Supply Of Three Phase Prepaid Meterthree Phase Prepaid Meter,Supply & Testing Of Single Phase Prepaid Meter System:- 240Vac, 1 Phase 2 Wire Keypad Based Fully Type Tested, Bi S (Is: 15884) Marked, 5-60 Amps. Base Mounted Direct Current Operate Prepaid Energy Meter Having Capacitive Touch Keypad, Cal Ibration Led & Load Controlling Feature & Provisions For Tod (Time Of Day) Tariff And R.T.C. (Real Time Clock). In A Suitable Tamper Proof Hinge Type Box Along With Keypad With Bluetooth Features Must Be Enable In Meter Or In Freedom/Customer Interface Unit Or In Both For Manually And Remotely Token Transfer And Abc Reading Through Mobile App Os Android / Ios / Windows. Provided Mobile App Should Have A Provision Of Offline & Online Vending Token Process. Sms Facility For Providing The Vending Token To Consumer M Obile Number Provision Should Be There. All Prepaid Meters Should Be Provided With Integrated Cloud System For Prepaid Energy Mete R. Warranty Of Meter Should Be 10 Years From Date Of Supply. Amc/Annual Charges For Vending Transaction Price Included Per Meter Basis For 7Years. Demo Of Installation, Commissioning & Data Base Defining, Tariff Design, Mapping The Consumer, Training Should Be Provided. Model:- Liberty Make:- Secure, Landis & Gyr & Genus Make/Brand= Secure Is Accepted [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Three Phase Prepaid Meter System: - 3*240Vac, 3 Phase 4 Wire Keypad Based Fully Type Tested, Bis (Is: 13779 & Is : 15884) Marked, 20-80 Amps. Base Mounted Direct Current Operate Prepaid Energy Meter Having Capacitive Touch Keypad, Calibra Tion Led & Load Controlling Feature & Provisions For Tod (Time Of Day) Tariff And R.T.C. (Real Time Clock). In A Suitable Tamper Pro Of Smc Type Box/ Poly Carbonate Box With A Parallel Bluetooth Enabled Capacitive Touch Freedom Unit Including 5 Years Annual Cha Rges For Vending Transaction. Warranty Of Meter Should Be 10 Years, In Addition To This Centralized Controlling Unit/Software For On

Tender Notice

44845859

Western Railway

Indian


Gujarat

August 27, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Supply Of Three Phase Prepaid Meterthree Phase Prepaid Meter,Supply & Testing Of Single Phase Prepaid Meter System:- 240Vac, 1 Phase 2 Wire Keypad Based Fully Type Tested, Bi S (Is: 15884) Marked, 5-60 Amps. Base Mounted Direct Current Operate Prepaid Energy Meter Having Capacitive Touch Keypad, Cal Ibration Led & Load Controlling Feature & Provisions For Tod (Time Of Day) Tariff And R.T.C. (Real Time Clock). In A Suitable Tamper Proof Hinge Type Box Along With Keypad With Bluetooth Features Must Be Enable In Meter Or In Freedom/Customer Interface Unit Or In Both For Manually And Remotely Token Transfer And Abc Reading Through Mobile App Os Android / Ios / Windows. Provided Mobile App Should Have A Provision Of Offline & Online Vending Token Process. Sms Facility For Providing The Vending Token To Consumer M Obile Number Provision Should Be There. All Prepaid Meters Should Be Provided With Integrated Cloud System For Prepaid Energy Mete R. Warranty Of Meter Should Be 10 Years From Date Of Supply. Amc/Annual Charges For Vending Transaction Price Included Per Meter Basis For 7Years. Demo Of Installation, Commissioning & Data Base Defining, Tariff Design, Mapping The Consumer, Training Should Be Provided. Model:- Liberty Make:- Secure, Landis & Gyr & Genus Make/Brand= Secure Is Accepted [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Three Phase Prepaid Meter System: - 3*240Vac, 3 Phase 4 Wire Keypad Based Fully Type Tested, Bis (Is: 13779 & Is : 15884) Marked, 20-80 Amps. Base Mounted Direct Current Operate Prepaid Energy Meter Having Capacitive Touch Keypad, Calibra Tion Led & Load Controlling Feature & Provisions For Tod (Time Of Day) Tariff And R.T.C. (Real Time Clock). In A Suitable Tamper Pro Of Smc Type Box/ Poly Carbonate Box With A Parallel Bluetooth Enabled Capacitive Touch Freedom Unit Including 5 Years Annual Cha Rges For Vending Transaction. Warranty Of Meter Should Be 10 Years, In Addition To This Centralized Controlling Unit/Software For On