Tender For Dust Suppresion System For Mh 7019804 10 10 10 PIPE FABRICATION & ERECTION 1,890 INM 20 PIPE FABRICATION & ERECTION 1,512 INM 30 PIPE FABRICATION & ERECTION 1,900 INM 40 FAB & ERECTION OF PIPE SUPPORT 630 TO 50 Prov & Fixing Metallic Nozzle & Grouting 45 NO 60 Installation of Spray nozzles 50 NO 70 Installation of Spray nozzles 50 NO 80 FIXING OF VALVE 55 IND 90 FAB & ERECTION OF PIPE SUPPORT 190 TO 100 Installation of valves 4 IND 110 MOUNTING SENSORS / ERECTION/FABRICATION 2 LO 120 PROVIDING AND REPLACEMENT OF FLANGE 1,232 NO 130 PVC PIPE FITTING WORK 2 LO 140 FAB & ERECTION OF PIPE SUPPORT 1.5 TO 150 ERECTION & INSTALLATION OF PUMPS 2 TO 160 ERECTION & INSTALLATION OF PUMPS 2 TO Email : vishvendu.dave@amns.in Contact : Name : Vishvendu Dave Item Details : • Scope of Work- Vendor: - Dust Suppression System at oxide yard to control dust emission in atmosphere. • Unloading of Equipment: - • Unloading of equipment’s with appropriate identification marks at project site. • All Tools <(>&<)>Tackles are in contractor scope of work throughout project tenure. 1.Shifting of Pipes, fittings, valves, and all other material: - • Dismantling of old lines, shifting <(>&<)> unloading of the same and new lines and all related material to designated place as shown by AMNS Engineer. • All tools <(>&<)> tackles and consumables are considered in contractor scope of supply. • Crane, Hydra Trailer are in AMNS scope throughout project duration. 2.Fabrication of structures: - • Shifting of material, angel, channels from store to fabrication yard, unloading <(>&<)> fabrication. • All consumables are considered in the contractor’s scope of supply. 3.Erection, installation <(>&<)> Alignment of water Pump: - • Shifting of fabricated structures from fabrication site to project site, unloading, erection <(>&<)>alignment as per requirement. • All erection related tools <(>&<)> tackles are in the contractor scope of work. • After erection of water pump and related equipment trial must be taken and any abnormalities and vibration must be attended by the contractor. • All consumables are considered in the contractor’s scope of supply. 4. Welding, Grinding, Pipe Supports and erection and fabrication of line: - • All welding joints must be leaking proof. • After erection of entire line water leakage must be checked by contractor and leakage must be attended. • All pipe support should be taken from rigid structure to bare entire line weight and all welding joints must be fully welded according to structures. • All consumables are considered in the contractor’s scope of supply. • SPECIAL INSTRUCTION FOR VENDOR: • Re-welding of weld joints to be done if required after inspection. • • Job quantity will be decided by the department/site in charge. • • Contractor shall complete the job as per the approved specifications, drawings, and as per the direction <(>&<)> satisfaction of AMNS engineer-in-charge. • • Contractor shall ensure for housekeeping/cleaning of the area including cleaning /removing the debris/scrap/waste and used material and shifting the same/surplus materials to the location specified or shown by the engineer, area in charge. Bill certification will be only done after complete housekeeping. • Contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all Page 2 of 2 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000109815 Date 06.04.2024 Submission Date 13.04.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Aman Burnwal Contact Email AMAN.BURNWAL@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details required PPE’s (personal protective equipment) • Contractor shall ensure that all the tools and tackles deployed are certified by competent authority for use in factory. Certificate should be duly valid at all points of time. • HSE requirement - Contractor shall comply with the health, safety and environment policy as laid down by AMNS steel limited. • Penalty will be applicable for violating safety norms as per AMNS policy. • Penalty will be applicable for not completing the job as per the agreed timeline with Site in-charge. Note- The quantities shown in Drawing is for estimation. However, it may increase or decrease depending on the actual requirements • Scope of Work- AMNS • All jobs are to be carried out as per given instruction by AMNS engineer. • Providing Structural and technological materials Valves, Fog Canon, Flow meter, Pressure gauges, Pump, Water tank etc. • Crane, Hydra <(>&<)>Trailer are in AMNS scope throughout project

Tender Notice

43128448

Indian


Gujarat

April 13, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Tender For Dust Suppresion System For Mh 7019804 10 10 10 PIPE FABRICATION & ERECTION 1,890 INM 20 PIPE FABRICATION & ERECTION 1,512 INM 30 PIPE FABRICATION & ERECTION 1,900 INM 40 FAB & ERECTION OF PIPE SUPPORT 630 TO 50 Prov & Fixing Metallic Nozzle & Grouting 45 NO 60 Installation of Spray nozzles 50 NO 70 Installation of Spray nozzles 50 NO 80 FIXING OF VALVE 55 IND 90 FAB & ERECTION OF PIPE SUPPORT 190 TO 100 Installation of valves 4 IND 110 MOUNTING SENSORS / ERECTION/FABRICATION 2 LO 120 PROVIDING AND REPLACEMENT OF FLANGE 1,232 NO 130 PVC PIPE FITTING WORK 2 LO 140 FAB & ERECTION OF PIPE SUPPORT 1.5 TO 150 ERECTION & INSTALLATION OF PUMPS 2 TO 160 ERECTION & INSTALLATION OF PUMPS 2 TO Email : vishvendu.dave@amns.in Contact : Name : Vishvendu Dave Item Details : • Scope of Work- Vendor: - Dust Suppression System at oxide yard to control dust emission in atmosphere. • Unloading of Equipment: - • Unloading of equipment’s with appropriate identification marks at project site. • All Tools <(>&<)>Tackles are in contractor scope of work throughout project tenure. 1.Shifting of Pipes, fittings, valves, and all other material: - • Dismantling of old lines, shifting <(>&<)> unloading of the same and new lines and all related material to designated place as shown by AMNS Engineer. • All tools <(>&<)> tackles and consumables are considered in contractor scope of supply. • Crane, Hydra Trailer are in AMNS scope throughout project duration. 2.Fabrication of structures: - • Shifting of material, angel, channels from store to fabrication yard, unloading <(>&<)> fabrication. • All consumables are considered in the contractor’s scope of supply. 3.Erection, installation <(>&<)> Alignment of water Pump: - • Shifting of fabricated structures from fabrication site to project site, unloading, erection <(>&<)>alignment as per requirement. • All erection related tools <(>&<)> tackles are in the contractor scope of work. • After erection of water pump and related equipment trial must be taken and any abnormalities and vibration must be attended by the contractor. • All consumables are considered in the contractor’s scope of supply. 4. Welding, Grinding, Pipe Supports and erection and fabrication of line: - • All welding joints must be leaking proof. • After erection of entire line water leakage must be checked by contractor and leakage must be attended. • All pipe support should be taken from rigid structure to bare entire line weight and all welding joints must be fully welded according to structures. • All consumables are considered in the contractor’s scope of supply. • SPECIAL INSTRUCTION FOR VENDOR: • Re-welding of weld joints to be done if required after inspection. • • Job quantity will be decided by the department/site in charge. • • Contractor shall complete the job as per the approved specifications, drawings, and as per the direction <(>&<)> satisfaction of AMNS engineer-in-charge. • • Contractor shall ensure for housekeeping/cleaning of the area including cleaning /removing the debris/scrap/waste and used material and shifting the same/surplus materials to the location specified or shown by the engineer, area in charge. Bill certification will be only done after complete housekeeping. • Contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all Page 2 of 2 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000109815 Date 06.04.2024 Submission Date 13.04.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Aman Burnwal Contact Email AMAN.BURNWAL@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details required PPE’s (personal protective equipment) • Contractor shall ensure that all the tools and tackles deployed are certified by competent authority for use in factory. Certificate should be duly valid at all points of time. • HSE requirement - Contractor shall comply with the health, safety and environment policy as laid down by AMNS steel limited. • Penalty will be applicable for violating safety norms as per AMNS policy. • Penalty will be applicable for not completing the job as per the agreed timeline with Site in-charge. Note- The quantities shown in Drawing is for estimation. However, it may increase or decrease depending on the actual requirements • Scope of Work- AMNS • All jobs are to be carried out as per given instruction by AMNS engineer. • Providing Structural and technological materials Valves, Fog Canon, Flow meter, Pressure gauges, Pump, Water tank etc. • Crane, Hydra <(>&<)>Trailer are in AMNS scope throughout project