Mandap Without Zool-1 Day , Mandap Without Zool2 Day , Mandap Without Zool-3 Day , Mandap Without Zool-30 To 45 Day , Mandap Side Wall 6 Ft Height-1 Day , Mandap Side Wall 6 Ft Height-2 Day , Mandap Side Wall 6 Ft Height-3 Day , Mandap Side Wall 6 Ft Height-30 To 45 Day , Mandap Side Wall 10 Ft Height-1 Day , Mandap Side Wall 10 Ft Height-2 Day , Temporary Wooden Ramp-1 Day , 100 Mtr Boundry With Lime , Stage And Stair With Carpet-1 Day , Stage And Stair With Carpet-2 Day , Stage And Stair With Carpet-30 To 45 Day , Stage Backdrop-1 Day , Red Carpet-1 Day , Green Flooring-1 Day , Green Flooring-2 Day , Green Flooring-3 Day , Green Flooring-30 To 45 Day , Rajai-1 Day , Chadar-1 Day , Shetranji-1 Day , Gadla-1 Day , Gadla-2 Day , Gadla-3 Day , Gadla-30 To 45 Day , Oshiku-1 Day , Decorative Entry Gate-1 Day , Decoration With Artifical Flower-1 Day , Wooden Barricating-1 Day , Wooden Barricating-2 Day , Wooden Barricating-30 To 45 Day , Barricating Of Iron Pipe-1 Day , Barricating Of Iron Pipe-2 Day , Barricating Of Iron Pipe-30 To 45 Day , Pvc Plastic Chair-1 Day , Pvc Plastic Chair-2 Day , Pvc Plastic Chair-3 Day , Pvc Plastic Chair-30 To 45 Day , Kushan Chair-1 Day , Kushan Chair-2 Day , Kushan Chair-30 To 45 Day , Revolving Chair-1 Day , Revolving Chair-2 Day , Revolving Chair-30 To 45 Day , Tipoi-1 Day , Tipoi-30 To 45 Day , Table 3 By 2 Without Cloth-1 Day , Table 3 By 2 Without Cloth-30 To 45 Day , Table 3 By 2 With Cloth-1 Day , Table 3 By 2 With Cloth-30 To 45 Day , Table 4 By 2 Without Cloth-1 Day , Table 4 By 2 Without Cloth-30 To 45 Day , Table 4 By 2 With Cloth-1 Day , Table 4 By 2 With Cloth-2 Day , Table 4 By 2 With Cloth-3 Day , Table 4 By 2 With Cloth-30 To 45 Day , Sofa 1 Seater-1 Day , Sofa 1 Seater-30 To 45 Day , Sofa 2 Seater-1 Day , Sofa 2 Seater-30 To 45 Day , Sofa 3 Seater-1 Day , Sofa 3 Seater-2 Day , Sofa 3 Seater-30 To 45 Day , Wooden Partition-1 Day , Wooden Partition-30 To 45 Day , Galvanized Sheet Partition-1 Day , Galvanized Sheet Partition-30 To 45 Day , Galvanized Iron Mesh-1 Day , Galvanized Iron Mesh-30 To 45 Day , Water Glass Steel-1 Day , Water Glass Steel-2 Day , Water Glass Steel-30 To 45 Day , Water Jug 20 Ltr-1 Day , Water Jug 20 Ltr-30 To 45 Day , Tent-1 Day , Tent-30 To 45 Day , Drinking Water Tanker-1 Day , Led Tubelight 22 Watt-1 Day , Led Tubelight 22 Watt-2 Day , Led Tubelight 22 Watt-30 To 45 Day , Flood Light 100 Watt-1 Day , Flood Light 100 Watt-2 Day , Flood Light 100 Watt-3 Day , Flood Light 100 Watt-30 To 45 Day , Halogen 500 Watt-1 Day , Halogen 500 Watt-2 Day , Halogen 500 Watt-30 To 45 Day , Halogen 1000 Watt-1 Day , Halogen 1000 Watt-2 Day , Halogen 1000 Watt-30 To 45 Day , Heavy Sound System-1 Day , Heavy Sound System-2 Day , Heavy Sound System-3 Day , Heavy Sound System-30 To 45 Day , Simple Sound System-1 Day , Simple Sound System-2 Day , Simple Sound System-30 To 45 Day , Extra Speaker-1000 Watt-1 Day , Extra Speaker-1000 Watt-2 Day , Extra Speaker-1000 Watt-30 To 45 Day , Extra Amplifier 50 Watt-1 Day , Extra Amplifier 50 Watt-30 To 45 Day , Extra Cordless Microphone-1 Day , Extra Cordless Microphone-2 Day , Extra Cordless Microphone-30 To 45 Day , Extra Collarbutton Mike-1 Day , Microphone-1 Day , Extra Cabinet Speaker-1 Day , Pedal Stand Fan-1 Day , Pedal Stand Fan-2 Day , Pedal Stand Fan-3 Day , Pedal Stand Fan-30 To 45 Day , Ceiling Fan-1 Day , Ceiling Fan-2 Day , Ceiling Fan-30 To 45 Day , Heavy Duty Air Circulator-1 Day , Heavy Duty Air Circulator-2 Day , Heavy Duty Air Circulator-30 To 45 Day , Temporary Plug Point 15Amp-1 Day , Temporary Plug Point 15Amp-2 Day , Temporary Plug Point 15Amp-3 Day , Temporary Plug Point 15Amp-30 To 45 Day , Distribution Board Three Phase 440 Watt 4-6 Way-1 Day , Distribution Board Three Phase 440 Watt 4-6 Way-2 Day , Distribution Board Three Phase 440 Watt 4-6 Way-30 To 45 Day , Distribution Board Three Phase 440 Watt 8-12 Way-1 Day , Distribution Board Three Phase 440 Watt 8-12 Way-2 Day , Distribution Board Three Phase 440 Watt 8-12 Way-30 To 45 Day , Generator Set 125 Kva1 Day , Generator Set 125 Kva-2 Day , Generator Set 125 Kva-30 To 45 Day , Generator Set 250 Kva-1 Day , Generator Set 250 Kva-2 Day , Generator Set 250 Kva-30 To 45 Day , Pillar For The Light 12 To 15 Feet Height-1 Day , Pillar For The Light 12 To 15 Feet Height-2 Day , Pillar For The Light 12 To 15 Feet Height-30 To 45 Day , Dp Switch 16-32 Ampere-1 Day , Dp Switch 16-32 Ampere-2 Day , Dp Switch 16-32 Ampere-30 To 45 Day , Tp Switch 16-32 Ampere-1 Day , Tp Switch 16-32 Ampere-2 Day , Tp Switch 16-32 Ampere-30 To 45 Day , Tp Switch 63-200 Ampere-1 Day , Tp Switch 63-200 Ampere-2 Day , Tp Switch 63-200 Ampere-30 To 45 Day , Busbar 63 To 100 Ampere Till 1 Mtr-1 Day , Busbar 63 To 100 Ampere Till 1 Mtr-30 To 45 Day , Busbar 200 Ampere Till 1 Mtr-1 Day , Busbar 200 Ampere Till 1 Mtr-2 Day , Busbar 200 Ampere Till 1 Mtr-30 To 45 Day , Change Over Switch 4 Poll 63 1 Mtr-30 To 45 Day , Change Over Switch 4 Poll 63 Ampere-1 Day , Change Over Switch 4 Poll 63 Ampere30 To 45 Day , Change Over Switch 4 Poll 100-125 Ampere-1 Day , Change Over Switch 4 Poll 100-125 Ampere-2 Day , Change Over Switch 4 Poll 100-125 Ampere-30 To 45 Day , Change Over Switch 4 Poll 200-300 Ampere-1 Day , Change Over Switch 4 Poll 200-300 Ampere-2 Day , Change Over Switch 4 Poll 200-300 Ampere-30 To 45 Day , Section Peeler 75 By 60 By 45-1 Day , Section Peeler 75 By 60 By 45-2 Day , Section Peeler 75 By 60 By 45-30 To 45 Day , Section Peeler 60 By 30 By 45-1 Day , Section Peeler 60 By 30 By 45-2 Day , Section Peeler 60 By 30 By 45-30 To 45 Day , Elcb Switch Single Phase 40 Ampere Dp-1 Day , Elcb Switch Single Phase 40 Ampere Dp-2 Day , Elcb Switch Single Phase 40 Ampere Dp-30 To 45 Day , Elcb Switch Single Phase 63 Ampere Dp-1 Day , Elcb Switch Single Phase 63 Ampere Dp-30 To 45 Day , Elcb Switch Three Phase 40 Ampere 4 Poll-1 Day , Elcb Switch Three Phase 40 Ampere 4 Poll-30 To 45 Day , Elcb Switch Three Phase 63 Ampere 4 Poll-1 Day , Elcb Switch Three Phase 63 Ampere 4 Poll-2 Day , Elcb Switch Three Phase 63 Ampere 4 Poll-30 To 45 Day , Elcb Switch Three Phase 100 Ampere 4 Poll-1 Day , Elcb Switch Three Phase 100 Ampere 4 Poll-30 To 45 Day , 3.5 Kv Ups 4 Hour Backup-1 Day , 3.5 Kv Ups 4 Hour Backup-2 Day , 3.5 Kv Ups 4 Hour Backup-30 To 45 Day , Split Ac 1.5 Ton-1 Day , Split Ac 1.5 Ton-2 Day , Split Ac 1.5 Ton-30 To 45 Day , Split Ac 2.5 Ton-1 Day , Split Ac 2.5 Ton-30 To 45 Day , Tower Ac 2 Ton-1 Day , Tower Ac 2 Ton-30 To 45 Day , Tower Ac 4 Ton-1 Day , Tower Ac 4 Ton-2 Day , Tower Ac 4 Ton-3 Day , Tower Ac 4 Ton-30 To 45 Day , Ductoable Ac Unit 5 To 6 Ton-1 Day , Ductoable Ac Unit 7 To 10 Ton-1 Day , Toilet Chemical-1 Day , Toilet General-1 Day Total Quantity : 1515804

Tender Notice

42698418

Revenue Department

Indian


Gujarat

March 07, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Bids Are Invited For Mandap With Zool-1 Day , Mandap With Zool-2 Day , Mandap Without Zool-1 Day , Mandap Without Zool2 Day , Mandap Without Zool-3 Day , Mandap Without Zool-30 To 45 Day , Mandap Side Wall 6 Ft Height-1 Day , Mandap Side Wall 6 Ft Height-2 Day , Mandap Side Wall 6 Ft Height-3 Day , Mandap Side Wall 6 Ft Height-30 To 45 Day , Mandap Side Wall 10 Ft Height-1 Day , Mandap Side Wall 10 Ft Height-2 Day , Temporary Wooden Ramp-1 Day , 100 Mtr Boundry With Lime , Stage And Stair With Carpet-1 Day , Stage And Stair With Carpet-2 Day , Stage And Stair With Carpet-30 To 45 Day , Stage Backdrop-1 Day , Red Carpet-1 Day , Green Flooring-1 Day , Green Flooring-2 Day , Green Flooring-3 Day , Green Flooring-30 To 45 Day , Rajai-1 Day , Chadar-1 Day , Shetranji-1 Day , Gadla-1 Day , Gadla-2 Day , Gadla-3 Day , Gadla-30 To 45 Day , Oshiku-1 Day , Decorative Entry Gate-1 Day , Decoration With Artifical Flower-1 Day , Wooden Barricating-1 Day , Wooden Barricating-2 Day , Wooden Barricating-30 To 45 Day , Barricating Of Iron Pipe-1 Day , Barricating Of Iron Pipe-2 Day , Barricating Of Iron Pipe-30 To 45 Day , Pvc Plastic Chair-1 Day , Pvc Plastic Chair-2 Day , Pvc Plastic Chair-3 Day , Pvc Plastic Chair-30 To 45 Day , Kushan Chair-1 Day , Kushan Chair-2 Day , Kushan Chair-30 To 45 Day , Revolving Chair-1 Day , Revolving Chair-2 Day , Revolving Chair-30 To 45 Day , Tipoi-1 Day , Tipoi-30 To 45 Day , Table 3 By 2 Without Cloth-1 Day , Table 3 By 2 Without Cloth-30 To 45 Day , Table 3 By 2 With Cloth-1 Day , Table 3 By 2 With Cloth-30 To 45 Day , Table 4 By 2 Without Cloth-1 Day , Table 4 By 2 Without Cloth-30 To 45 Day , Table 4 By 2 With Cloth-1 Day , Table 4 By 2 With Cloth-2 Day , Table 4 By 2 With Cloth-3 Day , Table 4 By 2 With Cloth-30 To 45 Day , Sofa 1 Seater-1 Day , Sofa 1 Seater-30 To 45 Day , Sofa 2 Seater-1 Day , Sofa 2 Seater-30 To 45 Day , Sofa 3 Seater-1 Day , Sofa 3 Seater-2 Day , Sofa 3 Seater-30 To 45 Day , Wooden Partition-1 Day , Wooden Partition-30 To 45 Day , Galvanized Sheet Partition-1 Day , Galvanized Sheet Partition-30 To 45 Day , Galvanized Iron Mesh-1 Day , Galvanized Iron Mesh-30 To 45 Day , Water Glass Steel-1 Day , Water Glass Steel-2 Day , Water Glass Steel-30 To 45 Day , Water Jug 20 Ltr-1 Day , Water Jug 20 Ltr-30 To 45 Day , Tent-1 Day , Tent-30 To 45 Day , Drinking Water Tanker-1 Day , Led Tubelight 22 Watt-1 Day , Led Tubelight 22 Watt-2 Day , Led Tubelight 22 Watt-30 To 45 Day , Flood Light 100 Watt-1 Day , Flood Light 100 Watt-2 Day , Flood Light 100 Watt-3 Day , Flood Light 100 Watt-30 To 45 Day , Halogen 500 Watt-1 Day , Halogen 500 Watt-2 Day , Halogen 500 Watt-30 To 45 Day , Halogen 1000 Watt-1 Day , Halogen 1000 Watt-2 Day , Halogen 1000 Watt-30 To 45 Day , Heavy Sound System-1 Day , Heavy Sound System-2 Day , Heavy Sound System-3 Day , Heavy Sound System-30 To 45 Day , Simple Sound System-1 Day , Simple Sound System-2 Day , Simple Sound System-30 To 45 Day , Extra Speaker-1000 Watt-1 Day , Extra Speaker-1000 Watt-2 Day , Extra Speaker-1000 Watt-30 To 45 Day , Extra Amplifier 50 Watt-1 Day , Extra Amplifier 50 Watt-30 To 45 Day , Extra Cordless Microphone-1 Day , Extra Cordless Microphone-2 Day , Extra Cordless Microphone-30 To 45 Day , Extra Collarbutton Mike-1 Day , Microphone-1 Day , Extra Cabinet Speaker-1 Day , Pedal Stand Fan-1 Day , Pedal Stand Fan-2 Day , Pedal Stand Fan-3 Day , Pedal Stand Fan-30 To 45 Day , Ceiling Fan-1 Day , Ceiling Fan-2 Day , Ceiling Fan-30 To 45 Day , Heavy Duty Air Circulator-1 Day , Heavy Duty Air Circulator-2 Day , Heavy Duty Air Circulator-30 To 45 Day , Temporary Plug Point 15Amp-1 Day , Temporary Plug Point 15Amp-2 Day , Temporary Plug Point 15Amp-3 Day , Temporary Plug Point 15Amp-30 To 45 Day , Distribution Board Three Phase 440 Watt 4-6 Way-1 Day , Distribution Board Three Phase 440 Watt 4-6 Way-2 Day , Distribution Board Three Phase 440 Watt 4-6 Way-30 To 45 Day , Distribution Board Three Phase 440 Watt 8-12 Way-1 Day , Distribution Board Three Phase 440 Watt 8-12 Way-2 Day , Distribution Board Three Phase 440 Watt 8-12 Way-30 To 45 Day , Generator Set 125 Kva1 Day , Generator Set 125 Kva-2 Day , Generator Set 125 Kva-30 To 45 Day , Generator Set 250 Kva-1 Day , Generator Set 250 Kva-2 Day , Generator Set 250 Kva-30 To 45 Day , Pillar For The Light 12 To 15 Feet Height-1 Day , Pillar For The Light 12 To 15 Feet Height-2 Day , Pillar For The Light 12 To 15 Feet Height-30 To 45 Day , Dp Switch 16-32 Ampere-1 Day , Dp Switch 16-32 Ampere-2 Day , Dp Switch 16-32 Ampere-30 To 45 Day , Tp Switch 16-32 Ampere-1 Day , Tp Switch 16-32 Ampere-2 Day , Tp Switch 16-32 Ampere-30 To 45 Day , Tp Switch 63-200 Ampere-1 Day , Tp Switch 63-200 Ampere-2 Day , Tp Switch 63-200 Ampere-30 To 45 Day , Busbar 63 To 100 Ampere Till 1 Mtr-1 Day , Busbar 63 To 100 Ampere Till 1 Mtr-30 To 45 Day , Busbar 200 Ampere Till 1 Mtr-1 Day , Busbar 200 Ampere Till 1 Mtr-2 Day , Busbar 200 Ampere Till 1 Mtr-30 To 45 Day , Change Over Switch 4 Poll 63 1 Mtr-30 To 45 Day , Change Over Switch 4 Poll 63 Ampere-1 Day , Change Over Switch 4 Poll 63 Ampere30 To 45 Day , Change Over Switch 4 Poll 100-125 Ampere-1 Day , Change Over Switch 4 Poll 100-125 Ampere-2 Day , Change Over Switch 4 Poll 100-125 Ampere-30 To 45 Day , Change Over Switch 4 Poll 200-300 Ampere-1 Day , Change Over Switch 4 Poll 200-300 Ampere-2 Day , Change Over Switch 4 Poll 200-300 Ampere-30 To 45 Day , Section Peeler 75 By 60 By 45-1 Day , Section Peeler 75 By 60 By 45-2 Day , Section Peeler 75 By 60 By 45-30 To 45 Day , Section Peeler 60 By 30 By 45-1 Day , Section Peeler 60 By 30 By 45-2 Day , Section Peeler 60 By 30 By 45-30 To 45 Day , Elcb Switch Single Phase 40 Ampere Dp-1 Day , Elcb Switch Single Phase 40 Ampere Dp-2 Day , Elcb Switch Single Phase 40 Ampere Dp-30 To 45 Day , Elcb Switch Single Phase 63 Ampere Dp-1 Day , Elcb Switch Single Phase 63 Ampere Dp-30 To 45 Day , Elcb Switch Three Phase 40 Ampere 4 Poll-1 Day , Elcb Switch Three Phase 40 Ampere 4 Poll-30 To 45 Day , Elcb Switch Three Phase 63 Ampere 4 Poll-1 Day , Elcb Switch Three Phase 63 Ampere 4 Poll-2 Day , Elcb Switch Three Phase 63 Ampere 4 Poll-30 To 45 Day , Elcb Switch Three Phase 100 Ampere 4 Poll-1 Day , Elcb Switch Three Phase 100 Ampere 4 Poll-30 To 45 Day , 3.5 Kv Ups 4 Hour Backup-1 Day , 3.5 Kv Ups 4 Hour Backup-2 Day , 3.5 Kv Ups 4 Hour Backup-30 To 45 Day , Split Ac 1.5 Ton-1 Day , Split Ac 1.5 Ton-2 Day , Split Ac 1.5 Ton-30 To 45 Day , Split Ac 2.5 Ton-1 Day , Split Ac 2.5 Ton-30 To 45 Day , Tower Ac 2 Ton-1 Day , Tower Ac 2 Ton-30 To 45 Day , Tower Ac 4 Ton-1 Day , Tower Ac 4 Ton-2 Day , Tower Ac 4 Ton-3 Day , Tower Ac 4 Ton-30 To 45 Day , Ductoable Ac Unit 5 To 6 Ton-1 Day , Ductoable Ac Unit 7 To 10 Ton-1 Day , Toilet Chemical-1 Day , Toilet General-1 Day Total Quantity : 1515804