Arcelor Mittal Nippon Steel India Limited - Gujarat

45051234 tender for 2000156189 10 20 slag loading and shifting with transport 000156189 10 10 10 slag loading and shifting with transport 1 to email : gopal.ameta@amns.in contact : name : gopal ameta item details : job title: sow slag loading and shifting (with transport) 2025 spr no 20001516189 scope of work vendor technical description unit total quantity corex slag management from source to ton 286,800 export yard (with trasportaion) corex slag management from source to ton 430,200 domastic (without transportaion) 1. granulated slag shifting from sgp to designated dumping yard. average of 1900 mt/day. max of 2200 mt/day. 2. re arranging and heaping of slag at corex site area. if dumping space available storage at sgp yard to be avoided. 3. spillage slag during transit on road to be cleaned regularly on day to day basis as per spillage on road. 4. cleaning and disposal of carry over (granulated) slag from settling pond <(>&<)> clarifier ponds. 5. dry pit cleaning and dry pit slag shifting to the designated dumping yard as and when required. presently 12% dry slag being generated on and average. in case sgp breakdown dry pit will be operated for 1 2 taps continuously. vender should have sufficient equipment’s and manpower to manage such scenarios. 6. cleaning of hot metal and slag from dry pits during emergency. 7. shifting other solid waste like drs dust, cast house zero meter area dust or solid waste, cast house dedusting dust <(>&<)> debris also in the scope of solid waste disposal. certification will be done based on no. of trips. 8. one supervisor in each shift shall be deputed for managing equipment operation, maintenance, and coordination with corex operation. you shall carry out the subject work as per the requirements and instructions by our user dept and signing of loading slip of secondary sales vehicle from amns engineer. 9. direct loading of g slag from discharge chute to dumper is prohibited. it should remove the moisture by aside to slag and after 2 to 3hrs load in dumper. 10. removal, loading, transportation of granulated slag and dry pit slag to specified yard, heaping of received slag to make way for incoming slag, cleaning of spillage slag. 11. the lead between loading and unloading point for granulated slag shall be approx. 19 kms at (both ways). 12. you shall ensure that generation point slag heap is always kept at minimum height and should not touch the generation hood. 13. the carryover granulated slag generated from ponds has to be shifted to dumping yard. due to unavoidable circumstances sometimes, metal will be dumped into the dry pits. during this time, material shall be unloaded at specified yard as per user dept instructions. 14. handling of equipment’s such as chain mounted pay loaders, dumpers, page 2 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details excavators, all tools and tackles, labors and supervision etc., shall be in your scope. you shall deploy sufficient equipment’s for the above operation activities. 15. replacement of any man and machinery should be allowed only after prior intimation to the concerned department personals. 16. fuel, accessories, spares, consumables and maintenance of your fleet shall be in your scope. 17. storage for keeping spares and consumables shall be in your scope. you are advised to store all critical spares/ consumables to ensure continuous availability of your equipment’s. 18. you shall ensure that there should not be any spillage during transit and if any spillage takes place on the road the same shall be cleaned by you on a day to day basis. otherwise, a suitable penalty will be imposed on you. 19. in case your services are found unsatisfactory or unacceptable, or on your failure to complete the assignments within the time stipulated by user dept. company reserves the right to deduct the suitable amount as penalty as deemed reasonable from the amount payable to you in addition to the revocation of the contract without notice as its discretion. 20. during any emergency conditions the company reserves the right to deploy additional equipment’s to take care of the subject job. however, the penalty shall also be levied as per actual expenses claimed by other supplier +25% extra as penalty, in case of non availability of equipment and also non completion of work in the stipulated time. 21. you should provide equipment’s to the user dept. on 24 hours availability basis with operators. replacement of breakdown equipment’s shall be done without affecting the scope of the work. otherwise, a suitable penalty will be imposed on you. 22. cleaning of dry slag from the pits must be done within the stipulated time after cast house changeover by suitable equipment like excavator as per instructions and requirements by corex department. otherwise, a suitable penalty will be imposed on you. 23. loading equipment’s for other solid waste like drs dust, cast house zero meter area dust or solid waste, cast house dedusting dust <(>&<)> debris also to be provided as per the requirement. 24. in case slag granulation system breakdown or maintenance slag will be diverted to dry pit. to manage dry pit during that time is challenging, additional excavator breaker is also required. 25. in case of furnace problem, we need to take hot metal in dry pit for sometimes. volvo breakers may be required for removing solidified metal jam from dry pit. 26. need to maintain and safe drainage system of sgp. 27. based on requirement need to weighment of loaded vehicle whenever ask by area in charge for verification. 28. equipment and manpower safety will be in vendor scope. 29. entire sgp area housekeeping is to be taken care by vendor. weight assessment: · loading <(>&<)> shifting of slag the weight required for the billing purpose shall be technically assessed and cross verified by our corex department, based on the slag production report generated by our technical control group from the raw material charged to the furnace. if once the weighting system started billing will proceed as per actual weighment. · loading of slag: bill quantity certified as per secondary sales weighments. · the actual quantity may vary every month depending on the domestic sales. the contractor must ensure a proper evacuation plan from the source based on actual condition. however, for planning purposes a monthly forecast will be given by the secondary sales department. · list of equipment based on previous experience. page 3 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details sl no types of equip.capacity/title no. of equipment’s req. remarks 1 excavator ex200 2 1.to clean ponds and to make heap at chute area 2.loading 0f g and d slag 3.drypit cleaning 4.stand by required in case of breakdown 2 loader 950 1 to load slag to dumpers 3 dumpers 25t 12 dry slag and g slag shifting b. safety the driver should wear the safety belt while driving the vehicles. 1. your vehicle should have a reverse horn. 2. your drivers shall maintain the vehicle speed limit as per company rules. 3. in case your persons are engaged in working in hot zone area, you should provide them with heat resistance suits approved jeans jacket, cotton shirt, and cotton underwear <(>&<)> cotton socks, gum boots. 4. you shall deploy adequately trained and experienced personnel and equipment’s for ensuring smooth operation round the clock. 5. you shall engage the vehicles (with valid rto documents) with drivers having a valid driving license. the driver and cleaner should be deployed in such a manner to ensure availability of resources whenever required and each person employed does not have more than 12 hours working duration. 6. you shall take necessary safety precautions while loading <(>&<)> shifting the material as required by the user dept. 7. the tyres of vehicles should not be worn out. 8. the vehicle name plate, lighting systems including side blinkers shall be maintained without fail. 9. being the restricted area due to hot handling conditions, you shall not load other than your vehicles at the loading point. if any, you will be penalized heavily. 10. during clarifier <(>&<)> settling pond cleaning hot water may spread in vehicle movement area, so at that time ensure no movement of person on ground. 11. equipment and manpower safety will be in vendor scope. 12. operators need to maintain vehicle checklists throughout the month. 13. if any glass is found broken, it must be replaced immediately. 14. vehicle safety should be maintained according to the specifications outlined in table no 1. 15. vendor need to follow sop <(>&<)> hirac of dry pit cleaning, pond cleaning <(>&<)> slag shifting at the time of wo for understanding the specific job and accordingly you workforce to be trained. 15.emergency preparedness: · emergency response training: ensure all operators and drivers are trained in emergency response procedures, particularly for situations involving hot slag or equipment failure. · first aid kits and emergency equipment: require that all vehicles and work sites have fully stocked first aid kits and fire extinguishers. 16.hazard communication: · signage and barricading: clearly mark and barricade areas where slag loading and shifting occur, particularly in hot zones or near the clarifier and settling ponds. · communication devices: equip all personnel with communication devices to ensure immediate contact in case of an emergency. 17.load securing: · proper securing of slag: ensure that slag is securely loaded and covered during transportation to prevent spillage, particularly when transporting to export yards. · regular inspection: implement a protocol for regular checks to ensure that the load is properly secured throughout the transport process. 18.heat stress prevention: · rest breaks and hydration: ensure that workers operating in high temperature environments, such as near hot slag, have scheduled r page 4 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details est breaks and access to hydration to prevent heat stress. · cooling zones: if feasible, provide shaded or cooled areas where workers can take breaks to lower their body temperature. 19.maintenance and inspection protocols: · regular equipment maintenance: include specific guidelines for the frequency and scope of maintenance checks on all vehicles and equipment, beyond just the monthly vehicle checklist. · pre shift inspections: require pre shift inspections of all equipment to ensure operational safety and to prevent breakdowns during slag shifting operations. 20.traffic management: · designated routes: establish designated routes for vehicles transporting slag within the plant to minimize interactions with other plant operations and reduce the risk of accidents. · traffic controllers: consider deploying traffic controllers or spotters in areas with high vehicle movement to ensure safe navigation and loading operations. 21.behavioral safety: · safety incentives and penalties: implement a system of incentives for maintaining safety standards and penalties for violations, encouraging a culture of safety among all personnel. a. fatigue management: beyond the 12 hour work limit, consider implementing a system to monitor signs of fatigue among drivers and o perators to prevent accidents. movement of manpower / associates at our hazira site. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. · vendors must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. · vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is used for processing the gate pass. contractual equipment shall be equipped with safety devices are in working condition as per oem standard and am/ns india requirements as shown in table. s.no date:13.08.2025 safety devices dumper excavator wheel loader 1 gps system from vendor approved by am/ns. 2 prestart alarm 3 seat belt for driver 4 seat belt for co passengers 5 head lights 6 side indicators 7 parking light 8 brake light 9 front main horn 10 backup alarm/reverse alarm 11 revolving light/beacons 12 rear view side mirrors as per oem recommendations 13 rear view camera 14 reverse proximity sensor with warning system 15 wipers 16 fire extinguisher for heavy equipment category 9kg, page 5 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details medium equipment 6kg and light vehicle 2kg 17 parking/hand brake 18 load test certificate (form 10 third party) 19 forklift blue spot light/safety pedestrian lights 20 red zone warning light for forklift 21 over hoist limit switch 22 safe load indicator (sli) 23 marching alarm 24 boom control system warning 25 platform capacity indiactor c. statutory <(>&<)> general requirements: 2. owner / site in charge compulsory attend monthly department contractor meeting. 3. need to maintain attendance system for all manpower and supervisors as per company rules, more than 9 days duty not allowed. 4. no manpower allowed to duty more than 16 hours per day. 5. regular inspection <(>&<)> vehicle checklist to be maintained by all equipment operators and submitted monthly. 6. all equipment’s need to available in fit and fine condition at corex site. 7. when billing, submit scrum report of operator for attendance verification. 8. the contractor shall provide the equipment and operators as per land of law (e.g., rto laws <(>&<)> fitness) and company policies (e.g., safety certification <(>&<)> competency training). 9. all equipment must be following all applicable rto, central, state, and local govt rules <(>&<)> regulations. 10. vendor must ensure wsa policy and group insurance for their manpower. 11. vendor must have technical and operational competence to provide required services. 12. vendor must have work experience in heavy industries such as large steel plant, cement, mining or port operations. 13. vendor must comply with all relevant local, state regulations, including health and safety standards. 14. vendor must have sufficient fleet to allocate sufficient resources, including manpower, equipment, to meet plant requirements. 15. manpower should be competent as per competency matrix as per latest msa of amns. 16. equipment manufacturing year must be 2018 or later (equipment of manufacturing year before 2018 will not be allowed) and it should be in good working condition. any decision regarding acceptance of equipment of yom earlier than 2018 will be taken by amns only in exceptional cases. 17. equipment should be ready to deploy / make operational at our site by 1st jan 2025. however, the exact date of mobilization would be communicated 7 days in advance. contract period from 1st jan 2025 to 31st dec 2025. 18. final vehicle check will be done by amns hse department, equipment fitness <(>&<)> ppes will be checked every month by amns india user department. 19. gps system must be installed in all tippers/dumpers from common vendor which is approved by am/ns india. 20. all equipment needs to be deployed from 07:00 am to 07:00 pm for day shift <(>&<)> 07:00 pm to 07:00 am for night shift. all equipment operators must be relieved on a one to one basis. 21. to avoid production loss, equipment must be maintained in healthy condition for readiness for shutdown activities <(>&<)> regular work to complete in stipulated time. 22. necessary attachment needs to be provided with equipment as per operational requirement as per site visit. page 6 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 23. in case of special attachment vendor to keep provision of various fittings <(>&<)> adaptors in advance for fitment in vehicle. vehicle must be suitable for work at the amns site it has to be deployed. 24. the contractor shall provide the specified equipment in healthy condition with skilled operators as per company policies. 25. the contractor shall deploy alternate equipment same specification or above in case of any breakdown above 48hrs duration. 26.compliance with labor laws: a. registration under the contract labour (regulation <(>&<)> abolition) act, 1970: ensure that the vendor is registered under this act, as it governs the employment of contract labor in certain establishments. b. payment of wages act, 1936 compliance: the vendor must comply with the payment of wages act, ensuring timely and complete payment to workers without unauthorized deductions. c. employees’ provident fund (epf) and miscellaneous provisions act, 1952: ensure that all eligible workers are covered under epf, and contributions are made regularly. 27.compliance with environmental regulations: d. adherence to the environmental protection act, 1986: the vendor must ensure compliance with all relevant environmental regulations, including waste management, air and water pollution controls. e. hazardous waste management: specific compliance with the hazardous and other wastes (management and transboundary movement) rules, 2016, should be enforced, particularly regarding the handling, transportation, and disposal of slag and other industrial waste. 28.health and safety regulations: f. factories act, 1948 compliance: the vendor must comply with all provisions under the factories act, including provisions related to worker safety, health, and welfare, especially in hazardous environments. g. mandatory safety audits: periodic safety audits conducted by accredited agencies should be mandated to ensure ongoing compliance with safety standards. 29.insurance and liability: h. employees’ state insurance act, 1948: the vendor must ensure that all workers are covered under the esi act, providing medical and cash benefits in case of sickness, maternity, and employment injury. i. public liability insurance act, 1991: ensure that the vendor has adequate public liability insurance to cover any potential claims arising from accidents or environmental damage during operations. 30.vehicle and equipment compliance: j. motor vehicles act, 1988 compliance: all vehicles used by the vendor must adhere to the latest provisions of the motor vehicles act, including insurance, fitness certification, pollution control, and registration requirements. k. periodic vehicle fitness certification: in addition to regular inspections, it should be mandatory for all vehicles to undergo fitness certification by an authorized rto, as per the motor vehicles act. l. installation of speed governors: for heavy vehicles, ensure that speed governors are installed and maintained as per the central motor vehicles rules, 1989. 31.compliance with building and other construction workers (regulation of employment and conditions of service) act, 1996 (if applicable): m. ensure that any construction related activities comply with this act, which mandates safety, health, and welfare measures for workers involved in building and construction work. 32.periodic compliance reporting: n. monthly compliance reports: the vendor should submit a monthly compliance report covering adherence to all statutory and regulatory requirements, including labor laws, environmental regulations, and safety standards. o. third party verification: consider requiring third party audits to verify compliance with statutory requirements, especially for environmental and safety regulations. 33.contractor licensing: p. obtaining necessary licenses: the vendor must obtain all necessary licenses and permits required for the operation, including labor page 7 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details licenses, environmental clearances, and equipment operation permits. d. penalty specific penalty for nonperformance by vendor and must be cardinally measured. 1. a penalty will be imposed in case of noncompliance with hse norms <(>&<)> non conformity of work. 2. delay in dry pit cleaning or dry slag accumulation of more than 2000 tons. 3. more than 2 incidents of slag chute jam per month or granulated slag accumulation of more than 4000 tons 4. violation of any safety norms will be penalized to the contractor. 5. sleeping case of associates with penalty of minimum amount decided by phse if same case repeated the associates will be suspended or terminated by furnace in charges/operation head/hod. 6. misbehavior of contractor associate with area engineers/manager will be penalized/ suspended or terminated by furnace in charges/operation head/hod. 7. violation of company traffic rules will be penalized. 8. as per management directive, transport / movement of associates to <(>&<)> fro for plant should be mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. 9. penalties for statutory non compliance: a. non compliance with labor laws: for any instance of non compliance with labor laws (e.g., non payment of wages, violation of working hour limits), a penalty equal to the number of unpaid wages plus a 50% surcharge will be imposed. repeated offenses may lead to contract termination. b. failure to comply with provident fund/esi regulations: if the vendor fails to make timely contributions to epf or esi, a penalty of 2% of the total contract value per incident will be imposed, and the company reserves the right to withhold payments until compliance is achieved. c. violation of environmental regulations: any breach of environmental regulations, such as improper disposal of slag or failure to comply with pollution control norms, will result in a penalty of inr 1,00,000 per incident, with repeated violations leading to contract termination. 10. penalties for vehicle and equipment non compliance: a. non compliance with rto and motor vehicle laws: if any vehicle is found operating without valid rto documentation, fitness certification, or pollution control certificate, a penalty of inr 50,000 per vehicle will be imposed. additionally, the vendor must rectify the issue within 24 hours, failing which further penalties will be applied. b. failure to maintain equipment standards: if equipment is found to be non compliant with safety standards or in poor condition, a penalty of inr 20,000 per piece of equipment will be imposed, and the equipment must be replaced within 48 hours to avoid further penalties. 11. penalties for safety non compliance: a. lack of ppe or safety equipment: if workers are found without proper ppe or safety equipment, a penalty of inr 10,000 per incident will be imposed. repeated violations will result in a doubling of the penalty and possible suspension of the offending worker. b. failure to conduct safety audits: if the vendor fails to conduct required safety audits or submit safety reports, a penalty of inr 50,000 per missed audit will be imposed, with additional penalties for any safety violations discovered during subsequent audits. c. non compliance with emergency preparedness: if the vendor is found unprepared for emergencies (e.g., lack of first aid kits, inadequate fire extinguishers), a penalty of inr 25,000 per incident will be imposed, with immediate corrective actions required. 12. penalties for inadequate training and competence: a. untrained or incompetent personnel: if any worker is found to lack the necessary training or competence as per the competency matrix, a penalty of inr 5,000 per worker per day will be imposed until the issue page 8 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details is rectified. this also applies if operators are found without valid certification or training. b. failure to maintain attendance and work hours: if the vendor fails to adhere to the attendance system or work hour limits, a penalty of inr 10 ,000 per worker per incident will be imposed, with the potential for further penalties if noncompliance continues. 13. penalties for reporting and documentation failures: a. failure to submit required documentation: a penalty of inr 5,000 per day will be imposed for each day that required statutory, safety, or operational documentation (e.g., vehicle checklists, compliance reports) is delayed or incomplete. b. false or misleading documentation: if the vendor is found to have submitted false or misleading documentation, a penalty of inr 50,000 will be imposed per incident, with possible legal action and contract termination for severe cases. scope of work amns india: · supervising of operational works. item note : 2 2000156189 20 20 10 slag loading without transport 1 to email : gopal.ameta@amns.in contact : name : gopal ameta item details : job title: sow slag loading and shifting (without transport) 2025 spr no 20001516189 scope of work vendor technical description unit total quantity corex slag management from source to ton 286,800 export yard (with trasportaion) corex slag management from source to ton 430,200 domastic (without transportaion) 1. granulated slag shifting from sgp to designated dumping yard. average of 1900 mt/day. max of 2200 mt/day. 2. re arranging and heaping of slag at corex site area. if dumping space available storage at sgp yard to be avoided. 3. spillage slag during transit on road to be cleaned regularly on day to day basis as per spillage on road. 4. cleaning and disposal of carry over (granulated) slag from settling pond <(>&<)> clarifier ponds. 5. dry pit cleaning and dry pit slag shifting to the designated dumping yard as and when required. presently 12% dry slag being generated on and average. in case sgp breakdown dry pit will be operated for 1 2 taps continuously. vender should have sufficient equipment’s and manpower to manage such scenarios. 6. cleaning of hot metal and slag from dry pits during emergency. 7. shifting other solid waste like drs dust, cast house zero meter area dust or solid waste, cast house dedusting dust <(>&<)> debris also in the scope of solid waste disposal. certification will be done based on no. of trips. 8. one supervisor in each shift shall be deputed for managing equipment operation, maintenance, and coordination with corex operation. you shall carry out the subject work as per the requirements and instructions by our user dept and signing of loading slip of secondary sales vehicle from amns engineer. 9. direct loading of g slag from discharge chute to dumper is page 9 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details prohibited. it should remove the moisture by aside to slag and after 2 to 3hrs load in dumper. 10. removal, loading, transportation of granulated slag and dry pit slag to specified yard, heaping of received slag to make way for incoming slag, cleaning of spillage slag. 11. the lead between loading and unloading point for granulated slag shall be approx. 19 kms at (both ways). 12. you shall ensure that generation point slag heap is always kept at minimum height and should not touch the generation hood. 13. the carryover granulated slag generated from ponds has to be shifted to dumping yard. due to unavoidable circumstances sometimes, metal will be dumped into the dry pits. during this time, material shall be unloaded at specified yard as per user dept instructions. 14. handling of equipment’s such as chain mounted pay loaders, dumpers, excavators, all tools and tackles, labors and supervision etc., shall be in your scope. you shall deploy sufficient equipment’s for the above operation activities. 15. replacement of any man and machinery should be allowed only after prior intimation to the concerned department personals. 16. fuel, accessories, spares, consumables and maintenance of your fleet shall be in your scope. 17. storage for keeping spares and consumables shall be in your scope. you are advised to store all critical spares/ consumables to ensure continuous availability of your equipment’s. 18. you shall ensure that there should not be any spillage during transit and if any spillage takes place on the road the same shall be cleaned by you on a day to day basis. otherwise, a suitable penalty will be imposed on you. 19. in case your services are found unsatisfactory or unacceptable, or on your failure to complete the assignments within the time stipulated by user dept. company reserves the right to deduct the suitable amount as penalty as deemed reasonable from the amount payable to you in addition to the revocation of the contract without notice as its discretion. 20. during any emergency conditions the company reserves the right to deploy additional equipment’s to take care of the subject job. however, the penalty shall also be levied as per actual expenses claimed by other supplier +25% extra as penalty, in case of non availability of equipment and also non completion of work in the stipulated time. 21. you should provide equipment’s to the user dept. on 24 hours availability basis with operators. replacement of breakdown equipment’s shall be done without affecting the scope of the work. otherwise, a suitable penalty will be imposed on you. 22. cleaning of dry slag from the pits must be done within the stipulated time after cast house changeover by suitable equipment like excavator as per instructions and requirements by corex department. otherwise, a suitable penalty will be imposed on you. 23. loading equipment’s for other solid waste like drs dust, cast house zero meter area dust or solid waste, cast house dedusting dust <(>&<)> debris also to be provided as per the requirement. 24. in case slag granulation system breakdown or maintenance slag will be diverted to dry pit. to manage dry pit during that time is challenging, additional excavator breaker is also required. 25. in case of furnace problem, we need to take hot metal in dry pit for sometimes. volvo breakers may be required for removing solidified metal jam from dry pit. 26. need to maintain and safe drainage system of sgp. 27. based on requirement need to weighment of loaded vehicle whenever ask by area in charge for verification. 28. equipment and manpower safety will be in vendor scope. 29. entire sgp area housekeeping is to be taken care by vendor. weight assessment: · loading <(>&<)> shifting of slag the weight required for the billing page 10 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details purpose shall be technically assessed and cross verified by our corex department, based on the slag production report generated by our technical control group from the raw material charged to the furnace. if once the weighting system started billing will proceed as per actual weighment. · loading of slag: bill quantity certified as per secondary sales weighments. · the actual quantity may vary every month depending on the domestic sales. the contractor must ensure a proper evacuation plan from the source based on actual condition. however, for planning purposes a monthly forecast will be given by the secondary sales department. · list of equipment based on previous experience. sl no types of equip.capacity/title no. of equipment’s req. remarks 1 excavator ex200 2 1.to clean ponds and to make heap at chute area 2.loading 0f g and d slag 3.drypit cleaning 4.stand by required in case of breakdown 2 loader 950 1 to load slag to dumpers 3 dumpers 25t 12 dry slag and g slag shifting b. safety the driver should wear the safety belt while driving the vehicles. 1. your vehicle should have a reverse horn. 2. your drivers shall maintain the vehicle speed limit as per company rules. 3. in case your persons are engaged in working in hot zone area, you should provide them with heat resistance suits approved jeans jacket, cotton shirt, and cotton underwear <(>&<)> cotton socks, gum boots. 4. you shall deploy adequately trained and experienced personnel and equipment’s for ensuring smooth operation round the clock. 5. you shall engage the vehicles (with valid rto documents) with drivers having a valid driving license. the driver and cleaner should be deployed in such a manner to ensure availability of resources whenever required and each person employed does not have more than 12 hours working duration. 6. you shall take necessary safety precautions while loading <(>&<)> shifting the material as required by the user dept. 7. the tyres of vehicles should not be worn out. 8. the vehicle name plate, lighting systems including side blinkers shall be maintained without fail. 9. being the restricted area due to hot handling conditions, you shall not load other than your vehicles at the loading point. if any, you will be penalized heavily. 10. during clarifier <(>&<)> settling pond cleaning hot water may spread in vehicle movement area, so at that time ensure no movement of person on ground. 11. equipment and manpower safety will be in vendor scope. 12. operators need to maintain vehicle checklists throughout the month. 13. if any glass is found broken, it must be replaced immediately. 14. vehicle safety should be maintained according to the specifications outlined in table no 1. 15. vendor need to follow sop <(>&<)> hirac of dry pit cleaning, pond cleaning <(>&<)> slag shifting at the time of wo for understanding the specific job and accordingly you workforce to be trained. 15.emergency preparedness: · emergency response training: ensure all operators and drivers are trained in emergency response procedures, particularly for situations involving hot slag or equipment failure. · first aid kits and emergency equipment: require that all vehicles and work sites have fully stocked first aid kits and fire extinguishers. 16.hazard communication: page 11 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details · signage and barricading: clearly mark and barricade areas where slag loading and shifting occur, particularly in hot zones or near the clarifier and settling ponds. · communication devices: equip all personnel with communication devices to ensure immediate contact in case of an emergency. 17.load securing: · proper securing of slag: ensure that slag is securely loaded and covered during transportation to prevent spillage, particularly when transporting to export yards. · regular inspection: implement a protocol for regular checks to ensure that the load is properly secured throughout the transport process. 18.heat stress prevention: · rest breaks and hydration: ensure that workers operating in high temperature environments, such as near hot slag, have scheduled r est breaks and access to hydration to prevent heat stress. · cooling zones: if feasible, provide shaded or cooled areas where workers can take breaks to lower their body temperature. 19.maintenance and inspection protocols: · regular equipment maintenance: include specific guidelines for the frequency and scope of maintenance checks on all vehicles and equipment, beyond just the monthly vehicle checklist. · pre shift inspections: require pre shift inspections of all equipment to ensure operational safety and to prevent breakdowns during slag shifting operations. 20.traffic management: · designated routes: establish designated routes for vehicles transporting slag within the plant to minimize interactions with other plant operations and reduce the risk of accidents. · traffic controllers: consider deploying traffic controllers or spotters in areas with high vehicle movement to ensure safe navigation and loading operations. 21.behavioral safety: · safety incentives and penalties: implement a system of incentives for maintaining safety standards and penalties for violations, encouraging a culture of safety among all personnel. a. fatigue management: beyond the 12 hour work limit, consider implementing a system to monitor signs of fatigue among drivers and o perators to prevent accidents. movement of manpower / associates at our hazira site. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. · vendors must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. · vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is used for processing the gate pass. contractual equipment shall be equipped with safety devices are in working condition as per oem standard and am/ns india requirements as shown in table. s.no date:13.08.2025 safety devices dumper excavator wheel loader 1 gps system from vendor approved by am/ns. 2 prestart alarm 3 seat belt for driver 4 seat belt for co passengers 5 head lights page 12 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 6 side indicators 7 parking light 8 brake light 9 front main horn 10 backup alarm/reverse alarm 11 revolving light/beacons 12 rear view side mirrors as per oem recommendations 13 rear view camera 14 reverse proximity sensor with warning system 15 wipers 16 fire extinguisher for heavy equipment category 9kg, medium equipment 6kg and light vehicle 2kg 17 parking/hand brake 18 load test certificate (form 10 third party) 19 forklift blue spot light/safety pedestrian lights 20 red zone warning light for forklift 21 over hoist limit switch 22 safe load indicator (sli) 23 marching alarm 24 boom control system warning 25 platform capacity indiactor c. statutory <(>&<)> general requirements: 2. owner / site in charge compulsory attend monthly department contractor meeting. 3. need to maintain attendance system for all manpower and supervisors as per company rules, more than 9 days duty not allowed. 4. no manpower allowed to duty more than 16 hours per day. 5. regular inspection <(>&<)> vehicle checklist to be maintained by all equipment operators and submitted monthly. 6. all equipment’s need to available in fit and fine condition at corex site. 7. when billing, submit scrum report of operator for attendance verification. 8. the contractor shall provide the equipment and operators as per land of law (e.g., rto laws <(>&<)> fitness) and company policies (e.g., safety certification <(>&<)> competency training). 9. all equipment must be following all applicable rto, central, state, and local govt rules <(>&<)> regulations. 10. vendor must ensure wsa policy and group insurance for their manpower. 11. vendor must have technical and operational competence to provide required services. 12. vendor must have work experience in heavy industries such as large steel plant, cement, mining or port operations. 13. vendor must comply with all relevant local, state regulations, including health and safety standards. 14. vendor must have sufficient fleet to allocate sufficient resources, including manpower, equipment, to meet plant requirements. 15. manpower should be competent as per competency matrix as per latest msa of amns. 16. equipment manufacturing year must be 2018 or later (equipment of manufacturing year before 2018 will not be allowed) and it should be in good working condition. any decision regarding acceptance of equipment of yom earlier than 2018 will be taken by amns only in exceptional cases. 17. equipment should be ready to deploy / make operational at our site by 1st jan 2025. however, the exact date of mobilization would be communicated 7 days in advance. contract period from 1st jan 2025 to page 13 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 31st dec 2025. 18. final vehicle check will be done by amns hse department, equipment fitness <(>&<)> ppes will be checked every month by amns india user department. 19. gps system must be installed in all tippers/dumpers from common vendor which is approved by am/ns india. 20. all equipment needs to be deployed from 07:00 am to 07:00 pm for day shift <(>&<)> 07:00 pm to 07:00 am for night shift. all equipment operators must be relieved on a one to one basis. 21. to avoid production loss, equipment must be maintained in healthy condition for readiness for shutdown activities <(>&<)> regular work to complete in stipulated time. 22. necessary attachment needs to be provided with equipment as per operational requirement as per site visit. 23. in case of special attachment vendor to keep provision of various fittings <(>&<)> adaptors in advance for fitment in vehicle. vehicle must be suitable for work at the amns site it has to be deployed. 24. the contractor shall provide the specified equipment in healthy condition with skilled operators as per company policies. 25. the contractor shall deploy alternate equipment same specification or above in case of any breakdown above 48hrs duration. 26.compliance with labor laws: a. registration under the contract labour (regulation <(>&<)> abolition) act, 1970: ensure that the vendor is registered under this act, as it governs the employment of contract labor in certain establishments. b. payment of wages act, 1936 compliance: the vendor must comply with the payment of wages act, ensuring timely and complete payment to workers without unauthorized deductions. c. employees’ provident fund (epf) and miscellaneous provisions act, 1952: ensure that all eligible workers are covered under epf, and contributions are made regularly. 27.compliance with environmental regulations: d. adherence to the environmental protection act, 1986: the vendor must ensure compliance with all relevant environmental regulations, including waste management, air and water pollution controls. e. hazardous waste management: specific compliance with the hazardous and other wastes (management and transboundary movement) rules, 2016, should be enforced, particularly regarding the handling, transportation, and disposal of slag and other industrial waste. 28.health and safety regulations: f. factories act, 1948 compliance: the vendor must comply with all provisions under the factories act, including provisions related to worker safety, health, and welfare, especially in hazardous environments. g. mandatory safety audits: periodic safety audits conducted by accredited agencies should be mandated to ensure ongoing compliance with safety standards. 29.insurance and liability: h. employees’ state insurance act, 1948: the vendor must ensure that all workers are covered under the esi act, providing medical and cash benefits in case of sickness, maternity, and employment injury. i. public liability insurance act, 1991: ensure that the vendor has adequate public liability insurance to cover any potential claims arising from accidents or environmental damage during operations. 30.vehicle and equipment compliance: j. motor vehicles act, 1988 compliance: all vehicles used by the vendor must adhere to the latest provisions of the motor vehicles act, including insurance, fitness certification, pollution control, and registration requirements. k. periodic vehicle fitness certification: in addition to regular inspections, it should be mandatory for all vehicles to undergo fitness certification by an authorized rto, as per the motor vehicles act. l. installation of speed governors: for heavy vehicles, ensure that speed governors are installed and maintained as per the central motor vehicles rules, 1989. 31.compliance with building and other construction workers (regulation of employment and conditions of service) act, 1996 (if applicable): page 14 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details m. ensure that any construction related activities comply with this act, which mandates safety, health, and welfare measures for workers involved in building and construction work. 32.periodic compliance reporting: n. monthly compliance reports: the vendor should submit a monthly compliance report covering adherence to all statutory and regulatory requirements, including labor laws, environmental regulations, and safety standards. o. third party verification: consider requiring third party audits to verify compliance with statutory requirements, especially for environmental and safety regulations. 33.contractor licensing: p. obtaining necessary licenses: the vendor must obtain all necessary licenses and permits required for the operation, including labor licenses, environmental clearances, and equipment operation permits. d. penalty specific penalty for nonperformance by vendor and must be cardinally measured. 1. a penalty will be imposed in case of noncompliance with hse norms <(>&<)> non conformity of work. 2. delay in dry pit cleaning or dry slag accumulation of more than 2000 tons. 3. more than 2 incidents of slag chute jam per month or granulated slag accumulation of more than 4000 tons 4. violation of any safety norms will be penalized to the contractor. 5. sleeping case of associates with penalty of minimum amount decided by phse if same case repeated the associates will be suspended or terminated by furnace in charges/operation head/hod. 6. misbehavior of contractor associate with area engineers/manager will be penalized/ suspended or terminated by furnace in charges/operation head/hod. 7. violation of company traffic rules will be penalized. 8. as per management directive, transport / movement of associates to <(>&<)> fro for plant should be mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. 9. penalties for statutory non compliance: a. non compliance with labor laws: for any instance of non compliance with labor laws (e.g., non payment of wages, violation of working hour limits), a penalty equal to the number of unpaid wages plus a 50% surcharge will be imposed. repeated offenses may lead to contract termination. b. failure to comply with provident fund/esi regulations: if the vendor fails to make timely contributions to epf or esi, a penalty of 2% of the total contract value per incident will be imposed, and the company reserves the right to withhold payments until compliance is achieved. c. violation of environmental regulations: any breach of environmental regulations, such as improper disposal of slag or failure to comply with pollution control norms, will result in a penalty of inr 1,00,000 per incident, with repeated violations leading to contract termination. 10. penalties for vehicle and equipment non compliance: a. non compliance with rto and motor vehicle laws: if any vehicle is found operating without valid rto documentation, fitness certification, or pollution control certificate, a penalty of inr 50,000 per vehicle will be imposed. additionally, the vendor must rectify the issue within 24 hours, failing which further penalties will be applied. b. failure to maintain equipment standards: if equipment is found to be non compliant with safety standards or in poor condition, a penalty of inr 20,000 per piece of equipment will be imposed, and the equipment must be replaced within 48 hours to avoid further penalties. 11. penalties for safety non compliance: a. lack of ppe or safety equipment: if workers are found without proper ppe or safety equipment, a penalty of inr 10,000 per incident will be page 15 of 15 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119660 date 02.09.2024 submission date 12.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null nayana padhiar contact email nayana.padhiar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details imposed. repeated violations will result in a doubling of the penalty and possible suspension of the offending worker. b. failure to conduct safety audits: if the vendor fails to conduct required safety audits or submit safety reports, a penalty of inr 50,000 per missed audit will be imposed, with additional penalties for any safety violations discovered during subsequent audits. c. non compliance with emergency preparedness: if the vendor is found unprepared for emergencies (e.g., lack of first aid kits, inadequate fire extinguishers), a penalty of inr 25,000 per incident will be imposed, with immediate corrective actions required. 12. penalties for inadequate training and competence: a. untrained or incompetent personnel: if any worker is found to lack the necessary training or competence as per the competency matrix, a penalty of inr 5,000 per worker per day will be imposed until the issue is rectified. this also applies if operators are found without valid certification or training. b. failure to maintain attendance and work hours: if the vendor fails to adhere to the attendance system or work hour limits, a penalty of inr 10 ,000 per worker per incident will be imposed, with the potential for further penalties if noncompliance continues. 13. penalties for reporting and documentation failures: a. failure to submit required documentation: a penalty of inr 5,000 per day will be imposed for each day that required statutory, safety, or operational documentation (e.g., vehicle checklists, compliance reports) is delayed or incomplete. b. false or misleading documentation: if the vendor is found to have submitted false or misleading documentation, a penalty of inr 50,000 will be imposed per incident, with possible legal action and contract termination for severe cases. scope of work amns india: · supervising of operational works....

Department Of Education - Gujarat

44808589 tender for non comprehensive annual maintenance contract for repairing of committee school./office autobell system/biometric attendance system....

Arcelor Mittal Nippon Steel India Limited - Gujarat

44131868 tender for spr 2000143822 capital s/d jobs csp caster 1 2 3, smp 2 2000143822 10 10 20 scraping of old paint & surface cleaning 3,000 m2 30 application of two coat epoxy paint 3,000 m2 10 sand blasting & painting 3,000 to email : hardik.joshi@amns.in contact : name : hardik joshi item details : scope of work spr no: 2000143822 line item 10 service: capital shut down jobs for csp casters, smp 2. scope of work vendor: slag blasting, cleaning & painting: 1. all required equipment’s / skilled manpower for sand blasting & painting job must be provided by vendor. 2. sand / slag blasting machines, compressors & related equipment’s like spray gun with operator with all transportation will be provided by vendor minimum 3 4 sets as per requirements. 3. sand / slag required for blasting with all transportation will be provided by vendor. 4. 3 4 compressor / spray machine for painting will be provided by vendor with all transportation as per department requirement. 5. all scale /sand/slag to be cleaned during shutdown from continuous casting machine, torch cutting machine fume tunnel and tunnel connecting scale pit. 6. small items like wire, wire brush, pawda, belcha, tagara, paint brush, rollers for cleaning & painting to be provided by vendor. 7. required all safety items / ppes for workers to be provided by contractor. 8. supervisor to be provided by contractor during work on 24 hours basis of 12 12 hours shift. 9. any labor and supervisor cannot go from working area without permission of machine in charge and shift in charge of caster operation. 10. vendor must finish/complete all the jobs of slag blasting, painting & scale cleaning / machine cleaning job in given time periods. 11. vendor must provide slag blasting compressor with such a capacity that at least 4 parallel slags blasting line / oprn continues in 2 machines with adequate manpower. 12. before slag blasting job, water cleaning, chipping work must be done by vendor will be inspected by engineer. 13. 2 coats of colter primer of 200 micron each & 1 coat of finish paint of 50 micron each to be applied on slag blasted area inside, outside & wherever required. 14. diesel for compressor will be in vendor scope. 15. manpower should be competent as per competency matrix as per latest msa. 16. wsa & group insurance policy 17. following company rules and regulation provided by am/ns management time to time related to safety hse and other rules and regulation. 18. all associates attendance, salary, invoice related data, scrum attendance system tracking and request generation for attendance regularization in scrum system as and when required. (if applicable) 19.transportation bus facility to be provided to manpower. safety • contractor shall fulfil all safety and environment rules as per guidelines of am/ns safety department. page 2 of 2 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116472 date 09.07.2024 submission date 16.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • contractor shall provide following safety gears with specifications approved by am/ns to his work force: 1. safety helmet. 2. safety shoes. 3. safety jacket (as per am/ns standard). 4. safety goggles 5. hand gloves. 6. safety belts 7. any additional safety gears as requested by am/ns india. scope of work am/ns india: 1. all work permits, electrical connection, work instruction will be provided by am/ns. 2. all required paints & thinners will be provided by am/ns for painting job. 3. specific penalty for non performance by vendor and must be strictly measured. 4. penalty will be imposed in case of non compliance / violation of hse norms and supervisor incompetency. ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

42914846 tender for spr 27019732 qaqc 27019732 10 10 30 inst. hard drive & configuration of nvr 1 no 220 installation of accessories 30 le 70 inst. & comm. for wireless system 12 no 20 inst. of new cctv camera & configuration 27 no 150 end to end data termination 237 no 200 pvc pipe / casing cap laying work 1,100 m 100 fiber cores liu termination 4 no 210 device & cable marking & ferruling 474 lo 90 installation of junction box 36 no 270 installation of accessories 1 le 120 ofc testing with otdr 96 no 50 inst&config.web mngd poe network switch 13 no 170 network rack 15 u 5 no 110 fo splicing charges 96 no 40 installation of camera housing and stand 36 no 250 installation of accessories 35 le 10 installation & config of attendance sys 1 no 240 installation of accessories 15 le 160 utp cat 6 information outlet jack 10 no 60 inst&config.web mngd poe network switch 1 no 80 fiber laying 2,000 m 130 utp cable laying 16,775 m 140 execution of utp nodes 250 no 180 installation of network rack 1 no 190 hdpe pipe laying 2,000 m 230 installation of accessories 10 le 260 installation of accessories 50 le email : harsh.yadav@amns.in contact : name : harsh yadav item details : scope of work for network <(>&<)> cctv passive installation scope of work – [ network passive works] scope of work – qty service description unit qty fiber cable laying mtr. 2000 24f liu installation charges nos. 4 fiber core splicing charges nos. 96 otdr testing of fiber core nos. 96 cat6 utp cable laying charges mtr. 16775 face plate and back box installation charges nos. 250 cat6 io punching charges nos. 237 24 port loaded patch panel and cable manager nos. 10 9u/15u rack installation and dressing nos. 5 42u rack installation and dressing nos. 1 hdpe pipe laying work nos. 2000 25mm cassing capping, flexible pipe,pvc pipe charges nos. 1100 cat6 cable ferruling and tagging and rack side patch cord tagging nos. 474 25mm pvc conduit accessories (l, t, joint) nos. 30 25mm metal saddle of 100 pcs (without base) box. 10 35x8 metal screw packet of 100pcs packet 15 pvc grip packet of 100pcs packet 35 tap roll roll 50 bugle head black drywall screw, size: 3.5 x 25mm 1000pcs nos. 1 dedicated supervisor on site with technical team, vendor should have vast experience of passive networking job (minimum 15 years) daily <(>&<)> weekly project report and complete governance 1. cable pulling <(>&<)> fixing on cable tray/ conduits. 2. labeling, cable termination <(>&<)> cable routing / dressing at rack / end points. 3. label the cables, apply ferruling as per numbering scheme, test them <(>&<)> maintain detailed reports for same. 4. terminate the internal cables in wiring block, data cable in jack panel using standard tools as per structured cabling standards. 5. test the node using wire scope. 6. each node will be tested against all required structured cabling standards. results of same shall be in acceptable window as specified by standards. 7. cable tag tie mandatory on each utp cable connected to switch port for identification purpose 8. proper dressing of all the utp cables in the rack 9. require proper clamping of utp cables / casing capping where tray / conduits are not available. 10 fixing of power outlets/spike busters for switches and other network equipment in the it room. 10. removing unused connections from switch/hub hence making ports free on the switch/hub 11. shifting of cabling components from stores to it. 12. helping amns network engineers for carrying out tests or page 2 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000108251 date 13.03.2024 submission date 23.03.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details installation of new equipment. 13. best efforts will be put to maintain minimum network down time. 14. utp <(>&<)> fiber laying 15. hdpe pipe laying 16. fiber cores splicing <(>&<)> testing 17. fiber otdr test result 18. racks installation 19. network devices installation (switch, router, firewall etc) 20. liu installation 21. jack panel <(>&<)> cable manager installation 22. faceplate, gang box and i/o termination the work shall consist of the following: establishing a new communications closet for the building in the space identified installation and termination of category 6 network cabling at identified drop locations labeling and documentation of installed cable plant category 6 certification testing and test results installation of single mode 24 strand count fiber between rack (including rack mount ftp) and existing building demarcation point (including wall mount ftp). terminations will be sc type. removal and demolition of pre existing network cable post migration cabling guidelines o all network drops shall consist of category 6 cable, jacks, and patch panels. o the pin out for all drops is to be 568a. o cable distance shall not exceed 90 meters (300 ft.) o a 10 ft. service loop will be provided within 10 ft. of each termination. o a minimum bend radius of 1 inch shall be respected for all cabling. o a maximum bundle size of 24 cables shall be respected. o each drop will make use of a blue keystone termination and appropriate faceplate. o patch panels shall be cat 6 rated labeling and documentation a six character labeling scheme, referred to as jack id hereafter, shall be used for all network drops as follows: a single letter, a z indicating the network closet a numerical digit 0 9 indicating the floor (e.g. 1 for first floor) a three digit numerical identifier representing the wall or biscuit box for the drop a single letter a z indicating the individual jack within the wall box or biscuit. when a box provides multiple jacks, jacks are to be ordered left to right, top to bottom, like reading a book. no punctuation shall be used. example identifiers: a1001a, a1001b, a1002a ... a2001a. for each cable the jack id shall appear using printed permanent labeling in 4 locations: each end of the cable within 1 ft. of termination. above each patch panel port on the box or faceplate of the drop, once, omitting the jack letter (e.g. a1001 rather than a1001a and a1001b). a cut sheet of jack id to room number mappings will be provided as a deliverable in electronic form. an as built floor plan with drop locations will be provided in electronic form (cad or pdf). page 3 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000108251 date 13.03.2024 submission date 23.03.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details test results will be labeled using the jack id and provided as a single report. test results will include a pass fail summary followed be detailed test results for each jack id. testing testing of all newly installed cable channels shall be performed prior to system cutover. 5.1 copper testing all category 6a field testing shall be performed with a fluke networks dtx 1800 tester or better. all balanced twisted pair backbone cables exceeding 90 m (295 ft) or 100 m (328 ft) shall be 100% tested for continuity if applicant’s assurance is not required. category 6a balanced twisted pair horizontal and backbone cables, whose length does not exceed 90 m (295 ft) for the basic link, and 100 m (328 ft) for the channel shall be 100 percent tested according to ansi/tia/eia 568 b.1. test parameters include wire map plus sctp shield continuity (when present), length, next loss (pair to pair), next loss (power sum), elfext loss (pair to pair), elfext loss (power sum), return loss, insertion loss, propagation delay, and delay skew. fiber optic testing horizontal fiber testing fiber horizontal cables shall be 100% tested for insertion loss and length insertion loss shall be tested at 850 nm or 1300 nm for 50/125 m and 62.5/125 m multimode cabling in at least one direction using the method b (1 jumper) test procedure as specified in ansi/tia/eia 526 14a. the horizontal link must be guaranteed to meet 10g base fl performance requirements. administration <(>&<)> documentation labeling all cables shall be labeled at each end. the cable or its label shall be marked with its identifier. a unique identifier shall be marked on each faceplate to identify it as connecting hardware. each port in the faceplate shall be labeled with its identifier. each port on the connecting hardware shall be labeled with its identifier. drawings as built drawings shall be supplied by the contractor showing the locations of and identifiers for all: horizontal cable routing and terminations data outlets/connectors backbone cable routing and terminations records and reports all records shall be created by the installation contractor and turned over at the completion of work the format shall be computer based and both soft copies and hard copies shall be part of the as built package. the minimum requirements include: page 4 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000108251 date 13.03.2024 submission date 23.03.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details cable records must contain the identifier, cable type, termination positions at both ends, splice information as well as any damaged pairs/conductors. connecting hardware and connecting hardware position records must contain the identifier, type, damaged position numbers, and references to the cable identifier attached to it. test documentation on all cable types shall be included as part of the as built package. all reports shall be generated from the computer based program used to create the records above. these reports should include but not limited to: cable reports cross connect reports connecting hardware reports scope of work of wifi <(>&<)> switches l2<(>&<)> l3 device installation hazira location as per our understanding, we are required to provide installation and support services for cisco switches l2 <(>&<)> l3 wifi aruba. please find standard scope of work as per below. switches l2 <(>&<)> l3 • total 14 network switches installation • rack and stack of switches • post and firmware check/upgrade, cisco contract confirmation • configuration of management accounts and hardening of device for security • stacking of core and access switches • vlan configuration on core and access and trunk links • sfp installation • intervlan routing, static routes configuration if required • configuration of etherchannel towards uplinks • configuration, testing of stp for loop avoidance • configuration of common ntp server for all devices aruba wireless: • power on self test for all ap • license activation for access points and aruba contract confirmation • configuration of master ap and join remaining ap to same single cluster • configuration of multiple ssid with specific vlan • configuration of wireless roaming • radius config if requested for authentication • configuration of acl if required • configuration of static routes as per required • documentation following is bill of material where above scope of work is applicable. cisco switches l2 13 cisco/c9200l 24t 4g e and cisco/c1000 24fp 4g l cisco switches l3 1 cisco/c9500 16x a aruba ap 515 12 wi fi access point documentations: all configuration details of each device details topology diagram ip segment details o data o voice / video page 5 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000108251 date 13.03.2024 submission date 23.03.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details o management all configured device inventory details network connectivity diagram with port wise testing document of network switches in redundancy scope of work for cctv installation scope of work cctv cctv installation, testing <(>&<)> commissioning services active devices following is bill of material where above scope of work is applicable. service description unit qty dome/bullet camera installation <(>&<)> implementation charges nos 27 nvr configuration <(>&<)> installation charges nos 01 fabrication stand for cctv jb <(>&<)> pvc junction box fixing nos 36 43 inch 24x7 commercial display nos 01 dedicated supervisor on site with technical team, vendor should have vast experience of passive networking and cctv job (minimum 15 years) daily <(>&<)> weekly project report and complete governance. 1. labeling, cable termination <(>&<)> cable routing / dressing at rack / end points. 2. label the cables, apply ferruling as per numbering scheme, test them <(>&<)> maintain detailed reports for same. 3. cable tag tie mandatory on each utp cable connected to switch port for identification purpose. 4. proper dressing of all the utp cables in the rack 10 fixing of power outlets/spike busters for switches and other network equipment in the it room. 5. removing unused connections from switch/hub hence making ports free on the switch/hub 6. shifting of cabling components from stores to it. 7. helping amns network engineers for carrying out tests or installation of new equipment. 8. network devices installation (switch, nvr, camera etc) 9. cctv <(>&<)> nvr, switches installation <(>&<)> inventory details. 10. site acceptance test final documentation <(>&<)> cctv camera network drawing to mentioned camera <(>&<)> switches ip address detail. labeling and documentation. for each cable the jack id shall appear using printed permanent labeling in camera end <(>&<)> switch end all locations: each end of the cable within 1 ft. of termination. above each patch panel port records and reports all records shall be created by the installation contractor and turned over at the completion of work. the format shall be computer based and both soft copies and hard copies shall. scope of work for av system setup for hazira location as per our understanding, we are required to provide installation services for av system setup at hazira location. please find standard scope of work as per below. (3 months post material delivery) 1.unpacking and verification of condition of all av system asset. page 6 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000108251 date 13.03.2024 submission date 23.03.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 2. securing the mounting bracket to standard wall frame or masonry wall / floor stand. 3. mounting and securing the av setup. 4. connection of av setup to pre existing power source and audio/video feed. 5. power cables will be concealed by using track molding and neats wire management system. 6. connection and configuration of existing video and/or audio components provided by customer in the same room 7. moving all packing material to a customer designated location in the immediate vicinity. 8. demonstration of av system remote control to amns authorities. 9. share to all av setup credentials etc. windows logging, wifi ssid, screen key, ip address. 10. sign off on the av installation is completed <(>&<)> as well sop require etc tv <(>&<)> ops, video conferencing room, wireless solstice pod gen 3. 11. user manual guide and ppt photos of conference room. 12. need to provide all setup drawing to amns authorities 13. completed installation report <(>&<)> inventory of av system. installation qty description make model uom qty smart interactive 4k display | size: 75 newline q75 no 1 display trolly lumi t1035l no 1 built in 4k ultra hd camera with 4x digital zoom clearone versa mediabar no 1 ops : i5 10 gen, 8 gb ,128 gb, windows 10 pro newline newline no 1 attendance system installation scope of work scope of including: • vendor shall install and commission acs controllers, biometric readers, hid readers. • vendors shall make supervision of cable laying as per guidelines. • vendor shall install the morpho manager application in workstation and give training to amns person for user enrolment. • vendor shall add all controllers to the central attendance system at hazira. • vendor make sure that all user’s attendance retrieve from the central attendance system and submits attendance report to eic. • testing, observations <(>&<)> remaining work if any in vendor scope. • contractor shall follow the safety rules of amns. • engineers and their staff will complete the work permit process before starting the work and start work with proper ppe. • the contractor shall report to amns engineer before carrying out the site activities. • enrollment of all the users in new system with configuration, testing • onsite support till the system is stabilized and working completely. scope excluding: • laying of all cables (cat – 8, 6 core, power cable) from controllers to readers will be vendor scope. • if any structure is required to mount the readers will be in amns scope. • to provide the ups power at controller’s locations. • to provide the workstation for the morpho manager application. • to add the fingerprint templet in the morpho manager application, however, vendor will give training to deputed person. project completion • project sign off certificate • project report • scope of work is applicable qty. amc2 door controller 4 nos page 7 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000108251 date 13.03.2024 submission date 23.03.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details amc enclosure with 1 din rail 4 nos amc power supply unit 4 nos signo 20 model with standard credential profile (attendance <(>&<)> door access reader) attendance <(>&<)> door access reader 16 nos 8 core 0.5 sq mm aluminum shielded cable 1500 mtr lock, electromagnetic,205x5x25, electronic electro magnetic lock with power 15 nos switch, pushbutton,1no1nc,24v,5a,50hz 15 nos hdpe pipe laying work 1500mtr license for 32 doors ( need to activate existing bis server system ) 32 nos license for bis xace 32dr*, 1yr 1 nos line item wise scope: 1) attendance and door access services 3011605 installation <(>&<)> config of attendance sys, bosch make 1 no. license for 32 doors bis xace 32dr49 bosch 1 no. license for bis xace 32dr*, 1yr bis sma 32dr bosch 1 no. hdpe pipe laying work 1500 mtr2) cctv active device new cctv camera installtion <(>&<)> implementation of active devices 3011893 dome/bullet camera installation <(>&<)> implementation charges 27 no 3012708 nvr configuration <(>&<)> installation charges 1 no 3012647 fabrication stand for cctv jb <(>&<)> pvc junction box fixing 36 no 3)network <(>&<)> wifi active device nework <(>&<)> wifi,printer installtion <(>&<)> configuration of active devices 3012709 switch installation <(>&<)> implementation charges 13 no 3012709 core switch installation <(>&<)> implementation charges 1 no 3012657 wireless ap installation <(>&<)> implementation charges 12 no 4)network and cctv passive service: service of passive work network <(>&<)> cctv 3012475 24 core fiber cable laying charges 2000 mtr 3001698 pvc junction box and fabrication stand, jb installation charges of cctv camera 36 no 3012478 24f liu installation charges 4 no 3012656 fiber core splicing charges 96 nos. 3011796 otdr testing of fiber core 96 nos. 3012477 cat6 cable laying charges 16775 mtr. 3003920 face plate and back box installation charges 250 nos. 3012476 cat6 io punching charges 237 nos. 3008064 24 port loaded patch panel and cable manager 10 nos. 3008063 9u/15u rack installation and dressing 5 nos. 3012651 42u rack installation and dressing 1 nos. 3012474 hdpe pipe laying work 2000 nos. 3012772 25mm cassing capping, flexible pipe,pvc pipe charges 1100 nos. 3011898 cat6 cable ferruling and tagging and rack side patch cord tagging 474 nos. 3002136 25mm pvc conduit accessories (l, t, joint) 30 nos. 3002136 25mm metal saddle of 100 pcs (without base) 10 box. 3002136 35x8 metal screw packet of 100pcs 15 packet 3002136 pvc grip packet of 100pcs 35 packet 3002136 tap roll 50 roll 3002136 bugle head black drywall screw,size: 3.5 x 25mm 1000pcs 1 n...

Surat Municipal Corporation - Gujarat

42867895 bid for supply, installation, testing and commissioning of centralized school management system and smart facial recognition biometric attendance system...

Surat Municipal Corporation - Gujarat

42857771 tender for supply, installation, testing and commissioning of centralized school management system and smart facial recognition biometric attendance system...

Employees State Insurance Corporation - Gujarat

42485301 bids are invited for all in one printer with duplex printing , dual sided laser printer , ups 1kva offline , office suite software micrsoft standard 2021 , anti virus , layer 2 access switch cisco 9200 , unmanaged giga 8 port switch , biometric attendance system , single function laser printer total quantity : 121...

Department Of Education - Gujarat

41962313 bids are invited for sitc of audio video recording system sitc of touch panel sitc of touch panel sitc of touch panel sitc of attendance system total quantity : 5...

Employees State Insurance Corporation - Gujarat

41720158 bids are invited for it peripherals all in one printer with duplex printing , dual sided laser printer , ups 1kva offline , office suite software micrsoft standard 2021 , anti virus , layer 2 access switch cisco 9200 , unmanaged giga 8 port switch , biometric attendance system , single function laser printer total quantity : 121...

Surat Municipal Corporation - Gujarat

41709952 tender for supply, installation, testing and commissioning of centralized school management system and smart facial recognition biometric attendance system...

Surat Municipal Corporation - Gujarat

41676945 bid for supply, installation, testing and commissioning of centralized school management system and smart facial recognition biometric attendance system...

Arcelor Mittal Nippon Steel India Limited - Gujarat

40523323 tender for spr 2000143791&2000142065 lancing facility in caster and smp 2000143791 10 10 10 providing services of lancer 8,760 std 20 providing services of rigger 17,520 std email : hardik.joshi@amns.in contact : name : hardik joshi item details : scope of work spr no: 2000143791 line item 10 & 20. service: tundish skull cleaning, cutting & shaping by lancing & cutting csp & ini slab caster 4, smp2. scope of work: vendor: 1. shifting of tundish skull from tundish tilter to cutting area as designated. 2. cutting / lancing of tundish skull. 3. cooling of tundish skull with the help of water & air. 4. shifting of tundish skull by dumper to scrap yard / designated area (for weighment and back to smp / new crrs). 5. maintaining cutting/lancing equipment’s in good condition. 6. maintaining safety & housekeeping of work area. 7. cutting and lancing of slabs in machine / rot area in emergency at tunnel furnace, as and when required at csp caster, smp2. 8. cutting and lancing of slab in casting machine / tcm rot and tunnel area during breakout and /or during process abnormalities as and when required at csp <(>&<)>ini caster, smp2. 9. cutting of used tundish sen solid pipe. 10. launder cleaning on casting platform and other misc. jobs. 11. refractory garbage removal from tilter area at csp, ini & new crrs area. 12. above 10 tons skull cutting at caster. 13. refractory cover & refractory heat shield breakage through breaker. 14. chopping plate, scrap & plant consumable garbage loading in dumper. 15. garbage unloading at nand niketan or designated area from site through dumper. 16. two rigger & one lancer should be available / shift for csp caster & one rigger & one lancer should be available/shift for ini caster at crrs & caster area as per requirement on 12 hours duty basis day & night. 17. tilting & cleaning of slag box, launder & tundish emergency bucket & placed at designated area. 18. head, tail & sample piece of slab loading in dumper. 19. burr bucket to be emptied in dumper. 20. hole made in every tundish skull by lancing for lifting with chain sling. 21. remote crane operating at csp caster himself for designated job. 22. loader arrange for cleaning of tilter area & garbage loading in dumper from ferro store or smp. 23. maximum working time not more than twelve hours of any manpower. 24. maintaining safety & housekeeping of tilter & surrounding work area at crrs & caster. 25. manpower should be competent as per competency matrix as per latest msa. 26. wsa & group insurance policy 27. following company rules and regulations provided by am/ns management time to time related to safety hse and other rules and regulation. 28. all associates attendance, salary, invoice related data, scrum attendance system tracking and request generation for attendance regularization in scrum system as and when required 29.transportation bus facility to be provided to manpower. manpower: (02 shift operation, i.e.: 12 hrs/day * 2 shift) total lancers: (1x4) = 4 nos. (2 nos. csp caster + 2 nos.ini caster) total riggers: (1x6) = 6 nos. (4 nos. csp caster + 2 nos.ini caster) total: 10 nos. of manpower/day for csp & ini caster, smp 2. safety: contractor shall provide following safety gears with specifications approved by am/ns india: 1. safety helmet: (color will be provided by am/ns india) 2. safety shoes. 3. safety jacket (as per amns india standards). 4. dust mask 5. safety goggles 6. hand gloves. 7. ear plug / earmuff 8. contractor shall fulfill all safety and environment rules as per guidelines of safety department. housekeeping: contractor should be responsible for housekeeping job of respective area. scope of work am/ns india: 1. 15 mm lancing pipe will be provided by am/ns india. 2. gas, oxygen, da, ng & equipment required for lancing, cutting & shifting will be provided by am/ns india. 3. work permits and all tools’ tackles will be provided by am/ns india. 4. specific penalty for nonperformance by vendor and must be strictly measured. 5. penalty will be imposed in case of noncompliance / violation of hse norms and supervisor incompetency. item note : 2 2000143791 20 20 10 providing services of lancer 8,760 std 20 providing services of rigger 8,760 std email : hardik.joshi@amns.in contact : name : hardik joshi item details : scope of work spr no: 2000143791 line item 10 & 20. service: tundish skull cleaning, cutting & shaping by lancing & cutting csp & ini slab caster 4, smp2. scope of work: vendor: 1. shifting of tundish skull from tundish tilter to cutting area as designated. 2. cutting / lancing of tundish skull. 3. cooling of tundish skull with the help of water & air. 4. shifting of tundish skull by dumper to scrap yard / designated area (for weighment and back to smp / new crrs). 5. maintaining cutting/lancing equipment in good condition. 6. maintaining safety & housekeeping of work area. 7. cutting and lancing of slabs in machine / rot area in emergency at tunnel furnace, as and when required at csp caster, smp2. 8. cutting and lancing of slab in casting machine / tcm rot and tunnel area during breakout and /or during process abnormalities as and when required at csp <(>&<)>ini caster, smp2. 9. cutting of used tundish sen solid pipe. 10. launder cleaning on casting platform and other misc. jobs. 11. refractory garbage removal from tilter area at csp, ini & new crrs area. 12. above 10 tons skull cutting at caster. 13. refractory cover & refractory heat shield breakage through breaker. 14. chopping plate, scrap & plant consumable garbage loading in dumper. 15. garbage unloading at nand niketan or designated area from site through dumper. 16. two rigger & one lancer should be available / shift for csp caster & one rigger & one lancer should be available/shift for ini caster at crrs & caster area as per requirement on 12 hours duty basis day & night. 17. tilting & cleaning of slag box, launder & tundish emergency bucket & placed at designated area. 18. head, tail & sample piece of slab loading in dumper. 19. burr bucket to be emptied in dumper. 20. hole made in every tundish skull by lancing for lifting with chain sling. 21. remote crane operating at csp caster himself for designated job. 22. loader arrange for cleaning of tilter area & garbage loading in dumper from ferro store or smp. 23. maximum working time not more than twelve hours of any manpower. 24. maintaining safety & housekeeping of tilter & surrounding work area at crrs & caster. 25. manpower should be competent as per competency matrix as per latest msa. 26. wsa & group insurance policy 27. following company rules and regulations provided by am/ns management time to time related to safety hse and other rules and regulation. 28. all associates attendance, salary, invoice related data, scrum attendance system tracking and request generation for attendance regularization in scrum system as and when required. 29.transportation bus facility to be provided to manpower. manpower: (02 shift operation, i.e.: 12 hrs/day * 2 shift) total lancers: (1x4) = 4 nos. (2 nos. csp caster + 2 nos.ini caster) total riggers: (1x6) = 6 nos. (4 nos. csp caster + 2 nos.ini caster) total: 10 nos. of manpower/day for csp & ini caster, smp 2. safety: contractor shall provide following safety gears with specifications approved by am/ns india: 1. safety helmet: (color will be provided by am/ns india) 2. safety shoes. 3. safety jacket (as per amns india standards). 4. dust mask 5. safety goggles 6. hand gloves. 7. ear plug / earmuff 8. contractor shall fulfill all safety and environment rules as per guidelines of safety department. housekeeping: contractor should be responsible for housekeeping job of respective area. scope of work am/ns india: 1. 15 mm lancing pipe will be provided by am/ns india. 2. gas, oxygen, da, ng & equipment required for lancing, cutting & shifting will be provided by am/ns india. 3. work permits and all tools’ tackles will be provided by am/ns india. 4. specific penalty for nonperformance by vendor and must be strictly measured. 5. penalty will be imposed in case of noncompliance / violation of hse norms and supervisor incompetency. item note : 3 2000142065 10 30 10 providing services of lancer 26,352 std 20 providing services of rigger 17,568 std email : bhaveshkumar.shah@amns.in contact : name : bhaveshkumar shah item details : spr 2000142065 (cy2024) #10 title service of lancing facility at smp2 req manpower for the job: 06 skilled lancer & 4 skilled rigger duty hours: 12 hrs / duty (day & night) (7:00 am to 7:00 pm) <(>&<)> (7:00 pm to 7:00 am) area of job: conarc scrap yard & ladle bay area, sms 2, smp 2. scope of work vendor: 1.providing skilled lancer & rigger for the job as per latest competency matrix. 2. all ppes 3. wc policy / group insurance 4. all transportation of man & material in vendor scope up to the department gate (bus/vehicle facility). 5. deployment of 6 skilled lancer and 4 riggers required for the job for 12 hrs./day in day & night shift. 5.1 deployment of 2 skilled lancers & 1 rigger at scrap yard area in day shift from 7:00 am to 7:00 pm (12 hrs.) 5.2 deployment of 2 skilled lancers & 1 rigger at scrap yard area in night shift from 7:00 pm to 7:00 am (12 hrs.) 5.3 deployment of 1 skilled lancer & 1 rigger at ladle area in day shift from 7:00 am to 7:00 pm (12 hrs.) 5.4 deployment of 1 skilled lancer & 1 rigger at ladle area in night shift from 7:00 pm to 7:00 am (12 hrs.) bc cd bay scope of lancer & rigger 1. granshot tundish skull removal from tundish 2. granshot tundish skull cutting 3. granshot tundish skull charging into scrap bucket by magnetic cranes. 4. conarc launder skull cutting and removal from launder 5. cutting skull into small pcs and charging into scrap bucket by magnetic cranes. 6. housekeeping of the assigned area 7. hmps lance skull cutting & auxiliary work at hmps 8. during shutdowns hmps ltc lancing and cleaning, tapping pit jam cleaning. 9. conarc top lance skull collection in designated location, cutting the skull and charging into scrap bucket. 10. removal of jam from used furnace bottom shell as and when required. 11. miscellaneous lancing activities at conarc area. 12. lancing of shell jam at 9 mtr & 0 mtr as and when required. 13. lancing of pot jam as and when required at designated location. 14. 20 ton & 30 ton bucket preparation for scrap charging in conarc. 15. lancing of iron stickers in slag pot. 16. lancing to be done as per sop of launder lancing de dusting system. ef bay scope of lancer & rigger 1. ladle transfer car lancing and cleaning at lf 1.1, 1.2, 2.1, 2.2, 3.1, 3.2, lf7. 2. rh vessel lancing and cleaning (inner side snorkel) 3. rhtob ladle transfer car lancing & cleaning. 3. ladle lip jam lancing & cleaning in ladle repair shop. 4. ladle lip jam skull cutting & disposal at designated location. 5. ladle lancing during ladle repair. 6. lf column jam lancing. 7. lf roof jam cleaning. scope of work amns india: 1.provide consumables for lancing jobs. 2.timely execution of work on site. 3.specific penalty for nonperformance by vendor and must be cardinally measured. 4.penalty to be imposed in case of non compliance with hse norms / safety violation. 5.specific penalty for non conformity of work. 6.penalty shall be imposed in case of non competency matrix latest revision. 7.if any property damage occurred while lancing & rigging job penalty shall be imposed. item note :...

Airports Authority Of India - Gujarat

38505476 bids are invited for airport switch , wireless controller , nms , biometric attendance system , desktop computer , laptop , multifunction printer , scanner , ofc , class room accessories , installation accessories , laying work , sitc work , service sitc of it infrastructure for new atc building at vadodara total quantity : 12224...

Department Of Education - Gujarat

38124461 bids are invited for biometric attendance system for the maharaja sayajirao university of baroda ( q3 ) total quantity : 1...

Bhavnagar Municipal Corporation - Gujarat

38058890 tender for comprehensive annual maintenance contract of face recognition and thumb based time attendance system with required software and support for the year 2023 24...

Municipal Corporation - Gujarat

38058698 tender for comprehensive annual maintenance contract of face recognition & thumb based time attendance system with required software & support for the year 2023 24 (second attempt)...

Department Of Education - Gujarat

37983948 bids are invited for smart school ( q3 ) , language lab virtual reality lab smart attendance system with scanning e library science theme park interactive panel 3 panels in total internet facility with e content tablets ( 10 nos. ) ( in gujarati ) cctv with voice recording school campus coloring pages with necessary pictures smart scale with customized android apptotal quantity : 1...

Bhavnagar Municipal Corporation - Gujarat

37497546 tender for comprehensive annual maintenance e contract of face recpnnition and th umb based time attendance system with required software and support for the year 2023 24....

Bhavnagar Municipal Corporation - Gujarat

37200697 tender for comprehensive annual maintenance contract of face recognition and thhumb based time attendance system with require software and support for the year 2023 24....

Bhavnagar Municipal Corporation - Gujarat

37172024 tender for comprehensive annual maintenance contract of face recognition & thumb based time attendance system with required software & support for the year 2023 24....

Airports Authority Of India - Gujarat

36363041 bids are invited for block at vadodara airport switch , wireless controller , installation accessories , ofc , desktop computer , laptop , multifunction printer , scanner , biometric attendance system , class room accessories , nms , sitc work , laying work sitc of it and infrastructure for new atc cum technical total quantity : 12200...

Central Public Works Department - Gujarat

36277591 up gradation of elv items in cpwd office building at sector 10 a, gandhinagar. sh: installation of biometric attendance system, iris scanner and other miscellaneous items for office building....

Ahmedabad Municipal Corporation - Gujarat

35670643 request for proposal for selection of vendor for implementation of smart biometric attendance system at various offices of amdavad municipal corporation...