Item Rate Contract Tender Of Watershed Works In Bhagat Khijdiya Village; 1 Excavation in all sort of strata and formations incl. depositing the unuseful excavated stuff as and where directed incl. sorting and stacking useful materials in measurable conditions as directed up to 200mt lead and all lift etc. complete incl. dewatering. (A) IN OVERBURDEN INCL. HARD MURRUM. & (B) IN SOFT ROCK. (Reg. SOR_2023-24, Page No.16, Chapter-4, Item No.-1(A & B)) (A) IN OVERBURDEN INCL. HARD MURRUM.- 1 Cu.m 74.00 13.32 87.32 (B) IN SOFT ROCK.- 1 Cu.m 165.00 29.70 194.70 2 Prov.& Laying in position controlled cement concrete using cement sand & gravel by machine mix for PCC including necessary formworks, compaction, ramming, curing as directed with all lead and lift etc complete. For foundation concrete / other general purpose (B) Concrete grade M-15 and MSA- 63mm (Graded) (Reg. SOR_2023-24, Page No.7, Chapter-2, Item No.-5(b)) 1 Cu.m 2847.00 512.46 3359.46 3 Providing & Laying in position controlled cement concrete using cement sand & crushed metal aggregate by machine mix incl. necessary formworks ,compaction by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding the cost of steel. For foundation concrete (C) Concrete grade M-15 and MSA-40mm (Graded) (Reg. SOR_2023-24, Page No.7, Chapter-2, Item No.-4(c)) 1 Cu.m 3461.00 622.98 4083.98 4 Providing and laying uncoursed rubble masonry in cement and sand mortar by mass and machine mixing incl. use of header and bond stones etc and incl. scaffolding and finishing to required shape and batter end steps etc as per drawing and racking out the joints, curing etc complete in all respect. For all lead & lift (B) In C.M. 1:3 for super structure. (Reg. SOR 2023-24, Page No.17, Chapter-4, Item No.-6(B)) 1 Cu.m 3109.00 559.62 3668.62 5 Earthwork / Back filling with selected earth brought from out side borrow area or from excavated useful material incl. watering ramming, Compaction with pneumatic temping and all lead and lift etc complete. (Reg. SOR-2023-24, Page No.24, Chapter-6, Item No.-9) 1 Cu.m 132.00 23.76 155.76 6 Providing dry rubble masonry as per requirement including hand packing filling with chips etc. completed. (Reg. SOR 2023-24, Page No.41, Chapter-8, Item No.-24) 1 Cu.m 1213.00 218.34 1431.34 7 Quarrying, transporting & laying horizontal and inclined sand filter of required gradation in earthen dam in layers of specified thickness incl. required watering ,light rolling for all lead and lift etc complete. (Reg. SOR 2023-24, Page No.-2, Chapter-1, Item No.-10) 1 Cu.m 510.00 91.80 601.80 8 Drilling of 450 mm dia. bore well in alluvial, boulder etc. all strata including lowering of pipe assembly, bottom sealing, gravel packing, clay packing, development washing and air compressor and further drilling of 165 mm dia. bore hole in rocky strata etc. complete by DR & DTH rig as suggested by Hydrologist in Zone I & II. Note. Rocky strata drilling to be up to 250 mm. diameter borehole with lowering of pipe of 200 mm dia. Up to bottom of the hole i.e. for 200 mtrs if required due to collapsible strata as per suggestion also if power is not released at location then 25% amount will be kept deposit (GWSSB SOR 2022-23, Page No-73, Section-F, Item No.-8) 9 UPVC Bail plug (Bottom Cap) suitable for 200 mm dia. pipe. (GWSSB SOR 2022-23 Page no.6, item no. 3) 1 Rmt 822.05 147.97 970.02 10 Providing and laying brick masonry using std. modular brunt bricks (2nd class) and cement mortar by mass incl. striking out joints, curing, finishing and scaffolding etc. complete. a) IN C.M. 1:5 For all lead and lift. (Reg. SOR_2023-24, Chapter-2, Page No-9, Item No-13(a)) 1 Cu.m 5237.00 942.66 6179.66 11 Prov. and Laying in position Controlled cement concrete using cement, sand and crushed aggregate by mass and machine mix for R.C.C/CC work including necessary formworks centering scaffolding compaction by vibrator, curing as directed with all lead & lift etc complete Excluding the cost of reinforcement FOR PLINTH COURSE & COPING (A) Concrete grade M-15 and MSA-20mm (Reg. SOR_2023-24, Chapter-6, Page No-25, Item No-13(a)) 1 Cu.m 4192.00 754.56 4946.56 12 Providing, cutting, bending, binding and fixing in position as per drawing. TMT BAR, reinforcement for R.C.C. works and anchor bars incl. cost of black annealed 16 to 18 BWG M.S.. Wire etc. complete with all lead and lift. (b) Fe-500 (Reg. SOR_2023-24, Chapter-2, Page No-9, Item No-11(b)) 1 Mt 76303.00 13734.54 90037.54 13 Prov. and Laying in position Controlled cement concrete using cement, sand and crushed aggregate by mass and machine mix for R.C.C/CC work including necessary formworks centering scaffolding compaction by mechanical vibrator, curing as directed with all lead & lift etc complete Excluding the cost of reinforcement FOR COLUMN AND BEAMS (A) Concrete grade M-25 and MSA-20mm (Reg. SOR_2023-24, Chapter-6, Page No-25, Item No-15(a)) 1 Cu.m 5148.00 926.64 6074.64 14 Prov. and Laying in position Controlled cement concrete using cement, sand and crushed aggregate by mass and machine mix for R.C.C/CC work including necessary formworks centering scaffolding compaction by mechanical vibrator, curing as directed with all lead & lift etc complete Excluding the cost of reinforcement FOR SLABS AND LOFTS (A) Concrete grade M-25 and MSA-20mm (Reg. SOR_2023-24, Chapter-6, Page No-25, Item No-14(a)) 1 Cu.m 5244.00 943.92 6187.92 15 Cement plaster 20mm thick in single coat to stone masonry in C.M. 1:3 incl. finishing, curing, scaffolding etc complete. (a) UPTO 6.0 Mt HEIGHT (Reg. SOR_2023-24, Chapter-6, Page No-30, Item No-37(a)) 1 Sq.m 248.00 44.64 292.64 16 Cement plaster 12mm thick in single coat to CC/RCC /masonry work in C.M. 1:3 incl. finishing, curing, scaffolding etc complete. (a) UP TO 6.0 Mt HEIGHT (Reg. SOR_2023-24, Chapter-6, Page No-31, Item No-39(a)) 1 Sq.m 172.00 30.96 202.96 17 Prov. & Laying. in position controlled cement concrete using cement, sand and crushed metal aggregate by machine mix for R.C.C work incl. necessary formworks centering 1 Cu.m 5526.00 994.68 6520.68 of bore well by 1 Rmt 1599.00 287.82 1886.82

Tender Notice

44902322

Indian


Gujarat

September 05, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Item Rate Contract Tender Of Watershed Works In Bhagat Khijdiya Village; 1 Excavation in all sort of strata and formations incl. depositing the unuseful excavated stuff as and where directed incl. sorting and stacking useful materials in measurable conditions as directed up to 200mt lead and all lift etc. complete incl. dewatering. (A) IN OVERBURDEN INCL. HARD MURRUM. & (B) IN SOFT ROCK. (Reg. SOR_2023-24, Page No.16, Chapter-4, Item No.-1(A & B)) (A) IN OVERBURDEN INCL. HARD MURRUM.- 1 Cu.m 74.00 13.32 87.32 (B) IN SOFT ROCK.- 1 Cu.m 165.00 29.70 194.70 2 Prov.& Laying in position controlled cement concrete using cement sand & gravel by machine mix for PCC including necessary formworks, compaction, ramming, curing as directed with all lead and lift etc complete. For foundation concrete / other general purpose (B) Concrete grade M-15 and MSA- 63mm (Graded) (Reg. SOR_2023-24, Page No.7, Chapter-2, Item No.-5(b)) 1 Cu.m 2847.00 512.46 3359.46 3 Providing & Laying in position controlled cement concrete using cement sand & crushed metal aggregate by machine mix incl. necessary formworks ,compaction by mechanical vibrator curing as directed with all lead and lift etc complete. Excluding the cost of steel. For foundation concrete (C) Concrete grade M-15 and MSA-40mm (Graded) (Reg. SOR_2023-24, Page No.7, Chapter-2, Item No.-4(c)) 1 Cu.m 3461.00 622.98 4083.98 4 Providing and laying uncoursed rubble masonry in cement and sand mortar by mass and machine mixing incl. use of header and bond stones etc and incl. scaffolding and finishing to required shape and batter end steps etc as per drawing and racking out the joints, curing etc complete in all respect. For all lead & lift (B) In C.M. 1:3 for super structure. (Reg. SOR 2023-24, Page No.17, Chapter-4, Item No.-6(B)) 1 Cu.m 3109.00 559.62 3668.62 5 Earthwork / Back filling with selected earth brought from out side borrow area or from excavated useful material incl. watering ramming, Compaction with pneumatic temping and all lead and lift etc complete. (Reg. SOR-2023-24, Page No.24, Chapter-6, Item No.-9) 1 Cu.m 132.00 23.76 155.76 6 Providing dry rubble masonry as per requirement including hand packing filling with chips etc. completed. (Reg. SOR 2023-24, Page No.41, Chapter-8, Item No.-24) 1 Cu.m 1213.00 218.34 1431.34 7 Quarrying, transporting & laying horizontal and inclined sand filter of required gradation in earthen dam in layers of specified thickness incl. required watering ,light rolling for all lead and lift etc complete. (Reg. SOR 2023-24, Page No.-2, Chapter-1, Item No.-10) 1 Cu.m 510.00 91.80 601.80 8 Drilling of 450 mm dia. bore well in alluvial, boulder etc. all strata including lowering of pipe assembly, bottom sealing, gravel packing, clay packing, development washing and air compressor and further drilling of 165 mm dia. bore hole in rocky strata etc. complete by DR & DTH rig as suggested by Hydrologist in Zone I & II. Note. Rocky strata drilling to be up to 250 mm. diameter borehole with lowering of pipe of 200 mm dia. Up to bottom of the hole i.e. for 200 mtrs if required due to collapsible strata as per suggestion also if power is not released at location then 25% amount will be kept deposit (GWSSB SOR 2022-23, Page No-73, Section-F, Item No.-8) 9 UPVC Bail plug (Bottom Cap) suitable for 200 mm dia. pipe. (GWSSB SOR 2022-23 Page no.6, item no. 3) 1 Rmt 822.05 147.97 970.02 10 Providing and laying brick masonry using std. modular brunt bricks (2nd class) and cement mortar by mass incl. striking out joints, curing, finishing and scaffolding etc. complete. a) IN C.M. 1:5 For all lead and lift. (Reg. SOR_2023-24, Chapter-2, Page No-9, Item No-13(a)) 1 Cu.m 5237.00 942.66 6179.66 11 Prov. and Laying in position Controlled cement concrete using cement, sand and crushed aggregate by mass and machine mix for R.C.C/CC work including necessary formworks centering scaffolding compaction by vibrator, curing as directed with all lead & lift etc complete Excluding the cost of reinforcement FOR PLINTH COURSE & COPING (A) Concrete grade M-15 and MSA-20mm (Reg. SOR_2023-24, Chapter-6, Page No-25, Item No-13(a)) 1 Cu.m 4192.00 754.56 4946.56 12 Providing, cutting, bending, binding and fixing in position as per drawing. TMT BAR, reinforcement for R.C.C. works and anchor bars incl. cost of black annealed 16 to 18 BWG M.S.. Wire etc. complete with all lead and lift. (b) Fe-500 (Reg. SOR_2023-24, Chapter-2, Page No-9, Item No-11(b)) 1 Mt 76303.00 13734.54 90037.54 13 Prov. and Laying in position Controlled cement concrete using cement, sand and crushed aggregate by mass and machine mix for R.C.C/CC work including necessary formworks centering scaffolding compaction by mechanical vibrator, curing as directed with all lead & lift etc complete Excluding the cost of reinforcement FOR COLUMN AND BEAMS (A) Concrete grade M-25 and MSA-20mm (Reg. SOR_2023-24, Chapter-6, Page No-25, Item No-15(a)) 1 Cu.m 5148.00 926.64 6074.64 14 Prov. and Laying in position Controlled cement concrete using cement, sand and crushed aggregate by mass and machine mix for R.C.C/CC work including necessary formworks centering scaffolding compaction by mechanical vibrator, curing as directed with all lead & lift etc complete Excluding the cost of reinforcement FOR SLABS AND LOFTS (A) Concrete grade M-25 and MSA-20mm (Reg. SOR_2023-24, Chapter-6, Page No-25, Item No-14(a)) 1 Cu.m 5244.00 943.92 6187.92 15 Cement plaster 20mm thick in single coat to stone masonry in C.M. 1:3 incl. finishing, curing, scaffolding etc complete. (a) UPTO 6.0 Mt HEIGHT (Reg. SOR_2023-24, Chapter-6, Page No-30, Item No-37(a)) 1 Sq.m 248.00 44.64 292.64 16 Cement plaster 12mm thick in single coat to CC/RCC /masonry work in C.M. 1:3 incl. finishing, curing, scaffolding etc complete. (a) UP TO 6.0 Mt HEIGHT (Reg. SOR_2023-24, Chapter-6, Page No-31, Item No-39(a)) 1 Sq.m 172.00 30.96 202.96 17 Prov. & Laying. in position controlled cement concrete using cement, sand and crushed metal aggregate by machine mix for R.C.C work incl. necessary formworks centering 1 Cu.m 5526.00 994.68 6520.68 of bore well by 1 Rmt 1599.00 287.82 1886.82