Arcelor Mittal Nippon Steel India Limited - Gujarat

44626367 tender for m6 various mech. sd jobs tentative date 20.09.2024 2000145329 10 10 60 erection of pipe 60 inm 10 dismantling of structures 6 to 40 scaffolding with material above 20 mtr 432 m3 30 sand blasting & painting 6 to 20 fabrication of ms structure 6 to 50 fabrication of pipe 90 ind email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod#6 furnace bustle deck area, furnace shell water collection tray replacement job. quantum of job : working height (elevation) – 55m approx. furnace shell diameter – 10m approx. structure dismantling – 6 ton approx. structure fabrication <(>&<)> erection – 6 ton approx. all structural material sand blasting, primer coating and painting – 6 ton approx. scaffolding above 20m – 432 m3 approx. 3 inch (schedule 40) ms drain line fabrication – 90 ind 3 inch (schedule 40) ms drain line erection – 60 inm plate cutting <(>&<)> fabrication details. square collection tray dimension 4.5mx3.5m14mm – 1 set square plate height plate – l 4.5m x h 400mm x thick. 14mm – 2 no square plate height plate – l 3.5m x h 400mm x thick. 14mm – 2 no square collection tray bottom support, ismb 200, 3.5m long – 8 no square collection tray bottom support, ismb150, 700mm long – 12 no furnace shell 10m od surrounding horizontal plate od 10.4m x id 10m x thick. 14mm – 1 no (to be bend manually in reference of furnace shell) furnace shell 10mtr od surrounding vertical plate od 10.4m x h 300mm x thick. 3mm – 1 no (to be bend manually in reference of furnace shell) furnace shell 10mtr od surrounding horizontal plate support 50/50/6 400 length – 30 nos. ss plate cutting – 4.5m x4.5m x 8mm <(>&<)> fit up/erection with furnace shell at 51m elevation. ss fillet welding – 4.5m + ss ss welding – 20m ss 400 mm long plate cutting (5mm thick) – 18m support fabrication <(>&<)> erection for tray supporting – 02 ton. contractor scope: 1. get the permit from the control room / site engineer, get the sign of field controller. 2. job to be started after proper toolbox talk (tbt) given to all contractor associates. additional work at height permit to be taken if required. 3. standard maintenance practice (smp) of structure replacement to be carried out for the jobs to all manpower. smp and hirac number must be mentioned in permit. 4. before starting the job, the fire extinguisher and water hose must be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets to be arranged by contractor. 5. all safety precautions must be followed by the contractor and its technicians. they must wear safety belts while performing jobs at height above 1.8m. use safety belt and lifeline and work area to be barricaded. as per job requirement technician must have rigger pass, work at height pass, crane operator pass, welder pass etc. 6. 12mm ss wire rope to be use in lifeline, rope to be clamping through clamp. 7. safety belt to be hooked up with permanent structure, if required page 2 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details hook to be fabricated and welded. 8. crane/hydra will be provided by am/ns as per availability, otherwise job to be done manually /by chain blocks. crane operation for material shifting must be done by the contract supervisor. (no technicians are allowed to operate the crane). 9. issue of material from main store and shifting from stock yard to work site. 10. for all plates sand blasting, primer coating and painting job to be done and it is in contractor scope. all structures should be replaced with sand blasting and structure coating. 11. all welding joints must be painted by the contractor and scaffolding must be removed after completing this. 12. if any scaffolding to be required to perform the job at height, same to be prepared by contractor. scaffolding will be used after certification only from the am/ns safety engineer. 13. using co meter in job is mandatory and wind direction with co level to be checked in job. working area co level should not be more than 50 ppm. 14. m5 furnace area damaged structure cutting to be done and to be fixed back with new structure. 15. contractors must make proper arrangements for any hot work to control sparks falling on the downward deck to avoid any accident. 16. contractors should deploy competent supervisors and safety officers on a round the clock basis to supervise and complete the jobs in time.do necessary correction as per am/ns engineer if required. 17. all the machines, cutting/welding machines, tools, and consumable items etc., required for the job will be arranged by the contractor. all welding and sharp edge must be grinded. all dismantled material to be shifted back to storage/scrap yard. 18. all safety items like safety shoes, safety helmets, safety belts, lifeline, fall arrestor, hand gloves etc. are to be arranged by the contractor for their manpower. 19. any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. am/ns scope : 1. co ordination for work permit. 2. all permanent material <(>&<)> special electrodes. 3. hydra, trailer, and crane will be provided as per availability. 4. drinking water, power supply, lighting facilities, working platform etc. for workmen at plant site. 5. job certification for executed jobs. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. violation of any hse norms. 3. if delay in completion of job. for arcelormittal nippon steel india ltd. item note : 2 2000155524 20 20 10 reformer top cover blrf op/cln/hot tigtn 576 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod#6 reformer tube top cover blind flange opening, closing and hot tightening job. quantum mof job : working elevation : reformet top, high temperature zone. end cover blind size : 6 inch qty. : 576 no total flange opening : 576 no total flange closing : 576 no after reformer light up and achieving box temperature all 576 reformer tubes hot tightening to be done for 2 times. page 3 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details scaffolding above 20m height : 800 m3 approx. tentative date of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. reformer tube top cover opening and closing. 11. total 576 nos reformer tube top cover to be opened for inspection after clearance same to be box up. nos of top cover to be open/closed as per operation team requirement, qty. will be certified as per job done on site. 12. contractor must open requested top cover in minimum time with pneumatic wrench. 13. before opening system pressure to be ensure to zero. 14. top cover to be open. removed fastener to be kept in diesel drum and same to be re use. 15. after inspection from production side same to be box up. all flange joint must be leak proof. to be attended in odd hours also. 16. during box up inside glass wool to be ensure with area engineer. 17. top cover to be box up with new gasket. gasket area to be clean properly. 18. top cover hot tightening to be done 3 times as per production clearance. if any leakage same to be attend for that manpower to be ready in 24 hours. 19. top cover hot tightening can be done whenever clearance received from production side for plant start up so vendor will have ability to provide manpower in day/night or in odd hour also. 20. portable machines is to be shifted before 2 days of shutdown for certification and connection. 21. shifting of all materials required for the job to be shift from workshop or main store to work area. 22. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 23. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 24. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp page 4 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details tested. dp test consumables are in contractor scope. 25. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 26. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 27. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 28. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 3 2000155524 30 30 10 tgfc,cfc,bsg & sgc water strn cln job 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 tgfc, cfc, bsg <(>&<)> sgc water strainer removal for cleaning and box up job. quantum of job: tgfc water strainer, size 16 inch – 1 no cfc water strainer, size 14 inch – 1 no bsg water strainer, size 3 inch – 2 no sgc water strainer, size 4 inch – 4 no stranger inside mest removal, cleaning and box up. if inside mesh is damaged more then same to be made by mesh sheet. if old strainer is damaged more then whole strainer to be replaced. reqiured rectification to be done if face to face distacne need to adjust as per site engineer instruction. tentative date of shutdown: 20th sept. 2024 contractor’s scope: 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. all water strainer end flange to be open. before that ensure valve to be isolated. page 5 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 7. strainer to be removed. 8. strainer to be replaced with one to one. 9. if any welding joints comes same to be done of 3 inch. 10. water line to be flushed by production. for that end blind to be open if required 11. cleaning the gasket area and pasting new gasket. 12. fix the strainer inside spool and box up to be done 13. leak checking and rectification. 14. portable machines is to be shifted before 2 days of shutdown for certification and connection. 15. shifting of all materials required for the job to be shift from workshop or main store to work area. 16. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 17. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 18. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 19. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 20. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 21. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 22. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 23. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope: 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel inda ltd. item note : page 6 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 4 2000155524 40 40 10 pgc,sgc,tgfc,cgc sealdrain op/cln/boxup 9 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 all pgc, sgc, tgfc and cfc to seal leg drain line opening for cleaning <(>&<)> box up job. quantum of job : elevation – 0m, ground floor all drain line opening for all compressor and silencer. flange opening <(>&<)> cloasing, 2 inch – 16 no approx. for one compressor and silencer. silencer 4 inch drain valve open for cleaning – 9 no total compressor – 9 no tentative date of shut down: 20 sept. 2024 contractor scope: 1. get the work permit/hot work permit from area site in charge/the control room, get the sign of field controller 2. safety talk/hirac to be carried out for the jobs to all manpower. 3. all safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. use safety belt and lifeline. work area to be barricaded. as per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 4. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 5. before starting the job, the fire extinguisher and water hose must be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 2 drain line opening and after cleaning. cleaning to be ensure with production team after clearance from production side same to be box up with proper gasket. 7. compressor and silencer drain line to be open from seal leg area side after cleaning same to be box up with new gasket 8. silencer 4 drain valve also to be open for cleaning after cleaning same to be box up and end blind to be fixed. 9. drain line 2 damage rubber bellow and valve to be replaced as per instruction from am/ns engineer. 10. if found any leakage in drain line same area welding to be done. 11. line supports and clamp to be provided as per instruction of site in charge 12. trial to be taken with am/ns engineer and if leakages found to be rectified immediately on odd hours also. 12. during seal leg side flange opening if scaffolding required same to be fixed and that area grating to be removed and after job completion grating to be fixed. all joints must be leak proof. any leak must be attended within 1 hour in odd hours. 13. shifting of all materials required for the job to be shift from workshop or main store to work area. 14. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 15. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 16. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. page 7 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 17. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 18. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 19. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 20. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 21. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope: 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 6. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel inda ltd. item note : 5 2000155524 60 50 10 tgf orifice removal & line cleaning 50 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 top gas fuel (tgf) orifice and its line opening for cleaning and box up job. quantum of job : tgf orifice size – 3 inch 3 inch flange opening <(>&<)> closing 3 inch pipe to be removed for cleaning and after cleaning same to be box up. (length approx. 3m) the jammed lines to be cut and to be weld for rodding for cleaning the lines. all open lines to be boxed up and with proper orifice and new gasket. cleaning will be done by production team. total qty. 50 no elevation: 0 to 5m tentative date of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work page 8 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details job is done by contractor. fire blankets in contractor scope. 6. total 50 no. orifice to be open for inspection after clearance same to be box up. 7. before opening system pressure to be ensure. 8. both orifice flange to be open. 9. 3 inch lines is to be cleaned by operation team. 10. if line is jammed then it is to be patch cut and after rodding and cleaning same to be welded back. 11. all open lines to be fixed back with proper gasket <(>&<)> orifice positioning. 12. after inspection from production side same to be box up. 13. during box up new gasket to be use. 14. gasket area to be clean properly. 15. all bolts to be tightened properly. 16. if any leakage same to be attend for that manpower to be ready in 24 hours. 17. orifice flange hot tightening to be done for that manpower to be ready in odd hours also. 18. portable machines is to be shifted before 2 days of shutdown for certification and connection. 19. shifting of all materials required for the job to be shift from work shop or main store to work area. 20. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 21. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 22. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 23. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 24. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 25. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 26. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. 27. billing qty. will be certifiedas per actual job requirement as per operation team. 28. all joints must be leak proof. any leak must be attended within 1 hour in odd hours. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. page 9 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 6 2000155524 70 60 10 pgc spool,lobe clen&clearance check 6 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 all pgc, tgfc and cgc suction and discharge spool opening, lobe cleaning, clearance checking and box up job . quantum of job : all inlet <(>&<)> outlet line spool opening, cleaning, lobe cleaning, clearance checking <(>&<)> after clearance to be box up. purge gas tapping to be replaced <(>&<)> 9 nos nozzle box to be removed and same to be fixing by nozzle. line size : 900mm spool length : 1500mm (2 nos spools/compressor) total compressor : 6 nos scaffolding up to 10m = total 600m3 at different location. tentative date of shut down : 20th sept. 2024 compressor’s technical details model : gq 22.33, twin lobe type make : aerzen, germany contractor scope : 1. get the work permit/hot work permit entry permit from area site in charge/the control room, get the sign of field controller 2. safety talk/hirac to be carried out for the jobs to all man power. 3. all safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. use safety belt and lifeline. work area to be barricaded. as per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 4. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 5. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. 6. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 8. scaffolding in contractor scope for dismantling of tgfc cooler mist eliminator , scaffolding to be fixed then same to be certified by amns engg then green tag to be fixed then scaffolding to be used. all scaffoldings wherever required are to be supplied and erected by contractor with amns work at height pass. work at height pass and ecg report must be required for job as per safety norms. 9. ensure the co ppm before opening the bolt. open the suction spool and discharge spool bolt ensure the compensator bellow gap before opening. 10. before opening suction and discharge spool opening required locking to be done and bottom side support to be fixed and locking stud to be provide. 11. ensure locking of lobe before cleaning. if require fabricate the locking arrangement. 12. clean the both the lobes and casing side wall and casing body by chipping and buffing as per instruction of in charge engineer. 13. flush the lobes and casing by water and rotate the compressor. compressor rotation should be free. for flushing rubber hose is in contractor scope. 14. check all the clearance in compressor and same to be noted down in presence of area incharge. 15. any abnormality noticed during the cleaning and clearance checking page 10 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details to be discussed with in charge engineer. 16. check all the clearance in the compressor along with area engineer and plant rcm team. 17. after clearance from amns representative box up the spool, ensure no any foreign material inside the casing. 18. before spool box up its purge gas tapping to be replaced and some nozzle having box same to be removed and new nozzle to be fixed. 19. box up the spool with new gasket and tightening the bolts. 20. if any leak occurs. rectified immediately on odd hours also. 21. scaffolding to be done at 6 different places approx. 600 m3 22. scaffolding to be done before shutdown of plant. 23. scaffolding approx. 600 m3 is in contractor scope which is to be done before shutdown. 24. after job completion same to be checked with area engineer and then surrounding area housekeeping to be done. 25. shifting of all materials required for the job to be shift from work shop or main store to work area. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 26. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 27. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 28. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 29. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 30. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 31. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 32. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. 33. billing qty. will be certifiedas per actual job requirement as per operation team. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel inda ltd. page 11 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details item note : 7 2000155524 80 70 10 sgc demister pad replacment job 2 no 20 bsg demister pad replacment job 2 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 seal gas compressor <(>&<)> bottom seal gas compressor demister pad replacement job. quantum of job : 1. seal gas compressor demister pad replacement job. hatch opening <(>&<)> closing, size 1000mm – 2 nos old demister pad removal job, size 800mm – 2 nos new demister pad fixing job, size 800mm – 2 nos (demister pad is in 3 parts) 2. bsg compressor demister pad replacement job. hatch opening <(>&<)> closing, size 500mm – 2 nos old demister pad removal job, size 500mm – 2 nos new demister pad fixing job, size 500mm – 2 nos (demister pad is in 2 parts) tentative date of shut down : 20th sept. 2024 contractor scope : 1. get the work permit/hot work permit from area site in charge/the control room, get the sign of field controller 2. safety talk/hirac to be carried out for the jobs to all man power. 3. all safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. use safety belt and lifeline. work area to be barricaded. as per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 4. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. before opening hatch system pressure to be ensure 7. separator hatch to be open 8. after that inside co and o2 level to be checked. if found ok then inside demister pad to be removed. if required its support to be cut. and then again welding to be done. 9. separator inside cleaning to be done by production. 10. new demister pad to be fixed. all bolt to be tightening. 11. after inspection from production and area engineer hatch to be box up with new gasket. 12. leak test to be done if any leak found same to be attend in odd hours also. 13. portable machines is to be shifted before 2 days of shutdown for certification and connection. 14. shifting of all materials required for the job to be shift from work shop or main store to work area. 15. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 16. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 17. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 18. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per page 12 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details the instruction of area engineer in charge. 19. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 20. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 21. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 22. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. free supply of air, water and electricity will be provided at single point. adequate lighting will also be provided. 6. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel inda ltd. item note : 8 2000155524 90 80 10 reformer tube fsbric bellow relacement 50 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 reformer tube fabric bellow positioning/replacement job. quantum of job : reformer tube detached fabric bellow inspection to be done. if required to positioned or to be replaced by new one as per site engineer instruction. fabric bellow size 9 inch qty. 50 no approx. 9 inch flange opening <(>&<)> closing – 100 no scaffolding up to 10m height – 1800m3 at different location elevation: 4m tentative date of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through page 13 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. total 50 nos reformer tube bottom fabric bellow inspection to be done. 11. separate scaffolding for each tube to be done inspection and positioning job. 12. reformer tube bottom fabric bellow is clamped with clamps. 13. clamps to be loosened and fabric bellow to be positioned. 14. once positioning is done then clamps to be tightened. 15. same clamps hot tightening to be done @ 200°c. 16. inspection will be done amns engineer. 17. portable machines is to be shifted before 2 days of shutdown for certification and connection. 18. shifting of all materials required for the job to be shift from work shop or main store to work area. 19. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 20. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 21. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 22. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 23. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 24. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 25. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any page 14 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 9 2000155524 110 90 10 reformer tube catalyst dump,seg.&refill 108 no 20 scaffolding with material above 20 mtr 6,000 m3 email : yash.vala@amns.in contact : name : yash vala item details : scope of work for reformer tube old catalyst dumping, segregation and new catalyst refilling job. quantum of job : following step to be followed for new catalyst filling : feed gas, bottom spool to be removed and refixing. counter weight to be down/adjustment and refixing. bottom cannister to be removed, cleaning and refixing. old catalyst to be removed. (tube top cover flange to be open if rodding required for catalyst removal) old catalyst segregation and filling in drum. new catalyst filling after bottom canister fixing. all part to be refixed as earlier. total qty. 108 no scaffolding above 25m – 6000m3 approx. reformer tube size : 9 inch, length – 9.45m approx. bottom spool details : dia.3 inch., 860mm long with 1 side special flange with od 340mm and one side 3 inch wnrf 150# bottom cannister : max. dia. 180mm, 643mm long elevation : 4 to 15m contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 1. before opening system pressure to be ensured 2. 108 no of reformer catalyst tubes to be dumped and refilled again after inspection. 3. 108 no of 3 inch feed gas hose to be dismantled. 4. reformer tube top cover to be opening and closing. 5. bottom spool and bottom canister to be removed. 6. 108 nos. of catalyst tubes top cover and bottom canister to be removed for dumping the tubes. 7. all these 108 reformer tubes counterweight is to be dismantled. 8. catalyst to be segregated and filled along with new catalyst in reformer tubes. 9. bottom spool gasket area to be cleaned and new gasket to be provided. page 15 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 10. same arrangements to be boxed up again. 11. after inspection from production side same to be box up. 12. during box up inside glass wool to be ensure with area engineer. 13. top cover to be box up with new gasket. gasket area to be clean properly. 14. top cover hot tightening to be done 3 times as per production clearance. 15. if any leakage same to be attend for that manpower to be ready in 24 hours. 16. top cover hot tightening to be done for that manpower to be ready in odd hours. 17. portable machines is to be shifted before 2 days of shutdown for certification and connection. 18. shifting of all materials required for the job to be shift from work shop or main store to work area. 19. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 20. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 21. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 22. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 23. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 24. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 10 2000155658 20 100 10 fur53pmp suc./dis. v/v,spol op/cln/boxup 4 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 furnace area 53 pump suction and discharge header, line, valve, nrv <(>&<)> spool opening for cleaning and box up job. quantum of job : page 16 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details suction valve (14 inch) – 4 no suction bellow (10 inch) – 4 no suction spool – 4 no discharge valve (10 inch) – 4 no discharge bellow (8 inch) – 4 no discharge nrv (10 inch) – 4 no discharge spool – 4 no discharge header blind opening <(>&<)> closing, 16 inch – 2 no suction header blind opening <(>&<)> closing, 24 inch – 2 no scaffolding up to 10m for discharge line job – 270 m3. working elevation at m6 deck no. 3 – 18m approx. tentative month of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. open the all pump suction and discharge spool, valves, nrv as per instruction of am/ns engineer. any damaged valve, spool <(>&<)> bellow to be shifted to scrap yard. 11. the removed valves, spools, bellow and nrv to be cleaned and offered for inspection to amns engg. after inspection by amns engineer it must be fixed back or replaced. 12. as per the instruction of am/ns engineer new valve/nrv to replaced. if removed one found damage or not reusable. otherwise removed one to be fix back. 13. all suction and discharge pipes must be modified, cut, fit up and welded as per new bellow, valves and nrv. all suction and discharge pipe must be straight, and all flanges must be off centre. bellows stud to be adjusted as per area in charge. replace rubber bellow, cutting and welding to be done as per rubber bellow size. rubber bellow and pipeline must be straight and rubber bellow locking stud to be provided with plate and gape must be set as per area in charge. 14. all valves, nrvs, rubber bellows to be replaced, if any item not available, same to be overhauled in contractor scope. 15. suction and discharge spool 2 vent and drain point provision/valve replacement, spool modification to be done as per amns engg if require. 16. the necessary suction and discharge pipe to be cut and fixed back and weld as per amns engg requirement. all line u clamp and support to be fixed after job and locking and lock cutting to be done as per job as per amns egg. 16. if ready to use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 17. the all flange joints to be leak proof. any hot tightening required page 17 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details then same to be carried out as per the instruction of amns engineer. 18. shifting of all materials required for the job to be shift from work shop or main store to work area. 19. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods and hydra for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 20. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 21. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 22. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 23. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 24. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 4.5 25. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 26. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 11 2000155658 30 110 10 f/c c/hcone partly repl & hard facing 1 no 20 usg,usl&lsl pipe removal & hard facing 1 no 40 charging distributor hard facing job 1 no 50 octopus leg & feed pipe repairing job 1 no 30 tsealbelow,sleve,wearcon remov&hardfcing 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 furnace charge hopper cone, usl/usg job, top seal bellow/sleeve/wear cone job, charging distributor hard facing job and octopus leg/feed pipe repairing job. quantum of job. working height : +60m to +75m 1. charge hopper lower cone partly replacement job code details : top dia. – 3.5m, bottom dia. – 1.12m, length – 3.35m, to be replaced. existing cone strengthening to be done by fixing pad and welding as per site engineer instruction. scaffolding above 20m height – 450 m3 approx. page 18 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1 inch ms spray water line replacement – 10m approx. fabrication of supporting/locking structure – 1 ton approx. 2. usl pipe, usg gate dismantling for replacement/repairing/hard facing and fixing job. all parts to be dismantle and after inspection by amns engineer, new parts to be fixed as per instruction or existing parts repairing and hard facing to be done. usg gate removal for hard facing job and to refix, weight – 2 ton approx. usl pipe (size : od 508mm, 4500mm long) removal. after inspection hard facing to done or if required to be replaced with new pipe. usl gas inlet and outlet line (size : 6 inch) partially replacement – 6m approx. pad fixing on usl and platform erection for hammering purpose. usg all hatch opening, cleaning, and box up and usg gland replacement. 3. top seal bellow, sleeve and wear cone dismantling for hard facing and fixing back. upper seal leg gas inlet cone replacement, weight 1.3 ton approx. upper seal leg bellow (size : id 770mm od 914mm) replacement, weight 250kg. approx. all parts to be dismantle, after inspection done by amns engineer, new parts to be fixed or existing parts hard facing to be done. bellow to be locked properly. bellow inside sleeve pipe to be replaced. during below replacement job all safety precautions to be followed bellow should not damage. otherwise, penalty to be imposed on contractor as per amns. 4. charging distributor hard facing job. after hatch opening and checking, repairing, and hard facing to be done as per amns engg. same hatches to be box up after clearance. 5. octopus leg – 24 no and feed pipe – 24 no repairing job. pipe side 352mm od and length 1200mm same to be repair after inspection by amns engineer all octopus leg nozzle open and after clearance from prod same box up. if any nozzle jammed as per amns engineer, same to be cut and welded. all feed pipe c lock fixing, patch to be welded as per amns eng. tentative month of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per page 19 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. proportionating hopper inside area to be cover properly as furnace inside area work is continue going on. 11. before removal of old cone proper locking to be done from charge hopper side and cone bottom side. also new cone assembly to be shifted from store to site. 12. after locking the cone flange joint to be open. existing cone to be removed as per new cone size. as per amns engineer instruction, pad to be fixed and welded. 13. after cone replacement and fit up inspection by amns engineer final welding to be done and hard facing to be done. as per amns engineer instruction. 14. proportionating hopper new/existing wear cone hard facing to be done near workshop and to be shifted at spot by contractor. 15. during shifting of wear cone at spot, charge hopper crane to use if available, if not available then contractor must shift it by proper lifting tools. 16. the upper slide gate is to be locked from all 04 sides. gate to be removed and hard facing to be done then gate to be fixed.usl(top, middle and bottom) pipe to be dropped. 17. bottom bellow to be locked with all safety precautions. 18. bottom seal pipe of upper slide gate to be removed (size 500 mmx length 1280 mm) 19. bottom bellow to be removed. 20. bellow inner sleeve condition to be checked and repair/ replaced. 21. otherwise new sleeve (500 mm dia.x 1050 mm length) to be prepared and replacement to be done. also hard facing to be done. 01 t chain block to be used for sleeve removal. 22. wear cone to be checked and hard facing/ built up to be done, if possible, otherwise replace it with the shifted spool. 01 t chain block to be used for wear cone removal. 23. usl gas inlet cone to be replaced with new one and gas inlet and outlet line to be fixed as per drawing for that required modification to be done. 24. all feed pipe checking/repairing/locking/pad welding to be done as per amns engg. 25. octopus nozzle to be cut/fixing/pad welding as per amns engg. 26. easy flow device hard facing as per amns engg. 27. after replacement/repairing of wear cone/inner sleeve, bellow, usl pipes and usg bottom spool to be re fixed and gate locking to be removed. usl pipe pad to be fixed and welded. 28. new gasket to be fixed and all bolt to be tight. 29. all hatches to be open and after cleaning same to be box up. 30. leak test to be done if any leak found same to be attend. 31. old removed items to be shifted at ground level and same to be cut in 1 meter piece after that send to scrap yard. 32. if ready to use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 33. the all flange joints to be leak proof. any hot tightening required then same to be carried out as per the instruction of amns engineer. 34. shifting of all materials required for the job to be shift from work shop or main store to work area. 35. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods and hydra for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 36. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 37. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done page 20 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 38. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 39. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 40. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 4.5 41. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 42. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 12 2000155658 40 120 10 m6 f/c lower cone replacement 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 furnace lower cone replacement job. quantum of job. working height : +25m to +30m weight : 5 ton approx. ms cutting : 30m approx. ms welding : 60m, (need help of 5 ton chain block 3 no) assemble furnace lower cone with lbf nozzle, keep assembly ready of shaft with braker disc, plummer block, lubrite bush, pocking nozzle, hydraulic cylinder and hydraulic lines as per amns engg. instruction/drawing. ali gnment/leveling to be done after installing. shift furnace lower cone assembly at lbf deck. cone area required nozzle and manhole to be fixed at site as per engineer instruction. marking, cutting and removal existing lower cone assembly as per amns eng. instruction. before removing lower cone, furnace shell and bottom seal cone to be proper locking with 150 mm beam. edge preparation to be done and proper grinding to be done. position and fit up lower cone. alignment to be done of shaft and lower cone. welding and stiffener to be provide as per amns eng instruction. existing lower cone to be cut and scrap. scaffolding above 20m height 450 m3 approx. supporting and locking structure – 1 ton approx. during lower cone replacement job all safety precautions to be followed. hydraulic cylinder should not damage. page 21 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details before starting job mbf all shaft covered with plant/plate and glass wool as safety purpose. contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. furnace lower cone before removal locking to be done at mbf deck and bottom seal cone area with min. 150 mm beam. 11. lbf shaft plummer block and cylinder to be removed after cutting/removing breaker disc and kept at side. extra care to be taken for hydraulic cylinder should not damage during removal. 12. lower cone top portion cut from welding joint and bottom side flange joint to be open. 13. lower cone to be removed by chain block. for that proper anchor point to be prepared/provide and same to be certified by authorized person. 14. after cone removal joint area edge preparation to be done. 15. new cone will be supplied in two parts as per availability by rolling machine. 16. new cone nozzle and manhole will be fixed at site as per exiting and as per amns engineer requirements. 17. new cone assembly kept ready for fixing, after edge preparation of new cone. 18. after cone replacement and fit up inspection by amns engineer final welding to be done. 19. lbf shaft to be fixed with new breaker disk and lubrite bush, plummer block. arm and cylinder. 20. shaft leveling same to be inspect with amns engineer. 21. after ensuring leveling, gland addition, arm, link and cylinder will be fix. 22. lbf trial to be taken with area engineer if any rectification observed same to be correct immediately. 23. all welding joint leak test will be done after job completed. if any leak observed same to be attended immediately for that if manpower required in odd hours same to be kept ready by contractor. 24. after all welding joint temporary lock to be removed which was done during removal. 25. old removed items to be shifted at ground level and same to be cut in 1 meter piece after that send to scrap yard. 26. if ready to use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 27. the all flange joints to be leak proof. any hot tightening required then same to be carried out as per the instruction of amns engineer. 28. shifting of all materials required for the job to be shift from work page 22 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details shop or main store to work area. 29. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods and hydra for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 30. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 31. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 32. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 33. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 34. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 4.5 35. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 36. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 13 2000155696 10 130 10 cfc suc. strn/spol op/cln/boxup 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 centrifugal compressor suction strainer and spool opening, cleaning <(>&<)> box up job. quantum of job: suction spool flange size: 1000mm suction spool length: 2300mm number of flange joints to be open <(>&<)> close: 02 no working elevation: 1.5m approx. scaffolding up to 10m: 250 m3 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp page 23 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. 3. smp of cfc strainer replacement to be carried out for the jobs to all manpower. smp and hirac no must be mentioned in permit. 11. 4. suction line(1000nb), discharge line(1000nb) and n2 line (2) to be blind/de blind, if required. 12. 5. centrifugal compressor suction spool and strainer to be dropped after proper locking of suction bellow. 13. 6. required scaffolding will be prepared by contractor. 14. 7. suction strainer to be removed from spool for cleaning. eot crane available at vpsa area same can be use if required. 15. 8. strainer to be cleaned by wire brush/buffing machine. 16. 9. guide vane operation checked by production, after amns engineer clearance, same to be box up done. 17. 10. cleaning the gasket area and pasting new gasket. 18. 11. fix the strainer inside spool and box up to be done. ensuring cleaning inside spool before boxed up. 19. 12. leak checking and rectification. 20. 13. bellow lock to be normalized after amns engineer clearance. 21. all tools and tackles and required scaffolding material for the job is under the contractor’s scope. 22. contractors should deploy competent supervisors and safety officers on a round the clock basis to supervise and complete the jobs in time. 23. do necessary correction as per amns engineer if required. 24. housekeeping should be carried out after completion of the job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 25. all tools, tackles like welding machines cutting sets, welding electrode, gauging rods, chain block, slings, spanners, hammers, hydraulic pumps, jacks, etc. will be in contractors scope. 26. all safety items like safety shoes, safety helmets, safety belts, lifeline, fall arrestor, hand gloves etc. are to be arranged by the contractor. 27. as per management directive, transport / movement of associates to <(>&<)> from for plant should be mandatory in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. page 24 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel india ltd. item note : 14 2000155696 20 140 10 tgfc2nd clr lech nozl&elbow op/cln/boxup 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 tgfc 2nd stage cooler lechlor nozzle and elbow opening, cleaning <(>&<)> fixing job. quantum of job : lechlor nozzle size – 2 ½ inch, 20 no elbow size – 2 ½ inch, 20 no water header dead end flange opening <(>&<)> closing, size – 12 inch, 4 no inside grating opening <(>&<)> box up – 2 no hatch opening <(>&<)> closing – 28 inch, 2 no elevation: 10m contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 4. all necessary hatches/manhole to be open for entering inside the vessel. 5. check the oxygen/co ppm level inside the vessel. do not enter inside vessel without o2 meter. safety officer must be available for round o’clock for job execution. 6. inside grating to be removed as per requirement and after clearance same to be box up. 7. grating supporting damage beam to be replaced as per instruction. 8. all 20 nos. lechlor nozzle to be removed and cleaning and box up. after cleaning same to be inspected by the operation team and protocol to be signed. 9. all 20 nos. elbow, water header end flanges of cooler to be open and after cleaning, same to be boxed up after inspection and clearance from site engineer. 10. required ss grating to be removed for packing removal/filling and after clearance same to be fixed back and locked. 11. all hatches are to be boxed up after clearance. 12. 01 water hoses required for elbow/nozzle and header cleaning, same will be in contractor’s scope. page 25 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 13. contractors should deploy competent supervisors and safety officers on a round the clock basis to supervise and complete the jobs in time. 14. do necessary correction as per amns engineer if required. 15. housekeeping should be carried out after completion of the job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 16. all tools, tackles like welding machines cutting sets, welding electrode, gauging rods, chain block, slings, spanners, hammers, hydraulic pumps, jacks, etc. will be in contractors scope. 17. all safety items like safety shoes, safety helmets, safety belts, lifeline, fall arrestor, hand gloves etc. are to be arranged by the contractor. 18. as per management directive, transport / movement of associates to <(>&<)> from for plant should be mandatory in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel india ltd....

Arcelor Mittal Nippon Steel India Limited - Gujarat

44448998 tender for 2000143668:m6hatchopen&close furnaceemptyout&shutdown 2000143668 20 10 20 hatch open&close with hot tightening 8,512 ind 10 hatches opening and closing 2,040 ind email : yash.vala@amns.in contact : name : yash vala item details : m6hatchopen&close furnaceemptyout fy2024fy2024 scope of work for mod 6 hatch opening & closing during furnace empty out in fy2024. list of hatches with size. furnace area hatch opening & closing with hot tightening : 1.,,usg, 16 inch – 2 no (32 ind), 4 inch – 2 no (8 ind), 20 inch – 1 no (20 ind) 2.,,proportionating hopper, 20 inch – 2 no (40 ind), 24 inch – 1 no ( 24 ind) 3.,,octopus outer legs pocking flange, 4 inch – 16 no (64 ind) 4.,,61m hatch, 48 inch – 2 no (96 ind) 5.,,top gas duct hatch, 32 inch – 1 no (32 ind) 6.,,bustle entry hatch, 40 inch – 1 no (40 ind) 7.,,bustle gas duct vertical hatch, 40 inch – 3 no ( 120 ind) 8.,,mbf hatch, 28 inch – 1 no (28 ind) 9.,,ubf hatch, 28 inch – 1 no (28 ind) 10.,,top gas scrubber lower cone, 28 inch – 2 no (56 ind) 11.,,cooling gas scrubber lower cone, 28 inch – 2 no (56 ind) 12.,,all dust collection line hatches, 20 inch – 10 no (200 ind), 8 inch – 3 no (24 ind) 13.,,lower slide gate, 16 inch – 4 no (64 ind) 14.,,cooling gas entry, 24 inch – 1 no (24 ind), 16 inch – 2 no (32 ind) 15.,,1115,1116,6155,1101 venturi strainer, 20 inch – 4 no (80 ind), 6 inch – 4 no (24 ind) 16.,,lbf hatch, 20 inch – 1 no (20 ind), 16 inch – 1 no (16 ind) 17.,,lsl pipe pocking flange, 16 inch – 1 no (16 ind), 12 inch – 1 no (12 ind), 6 inch – 6 no (36 ind) 18.,,cg venturi top hatch, 24 inch – 1 no (24 ind) 19.,,top gas scrubber all manholes, 24 inc – 10 no (240 ind) 20.,,cooling gas scrubber all manholes, 24 inch – 6 no (144 ind) ground floor area: 1.,,reformer main door, 60 inch – 2 no (120 ind) 2.,,feed gas header, 40 inch – 6 no (240 ind) 3.,,feed gas common header, 40 inch – 2 no (80 ind) 4.,,mixing ring y piece, 40 inch – 1 no (40 ind) 5.,,rg header individual hatch, 40 inch – 3 no (120 ind) 6.,,hot air common header, 44 inch – 3 no (132 ind) 7.,,bustle gas duct at pg roof, 40 inch – 2 no (80 ind) 8.,,recuperator hatches, 16 inch – 28 no (448 ind) 9.,,tgf chiller mist eliminator hatch, 24 inch – 1 no (24 ind) 10.,,pg mist eliminator hatch, 24 inch – 3 no (72 ind) 11.,,all pgc silencer hatch, 24 inch – 16 no ( 384 ind) 12.,,hot air all 07 headers, 48 inch – 7 no (336 ind) 13.,,vpsa both cooler hatch, 32 inch – 6 no (192 ind) 14.,,tgf chiller hatch (1500 x 500 x 02) 40 inch – 2 no (80 ind) 15.,,seal gas cooler , 24 inch – 1 no (24 ind), 36 inch – 1 no (36 ind) 16.,,top gas fuel common header hatch, 24 inch – 2 no (48 ind) 17.,,feed gas 1st stage common header hatch, 24 inch – 2 no (48 ind) 18.,,vpsa both cooler mist eliminator hatch, 24 inch – 2 no (48 ind) 19.,,sgc and bsg knock out drum hatches, 32 inch – 2 no (64 ind), 16 page 2 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000117541 date 26.07.2024 submission date 03.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details inch – 1 no (16 ind) 20.,,cold pg mist eliminator hatch, 24 inch – 1 no (24 ind) utility, junction house 23 & vpsa area 1.,,vpsa both cooler mist eliminator hatch, 24 inch – 2 no (48 ind) 2.,,sgc and bsg knock out drum hatches,32 inch – 2 no (64 ind), 16 inch – 1 no (16 ind) 3.,,cold pg mist eliminator hatch, 24 inch – 1 no (24 ind) 4.,,all lr/kr/mr sump manhole hatch, 40 inch – 12 no ( 480 ind) 5.,,vpsa main dampener, 44 inch – 3 no (132 ind) 6.,,152 pump suction pit manhole, 40 inch – 1 no (40 ind) 7.,,dc venturi scrubber square hatch (900mm x 900mm), 36 inch – 2 no (72 ind) 8.,,hrt 33 sump manhole hatch, 24 inch – 1 no (24 ind) 9.,,dry cyclone square hatch (1000mm x 900mm), 30 inch – 4 no (120 ind) for 1 time hatch opening & closing : 1020 ind for 1 time hatch opening & closing with hot tightening : 4256 ind total hatch opening & closing : 1020 x 2 = 2040 ind total hatch opening & closing with hot tightening : 4256 x 2 = 8512 ind contractor scope : 1. get the work permit from area site in charge/the control room, get the sign of field controller. hot work permit and work at height permit to be taken as per job requirement. 2. job to be started after proper toolbox talk given to all contractor associates. additional work at height permit to be taken where required. safety talk / hirac to be carried out for the jobs to all manpower. 3. smp and hirac no must be mentioned in permit. 4. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 5. all safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. use safety belt and lifeline. work area to be barricaded. as per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. 7. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 8. eot crane operation for material shifting must be done by the contract supervisor. (no technicians are allowed to operate the crane) 9. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 17. if ready to use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 18. the all flange joints to be leak proof. any hot tightening required then same to be carried out as per the instruction of amns engineer. 20. shifting of all materials required for the job to be shift from work shop or main store to work area. 21. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set & welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. 22. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 23. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 24. housekeeping should be carried out after completion job. all used / page 3 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000117541 date 26.07.2024 submission date 03.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 25. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 26. all scrap to be cut into 1m length and scrap material to be loaded & shifted at specified location as per am/ns engineer. 4.5 27. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 28. as per management directive, transport/movement of associates to & from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material & special electrodes to be provide if required. 3. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site 4. job certification for executed jobs. 5. electrical certification will be done by am/ns electrical engineer. 6. free supply of air, water and electricity will be provided at single point. adequate lighting will also be provided. 7. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 2 2000143668 40 20 10 hatch open&close with hot tightening 3,108 ind email : yash.vala@amns.in contact : name : yash vala item details : m6hatchopen&close shortshutdown fy2024 2024 scope of work for mod#6 various area hatch opening & closing during monthly short shut down fy2024. list of hatches with size. 1.,,jh23 area dust collection line square hatch 500x700mm, 6 no – 168 ind 2.,,dust collection line square hatch 500x700mm, 10 no – 280 ind 3.,,jh23 dust collection line, 10 inch – 10 nos (100 ind) 4.,,152 pump suction pit manholes hatch, 36 inch – 1 no (36 ind) 5.,,usg & lsg square hatch 500x700mm, 8 no – 224 ind 6.,,seal gas cooler, 24 inch – 1 no (24 ind), spare hatch 1500x500mm, 1 no – 60 ind 7.,,top gas flue chiller square hatches, 1500x500mm, 2 no – 120 ind 8.,,tgf chiller mist eliminator, 24 inch – 1 no (24 ind) for 1 time hatch opening & closing = 1036 ind total ind = 1036 x 3 = 3108 contractor scope : 1. get the work permit from area site in charge/the control room, get the sign of field controller. hot work permit and work at height permit to be taken as per job requirement. 2. job to be started after proper toolbox talk given to all contractor associates. additional work at height permit to be taken where required. page 4 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000117541 date 26.07.2024 submission date 03.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details safety talk / hirac to be carried out for the jobs to all manpower. 3. smp and hirac no must be mentioned in permit. 4. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 5. all safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. use safety belt and lifeline. work area to be barricaded. as per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. 7. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 8. crane operation for material shifting must be done by the contract supervisor. (no technicians are allowed to operate the crane) 9. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 17. if ready to use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 18. the all flange joints to be leak proof. any hot tightening required then same to be carried out as per the instruction of amns engineer. 20. shifting of all materials required for the job to be shift from work shop or main store to work area. 21. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set & welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. 22. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 23. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 24. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 25. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 26. all scrap to be cut into 1m length and scrap material to be loaded & shifted at specified location as per am/ns engineer. 4.5 27. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 28. as per management directive, transport/movement of associates to & from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material & special electrodes to be provide if required. 3. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site 4. job certification for executed jobs. 5. electrical certification will be done by am/ns electrical engineer. 6. free supply of air, water and electricity will be provided at single point. adequate lighting will also be provided. 7. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. page 5 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000117541 date 26.07.2024 submission date 03.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

44121463 tender for insulation and cladding work for cgl#3 & cgal 27021140 10 10 10 fixing of insulation work with cladding 3,000 m2 email : sandeep.patil@amns.in contact : name : sandeep patil item details : scope of the contractor related to the fixing insulation and cladding on tanks, ducts, and pipes: 1. erection of insulation and cladding on equipment’s, tanks, ducts, and pipes in cgal as per specification and drawings provided by oem. 2. rockwool mat (pro rox 960) (50 100) mm thk, with galvanised steel mesh and ss stitching wire density 100 kg/m³, with wire net and self tapping screws, aluminium sheet cladding. 3. providing skilled <(>&<)> sufficient manpower like supervisors, technicians, riggers, scaffolders, helpers to complete job in given period. 4. all the required tools, tackles, machines with consumables will be in scope of contractor. 5. insulation work will be in different sections of line at different heights from 0 to 30 meters. 6. preparation of proper scaffolding platforms as per amns safety standards for insulation work will be in scope of contractor along with certified scaffold inspector. 7. all the work required to complete the job in totality but not mentioned in sow will be in scope of contractor. 8. shifting of insulation material from storage location to cgal site. 9. open package inspection of each package with oem <(>&<)> am/ns. 10. preparation of job procedure/itp/ wps/pqr for work to be submit before commencement of work. 11. supply of welding machines, grinding machines, welding electrodes, grinding wheels. (welding rods must be procured from approved vendors by amns) 12. co ordinate with am/ns and equipment supplier for the planning of sequential and quality work execution in accordance with the best engineering practice. 13. preparing <(>&<)> taking handing over protocols with mechanical erection contractor. 14. contractor must store material properly at site and maintain proper housekeeping of working area <(>&<)> shift unwanted material at designated place. 15. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types (welding rods make must be approved from amns), cutting wheels, highspeed vibrator with leads <(>&<)> needles, brick cutter <(>&<)> muller (with hot standby mixture) etc in scope of contractor. 16. sufficient illumination to be maintain when work is in progress. lightening arrangement to be done by contractor, supply sufficient number of lamps, portable fans etc will be scope of contractor. fans <(>&<)> lamps must confirm safety standard of amns. 17. resources deployment plan to be submit as per requirement of project. 18. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. sunday will be working day. 19. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material as per amns standard and certified scaffolding inspector. safety nets to be deploy at height work safety net must confirm to is: 11057 1984, max size of net opening 10cm x 10 cm and make should be karam or equivalent. safety page 2 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details harness should contain standard double lanyard to carry tools <(>&<)> tackles while working at height. 20. all workers will deploy to height work must having height pass certified by am/ns. 21. working inside equipment/tanks must confirm to confined space entry safety protocol of amns. 22. contractor supposed to be carried out activity within sops <(>&<)> reference documents provided by am/ns are available in this link https://www.amns.in/safety/. contractor must give confirmation while submitting offer. general points 1. contractor shall depute adequate number of staff, supervisors, skilled, semi skilled <(>&<)> un skilled labours to execute the job as per the time schedule. adequate number of safety supervisors. they must execute the job in coordination with oem <(>&<)> am/ns team. 2. a qualified safety manager to be deployed with complete safety org chart. 3. a qualified <(>&<)> competent qa/qc engineer to be deployed to meet qa/qc standard of amns. 4. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 5. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. 6. contractor must follow the safety rules of am/ns. 7. opening of the boxes of the material in contractor scope. 8. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. 9. proper housekeeping of the erection area in contractor scope. 10. contractor shall provide all the personal protective items like boiler suit, frp helmet, safety shoes, reflective jacket, goggles, hand gloves, mask to all the team members according to the requirement and ensure 100% use of the same. 11. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 12. am/ns will provide the required drawings/ documents of the equipment required for the erection. the contractor shall return the same after completion of job. 13. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. 14. unwanted <(>&<)> scrape material to be shift by contractor to designated place. information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. list of tools <(>&<)> tackles to be deploy. 5. reference list for similar kind of jobs done. primary hse requirementinitial documents required to start work: 1. hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3. hira (hazard identification and risk assessment) of activities. 4. tool and tackles third party inspection certificates. 5. dedicated safety manager should depute at site with organogram of company. 6. communication contact details with mobile no. /email id. 7. list of vehicle/equipment/machines with tpi and other relevant legal page 3 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details documents. 8. list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter(note the scaffolding team will be screened by our team to verify their competency level.) scaffolding material must be approved <(>&<)> certified by tpi. some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss andconduct mock drill every month. 4. take work permit as per amns ptw system, and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. use of mobile phone is restricted while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type andalways tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standardtool lanyard and standard tool bag must be page 4 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02, dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blanket. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. 4. he should be medically fit(the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report)and should possess a valid medical fitness certificate for work at height jobs from care hospital atarcelormittal nippon steel india,hazira complex (cnh)before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall page 5 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) general points related to scaffolding: 1. prior to start any scaffolding related activity, it is mandatory to submit scaffold materials quantity and tpi along with safe work method for the same. it will help in smooth monitoring and accountability of scaffold material. 2. amns will consider only certified scaffold inspector after verifying his certificate, training, and knowledge. so, deploy a scaffolding inspector with valid certification and adequate knowledge. 3. base plate (100 x 100 x 3 mm) is mandatory for every vertical pipe while making a scaffolding. sole plate shall also be used at all unpaved area to support base plate. 4. a scaffolding platform will only be considered as fully safe after provision of all the minimum mandatory requirements/supports. 5. provision of access ladder, top <(>&<)> mid hand railing, toe board and tagging system is mandatory for each <(>&<)> every scaffolding structure. 6. appropriate barricades shall be installed to protect people in the vicinity during scaffold erection, use, modification, and dismantling. as far as practicable, barricades shall be provided by keeping a clear distance of 1.0 meter from scaffold structure. 7. fall protection when erecting, dismantling, and modifying scaffolds shall be under the direction of a competent person (scaffold supervisor/inspector). 8. scaffolds shall be designed to support at least 4 times of the anticipated weight of men/material. 9. scaffold shall be constructed at least 2 planks wide (minimum) at all the sides. onlyanti skidtype planks are allowed to be used for scaffolding structure. 10. during the erection stage of a scaffold, warning notices with the wordingscaffold incomplete, don not useshall be fixed to all the scaffold access points. 11. the status board with the wordingscaffold complete, safe for useshall be displayed when the scaffold is ready to use. 12. once erected the scaffolding shall be inspectedevery weekand recorded. scaffold after due date of inspections shall not be permitted for use without re inspection by the scaffolding inspector. 13. both erection <(>&<)> removal of scaffold shall be done through permit to work. 14. person who uses scaffold shall be trained. he shall know the safe work practices to be performed, able to assess the hazards and can take proper protective measures. 15. any non standard or damaged material shall not be used on the scaffold. those materials shall immediately declare as scrap. 16. all the material used shall be up to the amns standard and shall only be used as per its designed/designated place. any alteration shall be approved from a competent person before implying it on ground. 17. toe board shall be fixed at the platform to restrict fall of materials/person. 18. permit to work at height is mandatory for working on a scaffolding platform. also, the person working on the platform shall have valid height pass and full body harness with them. 19. contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns are available in this link https://www.amns.in/safety/. contractor must give confirmation while submitting offer. page 6 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000116371 date 08.07.2024 submission date 15.07.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details exclusions from contractor’s scope: 1. drawings, qap approved document, delivery schedule will be provided by amns. 2. insulation and cladding material will be supplied by amns. 3. electrical power <(>&<)> water at single point at cgal line...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43754941 tender for erect.& alignment of apc section of cgal 27020822 10 10 80 supply of manpower for stabilization of 200 tag 30 fab.& erection of light structure 50 ton 20 erection,alignment,testing,commissioning 1,150 ton 70 only fixing of chemical/mechanical hilti 200 no 10 erect.& align of technological structure 1,250 ton 40 dismantling of tech structure /equipment 150 ton 50 modification in structure & equipment 100 ton 60 supply & fixing of chemical hilti bolts 200 no email : sandeep.patil@amns.in contact : name : sandeep patil item details : scope of work scope of work for erection <(>&<)> alignment of after pot cooling (apc) section of continuous galvanizing <(>&<)> annealing line (cgal) brief summary of the project – am/ns, hazira is in process of installation of 1 mtpa cgal and for this we need a contractor who is specialized in continuous galvanizing line <(>&<)> annealing line for complete erection and alignments jobs which includes erection <(>&<)> alignment of technological structure, equipment of after pot cooling (apc), light structure fabrication as per the below mentioned scope. the brief description of the equipment’s under the scope will be as mentioned in below table. s. no. unit type approx. weight in mt oem 1 cgal furnace (230 tph) thickness range 0.5 to 2.5 mm width 900 1850 mm capacity 1 mtpa line speed 700 mpm max technological structure = 1250 mt equipment = 1150 mt total = 2400 mt m/s john cockerill page 2 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details total 2400 mt location of site: hazira, surat, gujarat scope of the contractor related to the erection <(>&<)> alignment of mechanical equipment : job procedure/ itp/ wps/ pqr for work to be submit before commencement of work. unloading, shifting, unpacking, and stacking of equipment/structures at the designated place (storage yard). maintaining equipment wise location tracking <(>&<)> shifting to site for erection as per requirement. open package inspection of each package with oem <(>&<)> am/ns. co ordinate with am/ns and equipment supplier for the planning of sequential and quality work execution in accordance with the best engineering practice. fixing of permanent datum marks for future reference. checking the equipment’s foundation in accordance with the erection drawing, marking of centre lines and levels with reference to the benchmark. preparing <(>&<)> taking handing over protocols with civil equipment foundations. fixing of pad plates as per required level. erection and alignment of technological structure, final cool panels, final cool casing <(>&<)> its equipment, <(>&<)> pot equipment, electrical equipment, motors, blowers, ducting, etc as per the layout <(>&<)> alignment as per the specifications of oem. erection and alignment of technological structures, platforms, gratings, handrails etc. preparation of the protocol of the final alignment <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. checking of the final alignment by concerned authority of equipment supplier <(>&<)> am/ns. correction in the alignment if found beyond tolerance limits. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. clearance for final grouting of the equipment’s. assembly of equipment’s at site, drilling tapping work (if any), page 3 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details first filling of oil and lubricants. first fill will be provided by amns. fixing of the instruments on the equipment as per the drawing. assisting in cold <(>&<)> hot commissioning of the line. attend the work if any during commissioning. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, tig welding machine, cutting wheels, wire rope for equipment lifting <(>&<)> shifting, die penetration kit for welding testing, cold bending machines for pipe bending etc in scope of contractor. all tools, tackles, consumables <(>&<)> instruments required like arc welding machines, argon welding machines, cutting sets, pug cutting machines, hydraulic jacks <(>&<)> pumps, puller, chain pulley blocks, all types <(>&<)> sizes of spanners etc. all types of measuring equipment like micrometres, vernier gauge, piano wires, total stations, torque wrenches, automatic surveyor’s level, theodolite, dial gauge, feeler gauges, slip gauges, will be in scope of contractor. all equipment’s required for storage and erection like farhana, forklift, trailers etc. and ensuring adequate number of equipment to perform parallel erection activity throughout the length 24x7. cranes <(>&<)> man lifter for erection will be provided by am/ns. all alignment tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to am/ns before commencement of work. calibration certificate must be within one month before start of work. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type <(>&<)> planks) and certified scaffolding inspector. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. all height work approach to be done with man lifters. wherever man lifter approach is not available proper scaffolding platform will be required. safety nets must be installed for fall protection for height works. safety net must confirm to is: 11057 1984, max size of net opening 10cm x 10 cm and make should be karam or equivalent. farhana f15/ f23 for internal shifting of equipment’s. (hydra is not allowed) cutting of plates for fabrication/trench covers etc to be done using pug cutter only. misc. requirement related to erection of the equipment’s. for example, hole drilling, minor slot cutting as per requirement etc. maximum working height will be 65 metre (refer to cgal ga) couple, decouple and again couple all the couplings during commissioning. assistance for balancing work of blowers as and when required (if vibration found beyond the norms during trial or commissioning). page 4 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details erection of technological structure to be done with mobile cranes. erection of apc <(>&<)> equipment to be done with mobile cranes till availability of eot crane. correction required need to be done to equipment base, minor modification in civil foundation, structural as per site condition <(>&<)> requirement of project. all structures/ equipment to be properly cleaned prior to erection and should be free from dust. resources deployment plan to be submit as per requirement of project. working hour for contactor’s manpower will 24 x 7 , or as per requirement of site condition. total no of final cool section casing are 66 nos <(>&<)> welding length in running meter of panels approximately will around 1500 meter. tentative weight breakup as follows. total tonnage (mt) 2400 structure <(>&<)> equipment weight (mt) tech structure 1250 final cool casing 160 rolls 180 ducting 150 no of rc fan (8 nos) 7.5 no of he ( 8 nos ) 12.4 apc blowers <(>&<)> plenum 80 pot equipment 295 page 5 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details scope of work specific to cgal project: erection of after pot cooling tower: apc tower with max height of 65 meters having technological structures, plenum, blowers, ducting, tanks, pot equipment <(>&<)> pot lifting arrangement and lift for manpower movement etc as per the layout <(>&<)> alignment as per the specifications of oem. equipment base padding work will be in scope of contractor, supply of masson, cement , shrinkkomp grouting cement etc as well as tools for padding will be in scope of contractor. simultaneous and sequential erection of apc structures, casing, platforms, equipment at each level must be done along with scaffolding with all safety requirements of work at height including lifelines, safety nets and proper handrails, staircase and ladders must be provided. bench mark <(>&<)> level mark to be fix at several locations as mentioned in ts. centre line for line to locate as well parallel line to centre line also to be locate for entire apc. scaffolding will be installed internally throughout as work progresses and externally as per requirement between platforms for alignment and welding work. welding of apc panels as per specifications provided by oem. testing of welded joints will as per ts and correction to be done if welding found not proper. welders deployed by contractor must have valid welder qualification certificate as per wps <(>&<)> pqr (gtaw <(>&<)> smaw process) and to be submitted to am/ns before commencement of work. final cool panel – gas tight welding to be done. panel to be full welded as per ts provided by oem. tentative quantity of apc panel welding 1500 running meter. welding test to be by dpt <(>&<)> red oxide paint to be done on welded joint. supply of paint <(>&<)> painting equipment will be in scope of contractor. alignment of apc panels , apc rolls as per ts. pressure testing of apc ,cold trail <(>&<)> hot trail to be conducted <(>&<)> corrections need to be carry out as per requirement. alignment of technological structure must confirm as per ts provided by oem. page 6 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details alignment of apc structure : columns must be set on a tolerance of ± 1.5 mm from centreline. the plumb of the columns is to be checked at each level, and each level is to be held to a tolerance of ± 5.0 mm overall from the structure foundations. equipment support beams must be set on a tolerance of ± 3 mm elevation. the elevation is to be checked at each level, and each level is to be held to this tolerance of ± 3 mm overall, and not be accumulative from the elevation below. walkie talkie arrangement must be provided for erection activity for proper communication at work at height. foundation bolt must be tightened with torque wrench as per ts <(>&<)> am/ns can ask any time to check fasteners tightening torque and contractor must fulfill the same. fabrication <(>&<)> erection of piping associated with apc which includes, air, fuel, hnx gas. all apc gaskets must create gas tight seal. all fiber fax / equivalent gasket must be coated with sterling/ equivalent varnish <(>&<)> supply of varnish will be scope of contractor. varnish must be purchased locally by an erection contractor and installed on site for all field erected equipment as needed. this ap plies to all apc accessories as well as burner and atmosphere exhaust flanges. proper coordination with refractory and insulation contractor must be done for sequential erection as per ts requirement. some sections of ducting will be in panel construction forms and not in pre assembled forms to avoid mismatch, so it will have to be fabricated and welded as per site requirements. all ducting must be cleaned thoroughly before fixing. all ducting ends must be reamed <(>&<)> cleaned (remove all shaving, slag, dirt and dust before fitting) assembly of all rolls with bearings, bearing blocks, seals and alignment of all rolls as per ts. final touch up of paint to technological structure <(>&<)> equipment as required will be scope of contractor. paint will be provided by am/ns. modifications/correction in technological structures as per site requirements. supply of shims like 0.03mm , 0.05mm, 0.1 mm as per site requirements. painting of the light structure: one coat of red oxide <(>&<)> two coat of paint. colour code as per the am/ns standard. supply of paint <(>&<)> painting equipment will be in contractor scope. working height: 10 metre to + 62 metre (refer to cgal ga) safety harness should contain standard lanyard to carry tools <(>&<)> tackles while working at height. gas cutting torch <(>&<)> nozzle must be of make : esab/messers all workers will deployed to height work must having height pass certified by am/ns. page 7 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details tools <(>&<)> tackles like wire rope sling, web sling must be brand new which is going to deploy at project site for work. penalty will be levied on vendor if equipment / structure material got damaged during handling or erection , amount will be deducted from bill to contractor. minimum 60 nos of manpower required at site to meet project requirement. this manpower projected requirement is purely tentative, this can increase as per progress of project. during trail <(>&<)> commissioning of cgal all work related for apc stabilization like pot equipment change, roll adjustment, apc equipment adjustment work etc need to be done by contractor. lighting arrangement inside of apc <(>&<)> inside of final cool assembly casing will be scope of contractor <(>&<)> must confirm confined space work <(>&<)> amns standard supply of welding rod to weld dis similar metals will be in scope of contractor as per requirement of project. in case dismantling of tech structure for alignment or modification purposes that need to be done by contractor. project tentative time schedule – unit erection start time duration (max) cgal june 2024 6 months general points contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; mill wright fitters, foreman, fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they have to execute the job in coordination with oem <(>&<)> am/ns team. a qualified safety manager to be deployed with complete safety org chart. page 8 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details a qualified <(>&<)> competent qa/qc engineer to be deploy to meet qa/qc standard of amns. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. contractor must follow the safety rules of am/ns. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. proper housekeeping of the erection area in contractor scope. contractor shall provide all the personal protective items like boiler suit, frp helmet, safety shoes, reflective jacket, goggles, hand gloves to all the team members according to the requirement and ensure 100% use of the same. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. am/ns will provide the required drawings/ documents of the equipment required for the erection. the contractor shall return the same after completion of job. shifting of scrap to the designated scrap yard. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. information to be provided in the technical offer – technical offer should have the following information’s – confirmation of all the points mentioned in am/ns inquiry. quality assurance plan. manpower deployment plan. equipment deployment plan. list of tools <(>&<)> tackles list of material handling equipment like farhana, forklift, trailers etc. reference list for similar kind of jobs in cold rolling complex. measurement criteria weight of the equipment will be as per the net weight of the equipment mentioned by the oem supplier in the invoice. page 9 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details temporary fabrication of structure for erection and alignment will not be part of light structure fabrication weight. fabricated pipeline <(>&<)> ducting (supplied by oem) will be considered as tonnage of equipment. annexure no 1 sr no. description / activity uom qty 1 erection <(>&<)> alignment of technological structure mt 1250 2 erection, alignment, testing and commissioning of apc equipment with blowers, motors mt 1150 3 fabrication and erection of light structures mt 150 4 dismantling of tech structure /equipment mt 150 5 modification in structure <(>&<)> equipment mt 100 6 supply <(>&<)> fixing of chemical hilti bolts page 10 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details nos 200 7 only fixing of chemical/mechanical hilti bolts nos 200 8 supply of manpower for stabilization of apc mandays 200 primary hse requirementinitial documents required to start work: 1.hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3.hira (hazard identification and risk assessment) of activities. 4.tool and tackles third party inspection certificates. 5.dedicated safety manager should depute at site with organogram of company. 6.communication contact details with mobile no. /email id. 7.list of vehicle/equipment/machines with tpi and other relevant legal documents. 8.list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter(note the scaffolding team will be screened by our team to verify their competency level.) scaffolding material must be approved <(>&<)> certified by tpi. some other focused requirements are as below: all workers coming at site with adequate and appropriate ppe’s. daily tbt must be done by site engineer in presence of safety person. report all incidents and near miss andconduct mock drill every month. page 11 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details take work permit as per amns ptw system and no work allowed without work permit. a permit box must be available at site. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. proper rest sheds for workers and rain cover shed for electrical equipment. in case of any lifting work, no one allowed under the suspended load. in case of working at height, valid height pass required as per amns norms. make designated assembly point on site and valid first aid box available on site. alcohol, tobacco, and smoking is strictly prohibited on site. use of mobile phone is restricted while entering in plant. all electrical equipment’s must have protected with proper earthing and elcb/rccb. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. area must be barricaded during height work. make one separate training/induction area for workers at site. only 3 pipe type torches shall be used in gas cutting set. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type andalways tied with chain in vertical straight position. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. gas cutting set must be kept in adequate trolley only. farana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. loto kit required in energy isolation work. daily checklist must be filled by farana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. safety motivational program must be done in every month for workers. height register must be maintained at site during work. during working hours one vehicle must be available at site for emergency case. page 12 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details all formats of training, safety committee meeting, mock drill will be of amns. every week and month proper submission of training records and reports. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. at height, standardtool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. all rotating parts must be covered by safety guards. walkie talkie required is mandatory for communication during working at height. body earthing must be available in porta cabin, welding machines and other electrical equipment. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. don’t store any diesel or fuel in stores at site. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02, dpc) must be available at site. make designated assembly point with display at site. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. submit tbra before night work started and inform to amns safety team. (if plan) only frp helmets allowed at site. each worker shall be provided with cover all/boiler suit. identification numbers on each tools and tackles are compulsory on site. every 50 manpower needs 1 safety officer present at site with megaphone. only industrial type ladder with flat rungs is allowed in site. wheel stopper required in each vehicle. proper earthing pit (as per amns electrical department) with testing details displayed on site. no smoking board displayed at required location. availability of sufficient fire blanket. hose and cable for gas cutting work should be of esab brand. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. adequate number of emergency rescue kit should be available at site with trained rescuers. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. page 13 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details retro reflective strips shall be pasted on each vehicle/equipment body. safety officer, electrician and site engineer must be available at site during working hours in day/night. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). the minimum work experience of the personnel is 2 years. he should be medically fit(the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report)and should possess a valid medical fitness certificate for work at height jobs from care hospital atarcelormittal nippon steel india ,hazira complex(cnh)before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) general points related to scaffolding : prior to start any scaffolding related activity, it is mandatory to submit scaffold materials quantity and tpi along with safe work method for the same. it will help in smooth monitoring and accountability of scaffold material. amns will consider only certified scaffold inspector after verifying his certificate, training, and knowledge. so, deploy a scaffolding inspector with valid certification and adequate knowledge. base plate (100 x 100 x 3 mm) is mandatory for every vertical pipe while making a scaffolding. sole plate shall also be used at all unpaved area to support base plate. a scaffolding platform will only be considered as fully safe after provision of all the minimum mandatory requirements/supports. provision of access ladder, top <(>&<)> mid hand railing, toe board and tagging system is mandatory for each <(>&<)> every scaffolding structure. appropriate barricades shall be installed to protect people in the vicinity during scaffold erection, use, modification, and dismantling. as far as practicable, barricades shall be provided by keeping a clear page 14 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details distance of 1.0 meter from scaffold structure. fall protection when erecting, dismantling, and modifying scaffolds shall be under the direction of a competent person (scaffold sup ervisor/inspector). scaffolds shall be designed to support at least 4 times of the anticipated weight of men/material. scaffold shall be constructed at least 2 planks wide (minimum) at all the sides. onlyanti skidtype planks are allowed to be used for scaffolding structure. during the erection stage of a scaffold, warning notices with the wordingscaffold incomplete, don not useshall be fixed to all the scaffold access points. the status board with the wordingscaffold complete, safe for useshall be displayed when the scaffold is ready to use. once erected the scaffolding shall be inspectedevery weekand recorded. scaffold after due date of inspections shall not be permitted for use without re inspection by the scaffolding inspector. both erection <(>&<)> removal of scaffold shall be done through permit to work. person who uses scaffold shall be trained. he shall know the safe work practices to be performed, able to assess the hazards and can take proper protective measures. any non standard or damaged material shall not be used on the scaffold. those materials shall immediately declare as scrap. all the material used shall be up to the amns standard and shall only be used as per its designed/designated place. any alteration shall be approved from a competent person before implying it on ground. toe board shall be fixed at the platform to restrict fall of materials/person. permit to work at height is mandatory for working on a scaffolding platform. also, the person working on the platform shall have valid height pass and full body harness with them. apart from these points all the general safe working method must be followed to ensure risk free working in scaffolding platform. tentative quantity of scaffolding will be = 2000 cubic meter contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns, as per annexure attached below. details documents will be shared with contractor during detailed technical discussion. sr. no sop document reference no. 1 page 15 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details safety signage <(>&<)> display of safety information amns/project/ts/hsem/18 2 night work safety amns/project/ts/hsem/05 3 lone work safety amns/project/ts/hsem/06 4 working near oh lines amns/project/ts/hsem/08 5 waste management amns/project/ts/hsem/11 6 unloading of container amns/project/ts/hsem/12 7 ppes management amns/project/ts/hsem/13 8 plant <(>&<)> machinery operation amns/project/ts/hsem/08 9 handling <(>&<)> storage of compressed gas cylinder amns/project/ts/hsem/06 10 working in confined space amns/project/ts/hsem/14 11 hot work amns/project/ts/hsem/10 12 page 16 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details hydro test amns/project/ts/hsem/06 13 work at height amns/project/ts/hsem/04 14 blasting <(>&<)> painting safety amns/project/ts/hsem/19 15 simultaneous operation amns/project/ts/hsem/17 16 management of hazardous substances amns/project/ts/hsem/15 17 structural steel fabrication <(>&<)> erection amns/project/ts/hsem/11 18 manual material handling amns/project/ts/hsem/05 19 hand tools <(>&<)> portable power tool safety amns/project/ts/hsem/07 20 age of equipment guidelines amns/safe/71 21 loto amns/project/ts/hsem/20 exclusions from contractor’s scope: drawings, qap approved document, delivery schedule will be provided by amns electrical power <(>&<)> water. am/ns will give required power for the execution of job on free of cost basis at one point. page 17 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details any structural steel, plates required for the execution of the job. equipment’s grouting job refractory <(>&<)> insulation work. cranes <(>&<)> man lifter required for equipment erection. tentative required manpower <(>&<)> resources plan: required resources, tools <(>&<)> tackles category number farhana (23 ton – 1 no, 15 ton 2 nos) 2 trailer 1 gas cutter set with trolley 4 arc welding machines (600 amp) 10 tig welding machines 5 single phase welding machine 3 grinding machines 4 tool boxes with spanner set 10 page 18 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details box spanner set 10 pug cutting machine 2 plasma cutting machine 1 induction heater set 2 oil heating set arrangement for bearing 1 torque wrenches 5 chain blocks (1 ton <(>&<)> 2 ton) 5 each chain block (5 ton <(>&<)> 10 ton ) 4 each ff2 grinder 4 portable drilling machine 2 radial drilling machine 1 magnetic drilling machine 2 thread chaser set 2 drill tapping machine 2 hydraulic jacks 10 to 50 ton 8 coupling pullers 3 grease guns page 19 of 20 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114834 date 15.06.2024 submission date 23.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 4 shim cutter 2 manual oil filling pump 2 motorised pump for oil filling 2 hand blowers 4 extension board for electrical connection 5 wire rope sling (1/2, 3/4,1) 6 pair each web sling (2 ton, 5 ton, 10 ton) 8 pair each d shackle (wll 1 ton, 5 ton, 10 ton) 8 pair each bow shackle (wll 1 ton, 5 ton, 10 ton) 4 pair each welding cable (600 amp) of 100 m <(>&<)> earthing cable 100 m of length for each welding machine electrical power panels, industrial extension boards with 100 m cables, db’s, jb’s, single core/ 3 core armoured cables etc as per requirement. (note : manpower <(>&<)> resources plan is purely indicative and will have to be increased as per front availability and project schedule requirement) ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43734332 tender for roof access ladder fabrciation and installation 7020304 10 10 10 p/fab.&ere.,paint.of ms str.for roof&cab 6.5 to 20 dismantling of sheets 105 m2 30 providing & fixing of upvc door 1 no 40 miscllanious fabrication work 6 to email : yashwant.vani@amns.in contact : 6232920739 name : vani, yashwant am/ns india mech. mai item details : scope of work for roof access ladder fabrciation and installation. 1. 3018934 p/fab.<(>&<)>ere.,paint.of ms str.for roof<(>&<)>cabfabrication and erection of roof access ladder as per drawing no. s x 02 0048, sx 02 0049 sh 1 of 2, sx 02 0049 sh 2 of 2, sx 02 0050 sh 1 of 2, sx 02 0050 sh 2 of 2 <(>&<)> sx 02 0051 all the material required for fabrication including fasteners bolts including hitti bolts wherever required will be in vendor scope. all the consumables required for fabrication will be in vendors scope. installation of all the ladders will be in vendors scope. painting of structure as per am/ns requirement will be in vendors scope including all the material.one coat of primer and two coat of synthetic enamel paint. 2.3002313 dismantling of sheets dismentaling of existing shed structure with gas cutting and shiting it inside the plant premises as per am/ns requirement. 3 3014162 providing <(>&<)> fixing of upvc door providing and fixing of upvc door of popular window of equivalant make with door closer as per below details. size (width x height) : 1500 x 2100 glass : 5mm clear toughned 1,1,1,1 color : white outer frame: 41101 19000 / 75 mm+1 mm mullion : 41101 15000 , 41101 12000/62 mm, 74 mm1.5 mm casement sash : 41101 14000 / 102 mm+1.5 mm accessories type : multi point handle type : double side door handle handle color : ncl veka hw/cmt integrated lock white hinge type : 3d hinges hinge qty/shutter : 8 4. 3011675 miscllanious fabrication work fabrication of structure without material as per am/ns requirement, all the consumables required for fabrication will be in vendors scope. general scope of work. 1. providing, fabrication <(>&<)> erection of structure material is in vendors scope. 2. vendor must visit the site to understand the requirement for ladder fabrication and submit plant for fabrication and erection. 3. transportation of the fabricated material is in vendors scope. 4. all the consumables required for fabrication <(>&<)> erection will be in vendors scope. 5. erection of fabricated structure will be in vendors scope. 6. all the fasteners for erection work will be in vendor’s scope. 7. all the material handling equipments will be in vendors scope. 8. all the tools and tackles required for erection will be in vendors scope. 9. removing of existing old storeroom structure and shifting the material inside the plant premises will be in vendors scope. 10. oxy acetylene gas cutting set to be used for gas cutting work with proper trolley, valve guard <(>&<)> flashback arrester. 11. full body shock absorber type double lanyard safety harness to be used for all work at height work. hse mendatory requirement. page 2 of 2 arcelormittal nippon steel india limited am/ns india ltd (pithampur) plot no 473 a, sector3, pithampur industrial area,district dhar,454774,madhya pradesh,india gstin 23aaace1741p1zp pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000114768 date 14.06.2024 submission date 22.06.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. aman burnwal contact email aman.burnwal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1) all personnel who will be work at height should be medically fit ( free from height phobia <(>&<)> vertigo syndrome). 2) vendor must have to submit in detailed hse plan, risk assessment, work method statements, lifting plan to amsn hse in charge before min 15 days of start of activities. 3) cup lock type scaffolding to be use, no h frame or locally fabricated structure to be use as a scaffolding. 4) ladders shall not be use as a working platform. for means of raising <(>&<)> lowering, standard ladders to be use , locally fabricated ladders are not allowed. 5) portable power tools should be in good condition. before first time use of any power tool it should be inspected by amns hse / me ch/electrical representative. dead man switch should be removed from power tool. 6) no joints allowed in electrical cables, only industrial pin tops to be use for connections. only three or five core cables to be use. 7) safety helmet, safety shoes <(>&<)> reflective jackets are the mandatory ppes, safety goggle, hand gloves, face shield, nose mask are the job specific ppes, vendor shall provide all ppes as per job requirement or as suggested by amns hse representative. 8) all gas sets should be inspected by amns hse <(>&<)> mech representatives, valve guard, flash back arrestor at both ends, nrv, pr essure gauges, cylinder trolleys, lock chain, fire blankets, fire extinguishers, experienced welder are must. use of lpg is prohibitade. 9) adequate posters, signages, warning boards, project detail boards need to be displayed at site. 10) site barricading must be implemented while executing the work. 11) dedicated supervisors need to be deployed to monitor the activities. 12) toolbox talk , work permit needs to be adopted as per amns standard. 13) vendor must have to comply with amnsi requirements, and all legal requirements enforced by state gov or central gov or district magistrate or municipal corporation or as stated by indian standard code of practices. 14) in case of any lost time injury the contract will be suspended. for repetitive kind of violations penalty will be imposed as feel required by amnsi indore plant head/hse in charg...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43382767 tender for structural erection & equipment erection 27020382 10 10 20 erection & comm.of plant equipements 160 to 30 supply of un skilled labour 2,400 tag 10 unloading & erection of structure 700 to email : gopal.thummar@amns.in contact : name : gopal thummar item details : amns scope1. drawings, qap approved document, delivery schedule will be provided by amns 2. electrical power <(>&<)> water. am/ns will give required power for the execution of job on free of cost basis at one point. 3. any structural steel, plates required for the execution of the job. 4. equipment’s grouting job scope of the contractor related to the erection <(>&<)> alignment of mechanical equipment’s : 1. job procedure/itp/ wps/pqr for work to be submit before commencement of work. 2. unloading, shifting, unpacking, and stacking of equipment/structures at the designated place (storage yard). 3. maintaining equipment wise location tracking <(>&<)> shifting to site for erection as per requirement. 4. open package inspection of each package with oem <(>&<)> am/ns. 5. co ordinate with am/ns and equipment supplier for the planning of sequential and quality work execution in accordance with the best engineering practice. 6. fixing of permanent datum marks for future reference. 7. checking the equipment’s foundation in accordance with the erection drawing, marking of centre lines and levels with reference to the benchmark. 8. preparing <(>&<)> taking handing over protocols with civil equipment foundations. 9. fixing of pad plates as per required level. 10. erection and alignment of technological structure, mechanical equipment (metallic <(>&<)> non metallic), non metallic chimney, n on metallic tanks, electrical equipment like motors, pneumatics equipment, etc as per the layout <(>&<)> alignment a specifications of oem. 11. erection and alignment of structures, platforms, gratings, handrails etc. 12. preparation of the protocol of the final alignment <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. 13. checking of the final alignment by concerned authority of equipment supplier <(>&<)> am/ns. correction needs to be done in the alignment if found beyond tolerance limits. 14. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. 15. clearance for final grouting of the equipment’s. 16. assembly of equipment at site, drilling tapping work (if any), 17. first filling of oil and lubricants. first fill will be provided by am/ns. 18. fixing of the instruments on the equipment as per the drawing. 19. assisting in cold <(>&<)> hot commissioning of the line. 20. attend the work if any during commissioning. 21. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, tig welding machine, cutting wheels, wire rope for equipment lifting <(>&<)> shifting, die penetration kit for welding page 2 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details testing, cold bending machines for pipe bending etc in scope of contractor. 22. all tools, tackles, consumables <(>&<)> instruments required like arc welding machines, argon welding machines, cutting sets, pug cutting machines, hydraulic jacks <(>&<)> pumps, puller, chain pulley blocks, all types <(>&<)> sizes of spanners etc. all types of measuring equipment like micrometres, vernier gauge, piano wires, total stations, torque wrenches, automatic surveyor’s level, theodolite, dial gauge, feeler gauges, slip gauges, will be in scope of contractor. 23. equipment’s required for material shifting, stacking and erection like farhana, forklift, trailers etc. will be in scope of contractor and ensuring adequate number of equipment to perform parallel erection activity throughout the length 24x7. 24. cranes <(>&<)> man lifter required for erection will be in scope of contractor. 25. all alignment tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to amns. 26. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type <(>&<)> planks) and certified scaffolding inspector. 27. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. 28. all height work approach to be done only with man lifter. 29. farhana f15/ f23 for internal shifting of equipment’s. (hydra is not allowed) 30. cutting of plates for fabrication/trench covers etc to be done using pug cutter only. 31. misc. requirement related to erection of the equipment’s. for example, hole drilling, minor slot cutting as per requirement etc. 32. balancing work of blowers as and when required (if vibration found beyond the norms during trial or commissioning). 33. erection of technological structure to be done with mobile cranes. 34. equipment erection to be done with mobile cranes till availability of eot crane. 35. correction required need to be done to equipment base, minor modification in civil foundation, structural material as per site c ondition <(>&<)> requirement of project. 36. all structures/ equipment to be properly cleaned prior to erection and should be free from dust. 37. resources deployment plan to be submit as per requirement of project. 38. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. scope of the contractor related to the erection <(>&<)> alignment of structure : 1. making of suitable bed for for controlled assembling of portal, columns, bracings wherever required. dismantling the bed and load ing/unloading at given area or as per instruction of amns engineer if required. 2. all machines, equipment’s, <(>&<)> tackles including jacks (manual <(>&<)> hydraulic). third party/ govt approved agency test certificate required for machinery/ tools <(>&<)> tackles/ equipment. 3. calibration certificate by third party/govt approved agency of all machineries used by contractor. 4. unloading of prefab steel structures <(>&<)> proper stacking with wooden packing at erection site or storage yard as per am/ns in structions. wooden packing shall be in scope of vendor . 5. all fasteners required for preassembly <(>&<)> erection of am/ns approved make <(>&<)> as per specs mentioned as per drawings. 6. thorough cleaning of structures to wipe of dust /muds etc. before erections shall be in scope of vendor. vendor should made appropriate arrangement for the same at site. 7. welding consumables of approved manufacturer. 8. consumables other than welding consumables such as grinding wheel, cutting wheel, buffing wheel, drill bit/ core cutter, da, oxygen etc. page 3 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details spares for machineries, tools and tackles. 9. supply of crane, farana , manlifter , trailer etc. 10. controlled assembly for columns, rafters, bracings, galleries. 11. calibrated measuring instruments required for dimensional checking. 12. manpower should be as per project requirement to meet the time line. 13. site in charge, erection foreman <(>&<)> planning engineer to expedite progress. 14. qc engineer, safety personal (certified by amns qc team). 15. adequate skilled manpower for assembling work as per project requirement. 16. qc checking <(>&<)> offer for amns inspection in prescribed format. 17. welding consumable issue record, welding consumable baking record <(>&<)> wps record. 18. daily progress report in approved format by am/ns. 19. service support during <(>&<)> after client inspection and rectification if required. 20. labour license, compliance of statutory requirements as per govt. norms <(>&<)> amns policies, pf/esic/insurance requirements. 21. processing of gate pass <(>&<)> other formalities. 22. monthly materials reconciliation report. 23. worker accommodation. 24. transportation of workers to worksite. 25. housekeeping at worksite daily area cleaning after work completion and during site evacuation. 26. ppes for workers, supervisors engaged. 27. surveyor with total stations for alignment of structures and offering for inspections. 28. safety apparatus like flashback arrester, dial gauge, conduit pipes flexible wires, db with proper rating elcb/rccb. am/ns india crm#2 project 2 29. providing lifeline, safety harness, safety/florescent jacket, fall arrester, safety net, ladder wherever required. 30. turn buckles, jacks of required capacity. 31. anywhere for whatsoever reasons due to unavailability of access for man lifters, scaffolding shall be in scope of vendor. scaffolding should be tested by scaffolding inspector. arranging scaffolding inspector shall be in scope of vendor. 32. fixing of mounting bolts for assembly wherever required. 33. levelling, alignment, <(>&<)> handing over for eot erection, 34. supply of required approved fasteners as per approved construction drg /am/ns requirement for erection work. 35. any touch paint required before erection /post erection shall be in scope of vendor. 36. header and down take pipe (roof drainage system) shall be integral part and parcel of structural erections. accordingly, vendor shall be provided with pipes of appropriate sizes duly blasted and painted. 37. all erection methodologies /method statements shall be made by contractor and shall be put for approval before am/ns. 38. tolerances in structural erection shall be according to is 12843 (latest revision). 39. vendor should follow safety in structural erection as per is 7205. 40. vendor is liable to complete their scope of work within the battery limits of height and operating radius of cranes. 41. vendor shall make appropriate arrangement of any structural erections by conventional methods, by using chain blocks, manual lif ting, using scaffolding etc in case work is not accessible by cranes ,manlifter etc. . however, lifting plans must be approved by am/ns execution and safety team. 42. qap / job procedures / wps/ pqr / submission of final quality dossier as per approved itp. 43. submission of qap/itp inspection formats, pqp (project quality plan) for approval. 44. qa/qc documentation as per amns requirement (weld visual, ndt <(>&<)> final inspection). 45. keeping qualified and competent qa/qc staffs for maintaining and monitoring quality across the entire project and mitigate/taking corrective and preventive action of any non conformity arises. page 4 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details project tentative time schedule – unit erection start time duration (max) arp 3 aug 2024 6 months general points 1. contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; mill wright fitters, foreman, fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. 2. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they have to execute the job in coordination with oem <(>&<)> am/ns team. 3. a qualified safety manager to be deployed with complete safety org chart. 4. a qualified <(>&<)> competent qa/qc engineer to be deploy to meet qa/qc standard of amns. 5. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 6. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. 7. contractor must follow the safety rules of am/ns. 8. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. 9. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. 10. proper housekeeping of the erection area in contractor scope. 11. contractor shall provide all the personal protective items like boiler suit, frp helmet, safety shoes, reflective jacket, goggles, hand gloves to all the team members according to the requirement and ensure 100% use of the same. 12. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 13. am/ns will provide the required drawings/ documents of the equipment required for the erection. the contractor shall return the same after completion of job. 14. shifting of scrap to the designated scrap yard. 15. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. equipment deployment plan. 5. list of tools <(>&<)> tackles 6. list of material handling equipment like farhana, forklift, trailers etc. 7. reference list for similar kind of jobs in cold rolling complex. measurement criteria 1. the weight of the equipment will be as per the net weight of the equipment mentioned by the oem supplier in the invoice. 2. temporary fabrication of structure for erection and alignment will not be part of light structure fabrication weight. 3. fabricated pipeline <(>&<)> ducting (supplied by oem) will be considered as tonnage of equipment. page 5 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details primary hse requirementinitial documents required to start work: 1.hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3.hira (hazard identification and risk assessment) of activities. 4.tool and tackles third party inspection certificates. 5.dedicated safety manager should depute at site with organogram of company. 6.communication contact details with mobile no. /email id. 7.list of vehicle/equipment/machines with tpi and other relevant legal documents. 8.list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter (note the scaffolding team will be screened by our team to verify their competency level.) scaffolding material must be approved <(>&<)> certified by tpi. some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss and conduct mock drill every month. 4. take work permit as per amns ptw system, and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. use of mobile phone is restricted while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type and always tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. page 6 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standard tool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02, dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blanket. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. 4. he should be medically fit (the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report) and should possess a valid medical fitness page 7 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000112424 date 14.05.2024 submission date 21.05.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. roopesh kumar contact email roopesh.kumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details certificate for work at height jobs from care hospital at arcelormittal nippon steel india, hazira complex(cnh) before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) general points related to scaffolding : 1. prior to start any scaffolding related activity, it is mandatory to submit scaffold materials quantity and tpi along with safe work method for the same. it will help in smooth monitoring and accountability of scaffold material. 2. amns will consider only certified scaffold inspector after verifying his certificate, training, and knowledge. so, deploy a scaffolding inspector with valid certification and adequate knowledge. 3. base plate (100 x 100 x 3 mm) is mandatory for every vertical pipe while making a scaffolding. sole plate shall also be used at all unpaved area to support base plate. 4. a scaffolding platform will only be considered as fully safe after provision of all the minimum mandatory requirements/supports. 5. provision of access ladder, top <(>&<)> mid hand railing, toe board and tagging system is mandatory for each <(>&<)> every scaffolding structure. 6. appropriate barricades shall be installed to protect people in the vicinity during scaffold erection, use, modification, and dismantling. as far as practicable, barricades shall be provided by keeping a clear distance of 1.0 meter from scaffold structure. 7. fall protection when erecting, dismantling, and modifying scaffolds shall be under the direction of a competent person (scaffold supervisor/inspector). 8. scaffolds shall be designed to support at least 4 times of the anticipated weight of men/material. 9. scaffold shall be constructed at least 2 planks wide (minimum) at all the sides. only anti skid type planks are allowed to be used for scaffolding structure. 10. during the erection stage of a scaffold, warning notices with the wording scaffold incomplete, don not use shall be fixed to all the scaffold access points. 11. the status board with the wording scaffold complete, safe for use shall be displayed when the scaffold is ready to use. 12. once erected the scaffolding shall be inspected every week and recorded. scaffold after due date of inspections shall not be permitted for use without re inspection by the scaffolding inspector. 13. both erection <(>&<)> removal of scaffold shall be done through permit to work. 14. person who uses scaffold shall be trained. he shall know the safe work practices to be performed, able to assess the hazards and can take proper protective measures. 15. any non standard or damaged material shall not be used on the scaffold. those materials shall immediately declare as scrap. 16. all the material used shall be up to the amns standard and shall only be used as per its designed/designated place. any alteration shall be approved from a competent person before implying it on ground. 17. toe board shall be fixed at the platform to restrict fall of materials/person. 18. permit to work at height is mandatory for working on a scaffolding platform. also, the person working on the platform shall have valid height pass and full body harness with them. apart from these points all the general safe working method must be...

Arcelor Mittal Nippon Steel India Limited - Gujarat

43085061 tender for equipment interconnecting piping work in cgal 27016816 30 10 90 fld radiography test as per scope of wrk 5,000 in 10 fabrication of carbon steel pipes 17,000 ind 20 erec carbon steel pipes, valves, & fitng 18,000 inm 50 fab & ere of ss tubing 5,000 m 80 p & f of mechanical hilti bolts 500 no 60 fab, blasting & pntg, & erec of s struc 10 to 40 erec. stnless steel pipes,valves,&fiting 11,000 inm 30 fabrication of stainless steel pipe 9,000 ind 70 chemical cleaning of cs pipeline 5,000 inm 100 miscellaneous 1 lo email : gopal.thummar@amns.in contact : name : gopal thummar item details : scope of work doc no amns/crm2/cgal/006 scope of work for fabrication, laying, <(>&<)> fixing of terminal piping for continuous galvanizing <(>&<)> annealing line (cgal) brief summary <(>&<)> scope – am/ns, hazira is in process of installation of 1 mtpa cgal and for this we need a contractor who is specialized in continuous galvanizing line <(>&<)> annealing line for pipeline fabrication, laying and fixing of ss and cs pipelines of ng, steam, air, hydrogen, nitrogen, hnx, water etc. as per below table. sr no. description / activity uom qty 1 fabrication of carbon steel pipes ind 14000 2 erection of carbon steel pipes, valves, and fittings inm 12000 3 fabrication of stainless steel pipe ind 8100 4 erection of stainless steel pipes, valves, and fittings inm 11000 5 fabrication <(>&<)> erection of instrument tubing inm 2000 6 fabrication, blasting <(>&<)> painting, and erection of support structure mt 10 7 chemical cleaning of cs pipeline inm 5000 8 providing and fixing of mechanical hilti bolts size (12 16) mm no 500 location of site: hazira, surat, gujarat scope of the contractor a) pipeline fabrication and blasting <(>&<)> painting 1. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 2. fabrication of pipe line and supports as per drawing <(>&<)> welding method will be as per specified by am/ns. 3. welders deployed by contractor must have valid welder qualification certificate as per wps <(>&<)> pqr (gtaw <(>&<)> smaw process) and to be submitted to am/ns before commencement of work. welder performance qualification test shall be performed after receiving request for inspection from the contractor. 4. the connections shall be made either by an but weld, in some special case the socket weld is allowed only in special cases, before to perform this type of welding , the erection contractor has to inform the site representative and obtain the agreement. 5. all the piping and accessories shall be but welded by tig process for root joint. the filling stages can be made with the electrode. the filler metal shall be perfectly compatible to the bare metal (analysis to be specified to us). 6. the root of weld shall be protected by the injection of inert gas in the tube during the weld stage. supply of inert gas cylinders will be in vendors scope. 7. tubes shall be prepared as per din 2559. for the preparation and performing of the work a receiving of all the welds by radiography shall be taken into account. in case of poor welds the repair and re control costs shall be charged to the contractor. 8. fabrication of spools as per drawing and minimise welding joints during erection. spools end must be protected with caps after fa page 2 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details brication. 9. in order to reduce as much as possible, the welding, the pipes of size below 1.5 inch shall be cold bent by the hydraulic bending machine. the jaws of the bending machine shall perfectly fit the diameter of the tube. when it is not possible to bend the curves cold, weld accessories should be allowed. 10. testing of joints as per ts and qap. 11. blasting and painting of pipes and supports as per ts. supply of paint material <(>&<)> painting equipment will be in contractor scope as per am/ns approved make list. 12. all the required manpower, tools and tackles for completion of work in totality. 13. preparation of beds for fabrication and painting work. 14. painting specification of pipelines is given in below table and detail specification is attached. 15. unloading, shifting, unpacking, and stacking of pipes <(>&<)> fitting at the designated place (storage yard). 16. opi will be as per amns specifications and required manpower, equipment will be supplied by contractor b) scope of work for pipeline erection 1. erection of pipelines, fittings, valves, gaskets, and accessories as per drawing and p<(>&<)>id. 2. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 3. maintaining drawing wise location of pipes <(>&<)> tracking, shifting to site for erection as per requirement 4. pre fabrication and fixing of pipe support at location in accordance with the required level. regular distance as specified by oem between supports to follow. 5. providing and fixing of chemical or mechanical hilti bolts for supports as per requirement. 6. welding of pipe joints, fittings must be done according to technical specification (ts) only. 7. threading of pipes for fitment of threaded fittings and valves wherever required will be in vendors scope. 8. all the piping shall arrange in non superposed levels, with a spacing between them and with a sufficient gap towards the bulkhead, so as to dismantle them with usual tools and particularly when the tube joining shall be made with removable fittings. 9. all the piping shall be laid without any erection difficulty. a draining shall be set at each end. an airing shall be foreseen at each high point. 10. simultaneous and sequential erection of pipeline at each level must be done along with scaffolding with all safety requirements of work at height including lifelines, safety nets and proper handrails, staircase and ladders must be provided. 11. laying of pipeline over the supports at position and fit up of joints, field welding as per specification/ ts and fixing of clamps. 12. welding of pipeline <(>&<)> joints to be done with suitable welding electrode in all pipe lines. welding electrode shall be procure as per am/ns approved make list. 13. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, cutting wheels, die penetration kit for welding testing, wire rope slings / web slings of appropriate sizes, spanners all types <(>&<)> sizes of etc. 14. all tools and tackles for lifting /shifting/erection will be in contractor’s scope. 15. all machines and tools for erection like pipe bending machines, arc welding machines, tig/argon welding machines, gas cutting sets, grinding <(>&<)> cutting machines, hydraulic jacks <(>&<)> pumps, flushing unit, pressure testing pumps etc. 16. charging of accumulators to be done as per ts. supply of filled nitrogen gas cylinder, n2 charging kit <(>&<)> all accessories will be page 3 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details in scope of contractor. 17. clamping of pipe lines as per drawing / ts. 18. co ordinate with am/ns for the planning of sequential and quality work execution in accordance with the best engineering practice. 19. preparing <(>&<)> taking handing over protocols with civil/structural dept. 20. preparation of the protocol of the erection <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. 21. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. 22. assisting in cold <(>&<)> hot trail in line commissioning. 23. all inspection <(>&<)> testing tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to am/ns. 24. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type) and certified scaffolding inspector. 25. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. 26. all height work approach to be done only with man lifter. wherever man lifter approach is not possible contractor has to prepare scaffolding platforms for pipeline erection. 27. farhana (hydra not allowed) for loading/ unloading shifting. 28. final paint touch up need to be done as required and paint and painting equipment will be in scope of contractor. 29. working height: 0 to 35 metre (refer to cgal ga) 30. penalty will be levied on vendor if equipment / structure material got damaged during handling or erection of pipe line, same amount will be deducted from bill to contractor. 31. resources deployment plan to be submit as per requirement of project. 32. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. 33. crane <(>&<)> man lifter required for erection will be provided by am/ns. wherever crane approach is not possible contractor has to place and erect pipes with chain pulley blocks. 34. pre filling of oil in hydraulic power pack will be scope of contractor 35. dp test – all socket weld joints must be dp tested by contractor. 36. any crimping job for instrumentation line or grease line will be in vendor scope. 37. no o ring or gaskets should not be damaged during installation of pipe end fitting. 38. all pipe fittings , hoses and accessories unloading and record keeping at storage area will be in contractor scope . 39. crimping tool for crimping of pneumatic piping 40. all flange and clamping bolts tightening with torque wrench 41. any extra tapping points required considering site conditions c) hydro testing 1. hydro testing of all the erected lines has to be performed by vendor/contractor. 2. final pressure testing will be 1.5 times of designed pressure by oem for hydrotest. 3. pump and all accessories for pressure testing will be in contractors scope. 4. looping of the pipeline for testing will be scope of contractor. temporary material required for looping like hoses, valves, pipe fittings, fasteners etc will be in contactor’s scope. 5. system components which may present a restriction to flow or which may be damaged by pressure testing and high flushing flow should be by passed with suitable make up pieces. 6. after hydro testing pipe lines must be flushed and dried by compressed air. 7. itp (inspection and test plan) shall be submitted for approval before pressure testing begins. page 4 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details d) flushing 1. all the pipelines must be flushed with compressed air till quality is achieved. 2. compressed air will be provided by amns at single point. 3. temporary fittings to perform flushing will be in contractors scope. 4. system components which may present a restriction to flow or which may be damaged high flushing flow should be by passed with suitable make up pieces. 5. flushing quality has to be checked with white paper to achieve zero dust. 6. carboard blasting has to performed by contractor wherever required. e) rt testing 1. pipe lines after fabrication and erection must be rt tested by contractor against each welder as per media requirement given in below table s no media rt percentage 1 water lines no rt 2 pneumatic lines no rt 3 hydraulic 10% 4 steam <(>&<)> over heated water 10% 5 nitrogen n2 10% 6 hydrogen h2 100% 7 ng gas 100% 8 h2 n2 mix gas 100% 2. all compliance related to safety has to be complied with 100% without fail. 3. vendor shall deploy radiography camera with sufficient curie strength. 4. your rso/site in charge shall collect the details of welding joints offered for radiography in the evening from amns quality in charge. 5. vendor shall submit the previous day/night generated film/ report to amns by the next day. 6. helper’s will be in vendor’s scope. 7. lighting, scaffolding <(>&<)> platform to facilitate work. 8. d7 grade film will be used but slow processing film like d4 or d5 may be asked if situation demands. 9. if any rt film is given retake by amns quality due to any issue then that segment will not be considered. 10. against failure of joint vendor will have to perform rt for 3 more joints as penalty against failed joint. f) chemical cleaning of cs hyd <(>&<)> lubrication piping : process a. degreasing: degreasing prior to pickling the pipes have to be degreased after installation if they have been ordered greased or phosphate treated. this consists in circulating during 2 hours the following solution in each pipe: aqueous degreasing solution: 8 % sodium hydroxide 0.8 % bi sodium phosphate 1.15% wetting agent b. pickling : prior to neutralisation and flushing pipes have to be pickled after installation. this consists in having during 6 hours and circulating during 2 hours the following solution (total 8 hours) in each pipe aqueous pickling solution: 8 % sulphuric acid 0.3 % inhibitor 0.5 % ammonium bi fluoride 0.1 % rust remover 0.05 rust prevention c. neutralisation : prior to flushing pipes have to be neutralised after pickling. this consists in circulating during 2 hours the following solution in each page 5 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details pipe. afterward a complete liquid removal shall be performed from the piping. the neutralising solution consists in 0.5 % sodium nitrite, 0.02 rust prevention d. drying with nitrogen: after neutralisation and prior to flushing the piping has to be dried with nitrogen. this consists in blowing nitrogen under pressure in each pipe until it is dry. immediately after the pipes drying, hydraulic oil has to be filled in the circuit. scope – 1. all the material, consumables, chemicals, pumps, tools for chemical cleaning as per above process will be in vendor scope. 2. preparation of temporary spools and loops for total process. 3. temporary hoses and fittings for looping and recirculation. 4. removal and refixing of valves, fittings which may get damaged during cleaning process. 5. proper storage and handling of chemicals as per safety protocols. 6. neutralisation of all the chemicals after process completion and proper discharge. 7. required safety ppe for handling of chemicals. g) inspection and testing amns scope 1. qap/itp approval. 2. technical specification 3. job procedures approval 4. proposed wps and final wps approval 5. fabrication and erection methodology approval 6. pqr <(>&<)> welder qualification etc. approval for lab testing process. 7. rm <(>&<)> consumable lab testing approval. vendor’s scope 1. competent person to be engaged who should be having well knowledge in inspection of fabrication and erection of piping, welding, welder qualification, incoming material inspection etc. having well versed in asme b31.3, secix, secii, secv etc as per approved itp and piping ts. 2. initial approval of engaged manpower from amns concern person is required by sharing resume and subsequent interview. inspection during fabrication 1. conducting wps/pqr, welder performance qualification test after receiving request for inspection from the contractor. 2. inspection of all incoming material and signing the reports after clearing. 3. marking dimensions checking, cutting etc. 4. piping fitup/alignment, orientation, flange alignment etc. inspection to be done as per drawing and approved wps. 5. all stagewise inspection to be carried out as per approved itp. 6. witnessing root dpt and giving clearance for further subsequent pass. 7. knowledge of film interpretation is required. 8. weld visual <(>&<)> rf pad testing (if required) inspection to be done after receiving rfi from the contractor. inspection during erection 1. inspection erection and alignment of spools valves etc. for in situ joints of above ground location <(>&<)> disposition of terminal joints, elevation, slope, identification of the components <(>&<)> support erection. 2. checking blasting, painting, climate monitoring etc. as per ts and standard. inspection during mechanical <(>&<)> post testing completion 1. checking test pack/loop files for mechanical clearance wrt isometric drawings, p<(>&<)>id etc. and providing punch points and same to be closed post compliance. 2. lhs checking wrt ndt and quality point of view, providing punch points if any and same to be closed post compliance. 3. witnessing hydro/pneumatic testing. 4. witnessing carboard blasting, air blowing etc. and box up inspection. ensuring all components to be reinstate as per the p<(>&<)>id requirement. page 6 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 5. checking all final documents and report signing as per approved itp. h) measurement criteria 1. welded joints of pipe fitting will be calculated in inch diameter. 2. pipe laying will be calculated in inch meter. no separate billing will be claimed for cold bends, will be also a part of pipe laying in inch meter. 3. one flange joint in the pipeline will be considered as per the size in inch diameter. 4. installation charges of valves, bellows, strainers in pipe fitting will be considered as 1 meter straight pipe length. 5. fabrication of pipeline mentioned in inch diameter as uom will be measured on basis of dn. 6. fabrication of special fittings such as reducers, tee branches of pipe fitting will be calculated as per welding in running inch diameter. 7. pipe and tube size less than 1 inch will be calculated as per actual running weld in inch diameter <(>&<)> actual length in inch meter. tubing will be part of piping scope. 8. any hydraulic fittings which will be fitted on pipe, will not be claimed in billing. 9. no separate bill will be claimed for pipe clamping, pressure testing <(>&<)> flushing of pipeline, it will be covered in pipe erection. i) project tentative time schedule – unit erection start time duration (max) cgal feb 24 8 months j) general points 1. contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. 2. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they must execute the job in coordination with oem <(>&<)> am/ns team. 3. a qualified <(>&<)> competent safety manager to be deployed with complete safety org chart. 4. a qualified <(>&<)> competent qa/qc engineer to be deployed to meet qa/qc standard of amns 5. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 6. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. no space is available on site for accommodation. 7. contractor must follow the safety rules of am/ns. 8. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. 9. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. 10. proper housekeeping of the erection area in contractor scope. 11. contractor shall provide all the personal protective items like helmet, safety shoes, safety jacket to all the team members according to the requirement and ensure 100% use of the same. 12. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 13. am/ns will provide the required drawings/ documents required for erection. page 7 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 14. shifting of scrap to the designated scrap yard. 15. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. 16. any revise drawing job and modification in line as per site condition should be in contractor scope. 17. safety kit/first aid box, flashback arrestor, dial guage, conduit piping, flexible wires, electrical db with proper rating elcb/rccb will be contractor scope. 18. manpower support for acid disposal tank and housekeeping activity after execution of job at work will be in contractor scope. k) information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. equipment deployment plan. 5. list of tools <(>&<)> tackles 6. list of material handling equipment like farhana, forklift, trailers etc. 7. reference list for similar kind of jobs in cold rolling complex. e. start up commissioning <(>&<)> final acceptance (general) scope the contractor shall provide necessary equipment, tools, tackles, instruments, labor, supervision etc. for the following: a) prepare piping for trial and start up. b) start up and commissioning piping c) final acceptance. preparation of piping for trial and start up: the contractor shall provide adequate personnel as approved by the site in charge to assist the equipment supplier and operating personnel of amnsi in starting up and commissioning of piping as well as for adjustments, repairs, and rectifications of defects in erection of the piping during commissioning of the equipment. the contractor shall adjust piping as required by the equipment supplier with the approval of the site in charge (amnsi). the contractor shall be required to clean up the piping and prepare it for trial runs and operation in accordance with the equipment supplier’s instructions. the contractor shall bring to site such equipment, tools, instruments, labor etc. as it is deemed necessary to cater for the work, which shall include but not limited to the following. 1. clean up dirt, remove any protective coating applied by the manufacturer, clean ventilating openings and remove all visible foreign bodies from the equipment erected. 2. all flanges, inlet and outlet connections etc. shall be checked for tightness. 3. blow down all piping systems, install and remove strainers in piping and equipment as required. 4. any modification related to hydraulic power pack piping <(>&<)> hydraulic piping supplied by oem need to be done by contractor 5. any piping cleaning need to be done by pre fitted provided by oem( removing, cleaning <(>&<)> fitting of all pipes <(>&<)> joint) 6. replacement of oil fitter during trail will be in scope of contractor if at any time during trials and commissioning, till the piping is finally accepted, any part or parts either structural or belonging to the required to be opened for inspection and checking by the equipment supplier/site in charge (amnsi), this shall be done by the contractor and the parts should be properly refitted and satisfactorily tried after refitting. if it is established that the defects are due to bad workmanship during installation and/or materials, which are within the scope of the contractor’s supply, the charges for all rectification work inclusive of labour, materials and supervision used will be borne by the contractor. until the piping are finally accepted by m/s amnsi and taken over after page 8 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details the successful commissioning, the contractor shall be responsible for any loss/ damage theft etc. for the piping erected by him. l) primary hse requirementinitial documents required to start work: 1. hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3. hira (hazard identification and risk assessment) of activities. 4. tool and tackles third party inspection certificates. 5. dedicated safety manager should be depute at site with organogram of company. 6. communication contact details with mobile no. /email id. 7. list of vehicle/equipment/machines with tpi and other relevant legal documents. 8. list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter (note the scaffolding team will be screened by our team to verify their competency level.) some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss and conduct mock drill every month. 4. take work permit as per amns ptw system and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. mobile phones are not allowed while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type and always tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farhana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farhana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team page 9 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standard tool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02 ,dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blankets/tarpaulin with mtc. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. page 10 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 4. he should be medically fit (the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report ) and should possess a valid medical fitness certificate for work at height jobs from care hospital at arcelormittal nippon steel india, hazira complex(cnh) before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns, as per annexure attached below. details documents will be shared with contractor during detailed technical discussion. sr. no sop document reference no. 1 safety signage <(>&<)> display of safety information amns/project/ts/hsem/18 2 night work safety amns/project/ts/hsem/05 3 lone work safety amns/project/ts/hsem/06 4 working near oh lines amns/project/ts/hsem/08 5 waste management amns/project/ts/hsem/11 6 unloading of container amns/project/ts/hsem/12 7 ppes management amns/project/ts/hsem/13 8 plant <(>&<)> machinery operation amns/project/ts/hsem/08 9 handling <(>&<)> storage of compressed gas cylinder amns/project/ts/hsem/06 10 working in confined space amns/project/ts/hsem/14 11 hot work amns/project/ts/hsem/10 12 hydro test amns/project/ts/hsem/06 13 work at height amns/project/ts/hsem/04 14 blasting <(>&<)> painting safety amns/project/ts/hsem/19 15 simultaneous operation amns/project/ts/hsem/17 16 management of hazardous substances amns/project/ts/hsem/15 17 structural steel fabrication <(>&<)> erection amns/project/ts/hsem/11 18 manual material handling amns/project/ts/hsem/05 19 hand tools <(>&<)> portable power tool safety amns/project/ts/hsem/07 20 age of equipment guidelines amns/safe/71 21 loto amns/project/ts/hsem/20 m) amns scope 1. drawings, qap approved document, delivery schedule will be provided by amns 2. providing essentials like power and water at work site on single point only. 3. lifting and handling equipment’s / eot/ man lifter will be in amns scope. 4. supply of hydraulic oil <(>&<)> flushing oil. 5. raw pipe , elbow, union, tee, reducer, coupling, adaptor, valves, cap, flange, hoses, angles channels etc. 6. raw material for pipe supports. 7. supply of n2 and ca compressed air. 8. electricity will be provided at single point near entry <(>&<)> exit area of shed. n) tentative required manpower <(>&<)> resources plan: (note : manpower <(>&<)> resources plan is purely indicative and will have to be increased as per front availability and project schedule requirement) required manpower page 11 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details category number project manager 1 safety manager 1 safety supervisors 2 admin 1 qa/qc engineer 1 scaffold inspector 1 site engineers 2 surveyor 1 storekeeper 1 supervisors 4 foreman 3 structure fitter 2 pipe fitter 6 welders 7 gas cutter 3 grinder/ cutter 6 riggers 15 scaffolders 12 helpers 20 electrician 1 housekeeping manpower 5 blaster <(>&<)> painter 3 farhana, trailer 2 total 100 required resources, tools <(>&<)> tackles category number farhana (15 ton) 1 gas cutter set with trolley 4 arc welding machines (600 amp) 4 tig welding machines 4 single phase welding machine 3 grinding/ cutting machines 10 toolboxes with spanner set 3 box spanner set 3 torque wrenches 2 chain blocks (1 ton, 2 ton <(>&<)> 5 ton) 2 each ff2 grinder 4 portable drilling machine 2 hilti bolt drilling machine 1 pipe bending machine 4 motorised pump for oil filling 1 extension board for electrical connection 5 manual pump for oil 2 web sling (2 ton, 5 ton, 10 ton) 5 pair each d shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each bow shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each welding cable (600 amp) of 100 m <(>&<)> earthing cable 100 m of length for each welding machine 1 lot electrical power panels, industrial extension boards with 100 m cables, db’s, jb’s, single core/ 3 core armoured cables etc as per requirement. 1 lot hydro testing pump with accessories 1 air compressor for pressure testing and flushing 1 pipe cleaning setup with accessories and chemicals 1 set blasting and painting machine with accessories 1 set temporary hoses, valves, and fittings 1 lot page 12 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details item note : 2 27016816 40 20 30 fabrication of stainless steel pipe 24,000 ind 20 erec carbon steel pipes, valves, & fitng 30,000 inm 40 erec. stnless steel pipes,valves,&fiting 8,000 inm 70 p & f of mechanical hilti bolts 500 no 50 fab & ere of ss tubing 10,000 m 60 fab, blasting & pntg, & erec of s struc 10 to 10 fabrication of carbon steel pipes 60,000 ind 80 fld radiography test as per scope of wrk 100,000 in 90 miscellaneous 1 lo email : gopal.thummar@amns.in contact : name : gopal thummar item details : scope of work doc no amns/crm2/cgal/007 scope of work for fabrication, laying, <(>&<)> fixing of furnace piping for continuous galvanizing <(>&<)> annealing line (cgal) brief summary <(>&<)> scope – am/ns, hazira is in process of installation of 1 mtpa cgal and for this we need a contractor who is specialized in continuous galvanizing line <(>&<)> annealing line for pipeline fabrication, laying and fixing of ss and cs pipelines of ng, steam, air, hydrogen, nitrogen, hnx, water etc. as per below table. sr no. description / activity uom qty 1 fabrication of carbon steel pipes ind 59000 2 erection of carbon steel pipes, valves, and fittings inm 30000 3 fabrication of stainless steel pipe ind 24000 4 erection of stainless steel pipes, valves, and fittings inm 7200 5 fabrication <(>&<)> erection of instrument tubing inm 2000 6 fabrication, blasting <(>&<)> painting, and erection of support structure mt 10 7 providing and fixing of mechanical hilti bolts size (12 16) mm no 500 location of site: hazira, surat, gujarat scope of the contractor a) pipeline fabrication and blasting <(>&<)> painting 1. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 2. fabrication of pipe line and supports as per drawing <(>&<)> welding method will be as per specified by am/ns. 3. welders deployed by contractor must have valid welder qualification certificate as per wps <(>&<)> pqr (gtaw <(>&<)> smaw process) and to be submitted to am/ns before commencement of work. welder performance qualification test shall be performed after receiving request for inspection from the contractor. 4. the connections shall be made either by an but weld, in some special case the socket weld is allowed only in special cases, before to perform this type of welding , the erection contractor has to inform the site representative and obtain the agreement. 5. all the piping and accessories shall be but welded by tig process for root joint. the filling stages can be made with the electrode. the filler metal shall be perfectly compatible to the bare metal (analysis to be specified to us). 6. the root of weld shall be protected by the injection of inert gas in the tube during the weld stage. supply of inert gas cylinders will be in vendors scope. 7. tubes shall be prepared as per din 2559. for the preparation and performing of the work a receiving of all the welds by radiography shall be taken into account. in case of poor welds the repair and re control costs shall be charged to the contractor. 8. fabrication of spools as per drawing and minimise welding joints during erection. spools end must be protected with caps after fa brication. 9. in order to reduce as much as possible, the welding, the pipes of size below 1.5 inch shall be cold bent by the hydraulic bending machine. the jaws of the bending machine shall perfectly fit the diameter of the tube. when it is not possible to bend the curves cold, weld accessories should be allowed. 10. testing of joints as per ts and qap. 11. blasting and painting of pipes and supports as per ts. supply of paint material <(>&<)> painting equipment will be in contractor scope as per am/ns approved make list. 12. all the required manpower, tools and tackles for completion of work page 13 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details in totality. 13. preparation of beds for fabrication and painting work. 14. painting specification of pipelines is given in below table and detail specification is attached. 15. unloading, shifting, unpacking, and stacking of pipes <(>&<)> fitting at the designated place (storage yard). 16. opi will be as per amns specifications and required manpower, equipment will be supplied by contractor b) scope of work for pipeline erection 1. erection of pipelines, fittings, valves, gaskets, and accessories as per drawing and p<(>&<)>id. 2. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 3. maintaining drawing wise location of pipes <(>&<)> tracking, shifting to site for erection as per requirement 4. pre fabrication and fixing of pipe support at location in accordance with the required level. regular distance as specified by oem between supports to follow. 5. providing and fixing of chemical or mechanical hilti bolts for supports as per requirement. 6. welding of pipe joints, fittings must be done according to technical specification (ts) only. 7. threading of pipes for fitment of threaded fittings and valves wherever required will be in vendors scope. 8. all the piping shall arrange in non superposed levels, with a spacing between them and with a sufficient gap towards the bulkhead, so as to dismantle them with usual tools and particularly when the tube joining shall be made with removable fittings. 9. all the piping shall be laid without any erection difficulty. a draining shall be set at each end. an airing shall be foreseen at each high point. 10. simultaneous and sequential erection of pipeline at each level must be done along with scaffolding with all safety requirements of work at height including lifelines, safety nets and proper handrails, staircase and ladders must be provided. 11. laying of pipeline over the supports at position and fit up of joints, field welding as per specification/ ts and fixing of clamps. 12. welding of pipeline <(>&<)> joints to be done with suitable welding electrode in all pipe lines. welding electrode shall be procure as per am/ns approved make list. 13. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, cutting wheels, die penetration kit for welding testing, wire rope slings / web slings of appropriate sizes, spanners all types <(>&<)> sizes of etc. 14. all tools and tackles for lifting /shifting/erection will be in contractor’s scope. 15. all machines and tools for erection like pipe bending machines, arc welding machines, tig/argon welding machines, gas cutting sets, grinding <(>&<)> cutting machines, hydraulic jacks <(>&<)> pumps, flushing unit, pressure testing pumps etc. 16. charging of accumulators to be done as per ts. supply of filled nitrogen gas cylinder, n2 charging kit <(>&<)> all accessories will be in scope of contractor. 17. clamping of pipe lines as per drawing / ts. 18. co ordinate with am/ns for the planning of sequential and quality work execution in accordance with the best engineering practice. 19. preparing <(>&<)> taking handing over protocols with civil/structural dept. 20. preparation of the protocol of the erection <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. 21. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. page 14 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 22. assisting in cold <(>&<)> hot trail in line commissioning. 23. all inspection <(>&<)> testing tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to am/ns. 24. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type) and certified scaffolding inspector. 25. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. 26. all height work approach to be done only with man lifter. wherever man lifter approach is not possible contractor has to prepare scaffolding platforms for pipeline erection. 27. farhana (hydra not allowed) for loading/ unloading shifting. 28. final paint touch up need to be done as required and paint and painting equipment will be in scope of contractor. 29. working height: 0 to 35 metre (refer to cgal ga) 30. penalty will be levied on vendor if equipment / structure material got damaged during handling or erection of pipe line, same amount will be deducted from bill to contractor. 31. resources deployment plan to be submit as per requirement of project. 32. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. 33. crane <(>&<)> man lifter required for erection will be provided by am/ns. wherever crane approach is not possible contractor has to place and erect pipes with chain pulley blocks. 34. pre filling of oil in hydraulic power pack will be scope of contractor 35. dp test – all socket weld joints must be dp tested by contractor. 36. any crimping job for instrumentation line or grease line will be in vendor scope. 37. no o ring or gaskets should not be damaged during installation of pipe end fitting. 38. all pipe fittings , hoses and accessories unloading and record keeping at storage area will be in contractor scope . 39. crimping tool for crimping of pneumatic piping 40. all flange and clamping bolts tightening with torque wrench 41. any extra tapping points required considering site conditions c) hydro testing 1. hydro testing of all the erected lines has to be performed by vendor/contractor. 2. final pressure testing will be 1.5 times of designed pressure by oem for hydrotest. 3. pump and all accessories for pressure testing will be in contractors scope. 4. looping of the pipeline for testing will be scope of contractor. temporary material required for looping like hoses, valves, pipe fittings, fasteners etc will be in contactor’s scope. 5. system components which may present a restriction to flow or which may be damaged by pressure testing and high flushing flow should be by passed with suitable make up pieces. 6. after hydro testing pipe lines must be flushed and dried by compressed air. 7. itp (inspection and test plan) shall be submitted for approval before pressure testing begins. d) flushing 1. all the pipelines must be flushed with compressed air till quality is achieved. 2. compressed air will be provided by amns at single point. 3. temporary fittings to perform flushing will be in contractors scope. 4. system components which may present a restriction to flow or which may be damaged high flushing flow should be by passed with suitable make up pieces. 5. flushing quality has to be checked with white paper to achieve zero dust. page 15 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 6. carboard blasting has to performed by contractor wherever required. e) rt testing 1. pipe lines after fabrication and erection must be rt tested by contractor against each welder as per media requirement given in below table s no media rt percentage 1 water lines no rt 2 pneumatic lines no rt 3 hydraulic 10% 4 steam <(>&<)> over heated water 10% 5 nitrogen n2 10% 6 hydrogen h2 100% 7 ng gas 100% 8 h2 n2 mix gas 100% 2. all compliance related to safety has to be complied with 100% without fail. 3. vendor shall deploy radiography camera with sufficient curie strength. 4. your rso/site in charge shall collect the details of welding joints offered for radiography in the evening from amns quality in charge. 5. vendor shall submit the previous day/night generated film/ report to amns by the next day. 6. helper’s will be in vendor’s scope. 7. lighting, scaffolding <(>&<)> platform to facilitate work. 8. d7 grade film will be used but slow processing film like d4 or d5 may be asked if situation demands. 9. if any rt film is given retake by amns quality due to any issue then that segment will not be considered. 10. against failure of joint vendor will have to perform rt for 3 more joints as penalty against failed joint. f) inspection and testing amns scope 1. qap/itp approval. 2. technical specification 3. job procedures approval 4. proposed wps and final wps approval 5. fabrication and erection methodology approval 6. pqr <(>&<)> welder qualification etc. approval for lab testing process. 7. rm <(>&<)> consumable lab testing approval. vendor’s scope 1. competent person to be engaged who should be having well knowledge in inspection of fabrication and erection of piping, welding, welder qualification, incoming material inspection etc. having well versed in asme b31.3, secix, secii, secv etc as per approved itp and piping ts. 2. initial approval of engaged manpower from amns concern person is required by sharing resume and subsequent interview. inspection during fabrication 1. conducting wps/pqr, welder performance qualification test after receiving request for inspection from the contractor. 2. inspection of all incoming material and signing the reports after clearing. 3. marking dimensions checking, cutting etc. 4. piping fitup/alignment, orientation, flange alignment etc. inspection to be done as per drawing and approved wps. 5. all stagewise inspection to be carried out as per approved itp. 6. witnessing root dpt and giving clearance for further subsequent pass. 7. knowledge of film interpretation is required. 8. weld visual <(>&<)> rf pad testing (if required) inspection to be done after receiving rfi from the contractor. inspection during erection 1. inspection erection and alignment of spools valves etc. for in situ joints of above ground location <(>&<)> disposition of terminal joints, elevation, slope, identification of the components <(>&<)> page 16 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details support erection. 2. checking blasting, painting, climate monitoring etc. as per ts and standard. inspection during mechanical <(>&<)> post testing completion 1. checking test pack/loop files for mechanical clearance wrt isometric drawings, p<(>&<)>id etc. and providing punch points and same to be closed post compliance. 2. lhs checking wrt ndt and quality point of view, providing punch points if any and same to be closed post compliance. 3. witnessing hydro/pneumatic testing. 4. witnessing carboard blasting, air blowing etc. and box up inspection. ensuring all components to be reinstate as per the p<(>&<)>id requirement. 5. checking all final documents and report signing as per approved itp. g) measurement criteria 1. welded joints of pipe fitting will be calculated in inch diameter. 2. pipe laying will be calculated in inch meter. no separate billing will be claimed for cold bends, will be also a part of pipe laying in inch meter. 3. one flange joint in the pipeline will be considered as per the size in inch diameter. 4. installation charges of valves, bellows, strainers in pipe fitting will be considered as 1 meter straight pipe length. 5. fabrication of pipeline mentioned in inch diameter as uom will be measured on basis of dn. 6. fabrication of special fittings such as reducers, tee branches of pipe fitting will be calculated as per welding in running inch diameter. 7. pipe and tube size less than 1 inch will be calculated as per actual running weld in inch diameter <(>&<)> actual length in inch meter. tubing will be part of piping scope. 8. any hydraulic fittings which will be fitted on pipe, will not be claimed in billing. 9. no separate bill will be claimed for pipe clamping, pressure testing <(>&<)> flushing of pipeline, it will be covered in pipe erection. h) project tentative time schedule – unit erection start time duration (max) cgal feb 24 8 months i) general points 1. contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. 2. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they must execute the job in coordination with oem <(>&<)> am/ns team. 3. a qualified <(>&<)> competent safety manager to be deployed with complete safety org chart. 4. a qualified <(>&<)> competent qa/qc engineer to be deployed to meet qa/qc standard of amns 5. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 6. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. no space is available on site for accommodation. 7. contractor must follow the safety rules of am/ns. page 17 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 8. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. 9. packing list received from material boxes to be submitted to amns. loose items to be kept properly in rack/boxes. 10. proper housekeeping of the erection area in contractor scope. 11. contractor shall provide all the personal protective items like helmet, safety shoes, safety jacket to all the team members according to the requirement and ensure 100% use of the same. 12. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 13. am/ns will provide the required drawings/ documents required for erection. 14. shifting of scrap to the designated scrap yard. 15. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. 16. any revise drawing job and modification in line as per site condition should be in contractor scope. 17. safety kit/first aid box, flashback arrestor, dial guage, conduit piping, flexible wires, electrical db with proper rating elcb/rccb will be contractor scope. 18. manpower support for acid disposal tank and housekeeping activity after execution of job at work will be in contractor scope. j) information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. equipment deployment plan. 5. list of tools <(>&<)> tackles 6. list of material handling equipment like farhana, forklift, trailers etc. 7. reference list for similar kind of jobs in cold rolling complex. e. start up commissioning <(>&<)> final acceptance (general) scope the contractor shall provide necessary equipment, tools, tackles, instruments, labor, supervision etc. for the following: a) prepare piping for trial and start up. b) start up and commissioning piping c) final acceptance. preparation of piping for trial and start up: the contractor shall provide adequate personnel as approved by the site in charge to assist the equipment supplier and operating personnel of amnsi in starting up and commissioning of piping as well as for adjustments, repairs, and rectifications of defects in erection of the piping during commissioning of the equipment. the contractor shall adjust piping as required by the equipment supplier with the approval of the site in charge (amnsi). the contractor shall be required to clean up the piping and prepare it for trial runs and operation in accordance with the equipment supplier’s instructions. the contractor shall bring to site such equipment, tools, instruments, labor etc. as it is deemed necessary to cater for the work, which shall include but not limited to the following. 1. clean up dirt, remove any protective coating applied by the manufacturer, clean ventilating openings and remove all visible foreign bodies from the equipment erected. 2. all flanges, inlet and outlet connections etc. shall be checked for tightness. 3. blow down all piping systems, install and remove strainers in piping and equipment as required. 4. any modification related to hydraulic power pack piping <(>&<)> hydraulic piping supplied by oem need to be done by contractor 5. any piping cleaning need to be done by pre fitted provided by oem( removing, cleaning <(>&<)> fitting of all pipes <(>&<)> joint) 6. replacement of oil fitter during trail will be in scope of contractor page 18 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details if at any time during trials and commissioning, till the piping is finally accepted, any part or parts either structural or belonging to the required to be opened for inspection and checking by the equipment supplier/site in charge (amnsi), this shall be done by the contractor and the parts should be properly refitted and satisfactorily tried after refitting. if it is established that the defects are due to bad workmanship during installation and/or materials, which are within the scope of the contractor’s supply, the charges for all rectification work inclusive of labour, materials and supervision used will be borne by the contractor. until the piping are finally accepted by m/s amnsi and taken over after the successful commissioning, the contractor shall be responsible for any loss/ damage theft etc. for the piping erected by him. k) primary hse requirementinitial documents required to start work: 1. hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3. hira (hazard identification and risk assessment) of activities. 4. tool and tackles third party inspection certificates. 5. dedicated safety manager should be depute at site with organogram of company. 6. communication contact details with mobile no. /email id. 7. list of vehicle/equipment/machines with tpi and other relevant legal documents. 8. list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter (note the scaffolding team will be screened by our team to verify their competency level.) some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss and conduct mock drill every month. 4. take work permit as per amns ptw system and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. mobile phones are not allowed while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and page 19 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details as per category with 6m distance from one to another type and always tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farhana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farhana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standard tool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02 ,dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blankets/tarpaulin with mtc. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at page 20 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. 4. he should be medically fit (the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report ) and should possess a valid medical fitness certificate for work at height jobs from care hospital at arcelormittal nippon steel india, hazira complex(cnh) before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns, as per annexure attached below. details documents will be shared with contractor during detailed technical discussion. sr. no sop document reference no. 1 safety signage <(>&<)> display of safety information amns/project/ts/hsem/18 2 night work safety amns/project/ts/hsem/05 3 lone work safety amns/project/ts/hsem/06 4 working near oh lines amns/project/ts/hsem/08 5 waste management amns/project/ts/hsem/11 6 unloading of container amns/project/ts/hsem/12 7 ppes management amns/project/ts/hsem/13 8 plant <(>&<)> machinery operation amns/project/ts/hsem/08 9 handling <(>&<)> storage of compressed gas cylinder amns/project/ts/hsem/06 10 working in confined space amns/project/ts/hsem/14 11 hot work amns/project/ts/hsem/10 12 hydro test amns/project/ts/hsem/06 13 work at height amns/project/ts/hsem/04 14 blasting <(>&<)> painting safety amns/project/ts/hsem/19 15 simultaneous operation amns/project/ts/hsem/17 16 management of hazardous substances amns/project/ts/hsem/15 17 structural steel fabrication <(>&<)> erection amns/project/ts/hsem/11 18 manual material handling amns/project/ts/hsem/05 19 hand tools <(>&<)> portable power tool safety amns/project/ts/hsem/07 20 age of equipment guidelines amns/safe/71 21 loto amns/project/ts/hsem/20 l) amns scope 1. drawings, qap approved document, delivery schedule will be provided by amns 2. providing essentials like power and water at work site on single point only. 3. lifting and handling equipment’s / eot/ man lifter will be in amns scope. 4. supply of hydraulic oil <(>&<)> flushing oil. page 21 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 5. raw pipe , elbow, union, tee, reducer, coupling, adaptor, valves, cap, flange, hoses, angles channels etc. 6. raw material for pipe supports. 7. supply of n2 and ca compressed air. 8. electricity will be provided at single point near entry <(>&<)> exit area of shed. m) tentative required manpower <(>&<)> resources plan: (note : manpower <(>&<)> resources plan is purely indicative and will have to be increased as per front availability and project schedule requirement) required manpower category number project manager 1 safety manager 1 safety supervisors 2 admin 1 qa/qc engineer 1 scaffold inspector 1 site engineers 2 surveyor 1 storekeeper 1 supervisors 5 foreman 4 structure fitter 3 pipe fitter 7 welders 10 gas cutter 3 grinder/ cutter 10 riggers 25 scaffolders 20 helpers 30 electrician 1 housekeeping manpower 10 blaster <(>&<)> painter 5 farhana, trailer 2 total 150 required resources, tools <(>&<)> tackles category number farhana (15 ton) 1 trailer 1 gas cutter set with trolley 4 arc welding machines (600 amp) 4 tig welding machines 4 single phase welding machine 3 grinding/ cutting machines 10 toolboxes with spanner set 3 box spanner set 3 torque wrenches 2 chain blocks (1 ton, 2 ton <(>&<)> 5 ton) 2 each ff2 grinder 4 portable drilling machine 2 hilti bolt drilling machine 1 pipe bending machine 4 motorised pump for oil filling 1 extension board for electrical connection 5 manual pump for oil 2 web sling (2 ton, 5 ton, 10 ton) 5 pair each d shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each bow shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each welding cable (600 amp) of 100 m <(>&<)> earthing cable 100 m of length for each welding machine 1 lot electrical power panels, industrial extension boards with 100 m cables, db’s, jb’s, single core/ 3 core armoured cables etc as per requirement. 1 lot hydro testing pump with accessories 1 page 22 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details air compressor for pressure testing and flushing 1 blasting and painting machine with accessories 1 set temporary hoses, valves, and fittings 1 lot item note : 3 27016816 50 30 20 erec. stnless steel pipes,valves,&fiting 12,000 inm 10 fabrication of stainless steel pipe 7,000 ind 40 fab, blasting & pntg, & erec of s struc 5 to 50 p & f of mechanical hilti bolts 500 no 30 fab & ere of ss tubing 3,000 m 60 fld radiography test as per scope of wrk 7,500 in 70 miscellaneous 1 lo email : gopal.thummar@amns.in contact : name : gopal thummar item details : scope of work doc no amns/crm2/cgal/008 scope of work for fabrication, laying, <(>&<)> fixing of hydraulic piping for continuous galvanizing <(>&<)> annealing line (cgal) brief summary <(>&<)> scope – am/ns, hazira is in process of installation of 1 mtpa cgal and for this we need a contractor who is specialized in continuous galvanizing line <(>&<)> annealing line for pipeline fabrication, laying and fixing of hydraulic piping sr no. description / activity uom qty 1 fabrication of stainless steel pipe ind 6900 2 erection of stainless steel pipes, valves, and fittings inm 12000 3 fabrication <(>&<)> erection of instrument tubing inm 2000 4 fabrication, blasting <(>&<)> painting, and erection of support structure mt 5 5 providing and fixing of mechanical hilti bolts size (12 16) mm no 500 location of site: hazira, surat, gujarat scope of the contractor a) pipeline fabrication 1. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 2. fabrication of pipe line and supports as per drawing <(>&<)> welding method will be as per specified by am/ns. 3. welders deployed by contractor must have valid welder qualification certificate as per wps <(>&<)> pqr and to be submitted to am/ns before commencement of work. welder performance qualification test shall be performed after receiving request for inspection from the contractor. 4. all the piping and accessories shall be but welded by tig process only. 5. the root of weld shall be protected by the injection of inert gas in the tube during the weld stage. supply of inert gas cylinders will be in vendors scope. 6. tubes shall be prepared as per din 2559. for the preparation and performing of the work a receiving of all the welds by radiography shall be taken into account. in case of poor welds the repair and re control costs shall be charged to the contractor. 7. fabrication of spools as per drawing and minimise welding joints during erection. spools end must be protected with caps after fa brication. 8. in order to reduce as much as possible, the welding, the pipes of size below 1.5 inch shall be cold bent by the hydraulic bending machine. the jaws of the bending machine shall perfectly fit the diameter of the tube. when it is not possible to bend the curves cold, weld accessories should be allowed. 9. testing of joints as per ts and qap. 10. painting of supports as per ts. supply of paint material <(>&<)> page 23 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details painting equipment will be in contractor scope as per am/ns approved make list. 11. all the required manpower, tools and tackles for completion of work in totality. 12. unloading, shifting, unpacking, and stacking of pipes, fittings, valves accessories, support structure at the designated place (storage yard). 13. opi will be as per amns specifications and required manpower, equipment will be supplied by contractor b) scope of work for pipeline erection 1. erection of pipelines, fittings, valves, gaskets, and accessories as per drawing and p<(>&<)>id. 2. job procedure / wps/ pqr/itp for work to be submit before commencement of job. 3. maintaining drawing wise location of pipes <(>&<)> tracking, shifting to site for erection as per requirement 4. pre fabrication and fixing of pipe support at location in accordance with the required level. regular distance as specified by oem between supports to follow. 5. fixing piping up to end position of machine piping will be desirable and under contractor’s scope. 6. support painting and clamping will be under the contractor’s scope. 7. fabrication, painting and fixing of pipe support will be in contractor scope. supply of red oxide and paints will be in contractor scope. (1 coat red oxide, 2 coat paints) 8. providing and fixing of chemical or mechanical hilti bolts for supports as per requirement. 9. welding of pipe joints, fittings must be done according to technical specification (ts) only. 10. threading of pipes for fitment of threaded fittings and valves wherever required will be in vendors scope. 11. all the piping shall arrange in non superposed levels, with a spacing between them and with a sufficient gap towards the bulkhead, so as to dismantle them with usual tools and particularly when the tube joining shall be made with removable fittings. 12. all the piping shall be laid without any erection difficulty. a draining shall be set at each end. an airing shall be foreseen at each high point. 13. simultaneous and sequential erection of pipeline at each level must be done along with scaffolding with all safety requirements of work at height including lifelines, safety nets and proper handrails, staircase and ladders must be provided. 14. laying of pipeline over the supports at position and fit up of joints, field welding as per specification/ ts and fixing of clamps. 15. welding of pipeline <(>&<)> joints to be done with suitable welding electrode in all pipe lines. welding electrode shall be procure as per am/ns approved make list. 16. all required consumables like gas cutting cylinders (oxygen <(>&<)> da), welding rods of all types, argon cylinder, welding rod for argon, grinding wheels, cutting wheels, die penetration kit for welding testing, wire rope slings / web slings of appropriate sizes, spanners all types <(>&<)> sizes of etc. 17. all tools and tackles for lifting /shifting/erection will be in contractor’s scope. 18. all machines and tools for erection like pipe bending machines, arc welding machines, tig/argon welding machines, gas cutting sets, grinding <(>&<)> cutting machines, hydraulic jacks <(>&<)> pumps, flushing unit, pressure testing pumps etc. 19. charging of accumulators to be done as per ts. supply of filled nitrogen gas cylinder, n2 charging kit <(>&<)> all accessories will be in scope of contractor. 20. clamping of pipe lines as per drawing / ts. 21. co ordinate with am/ns for the planning of sequential and quality work execution in accordance with the best engineering practice. 22. preparing <(>&<)> taking handing over protocols with page 24 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details civil/structural dept. 23. preparation of the protocol of the erection <(>&<)> submit the same to concerned authority of equipment supplier <(>&<)> am/ns for their review. 24. protocol of final alignment reading to be signed by representatives of erection team, equipment supplier <(>&<)> am/ns representatives. 25. manpower for assisting in cold <(>&<)> hot trail in line commissioning till handover. 26. all inspection <(>&<)> testing tools/ instruments should be of highest standard quality and having zero error. calibration report to be submitted to am/ns. 27. preparation of proper scaffolding platforms for height works including railings, toe guards. scaff holding material (cup lock type) and certified scaffolding inspector. 28. ensuring enough quantity of scaffolding material to execute erection activities through the length of line. 29. all height work approach to be done only with man lifter. wherever man lifter approach is not possible, contractor has to prepare scaffolding platforms for pipeline erection. 30. final paint touch up need to be done as required and paint and painting equipment will be in scope of contractor. 31. farhana/crane if required for erection will be provided by amns but erection and handling of pipes and fittings to be done manually by contractor. 32. resources deployment plan to be submit as per requirement of project. 33. working hour for contactor’s manpower will 24 x 7, or as per requirement of site condition. 34. pre filling of oil in hydraulic power pack will be scope of contractor 35. dp test – all socket weld joints must be dp tested by contractor 36. any crimping job for instrumentation line or grease line will be in vendor scope. 37. no o ring or gaskets should not be damaged during installation of pipe end fitting. 38. hydraulic power unit and required filters till nas value stabilization 39. all pipe fittings , hoses and accessories unloading and record keeping at storage area will be in contractor scope . 40. crimping tool for crimping of pneumatic piping 41. all flange and clamping bolts tightening with torque wrench 42. any extra tapping points required considering site conditions c) hydro testing 1. hydro testing of all the erected lines has to be performed by vendor/contractor. 2. final pressure testing will be 1.5 times of designed pressure. 3. pump and all accessories for pressure testing will be in contractors scope. 4. looping of the pipeline for testing will be scope of contractor. temporary material required for looping like hoses, valves, pipe fittings, fasteners etc will be in contactor’s scope. 5. system components which may present a restriction to flow or which may be damaged by pressure testing and high flushing flow should be by passed with suitable make up pieces. 6. after hydro testing pipe lines must be flushed and dried by compressed air. 7. itp (inspection and test plan) shall be submitted for approval before pressure testing begins. d) flushing 1. flushing of hydraulic lines will be under contractor’s scope as per amnsi sop(s). 2. flushing of lines with looping of pipes and its accessories including hoses , powerpack, supports, headers, valve, flanges, heater, filters, page 25 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details filtration unit and etc. will be under contractors scope. all flushing unit will be in contractors scope. 3. flushing should be in every pipes as per amnsi sop. 4. oil cleaning and maintaining oil filtration with filtration machine as per sop. providing <(>&<)> replacement of filter cartridge will be in contractors’ scope till the required nas level is achieved. 5. nas kit/machine will be in contractor scope. (the nas value should be less than or equal to 4 strictly) 6. system components which may present a restriction to flow or which may be damaged by high flushing flow should be by passed with suitable make up pieces. 7. flushing oil will be provided by amns. e) rt testing 1. a minimum of 10 % radiography testing (random) will be under contractor’s scope. 2. all compliance related to safety has to be complied with 100% without fail. 3. vendor shall deploy radiography camera with sufficient curie strength. 4. your rso/site in charge shall collect the details of welding joints offered for radiography in the evening from amns quality in charge. 5. vendor shall submit the previous day/night generated film/ report to amns by the next day. 6. helper’s will be in vendor’s scope. 7. lighting, scaffolding <(>&<)> platform to facilitate work. 8. d7 grade film will be used but slow processing film like d4 or d5 may be asked if situation demands. 9. if any rt film is given retake by amns quality due to any issue then that segment will not be considered. 10. against failure of joint vendor will have to perform rt for 3 more joints as penalty against failed joint. f) inspection and testing amns scope 1. qap/itp approval. 2. technical specification 3. job procedures approval 4. proposed wps and final wps approval 5. fabrication and erection methodology approval 6. pqr <(>&<)> welder qualification etc. approval for lab testing process. 7. rm <(>&<)> consumable lab testing approval. vendor’s scope 1. competent person to be engaged who should be having well knowledge in inspection of fabrication and erection of piping, welding, welder qualification, incoming material inspection etc. having well versed in asme b31.3, secix, secii, secv etc as per approved itp and piping ts. 2. initial approval of engaged manpower from amns concern person is required by sharing resume and subsequent interview. inspection during fabrication 1. conducting wps/pqr, welder performance qualification test after receiving request for inspection from the contractor. 2. inspection of all incoming material and signing the reports after clearing. 3. marking dimensions checking, cutting etc. 4. piping fitup/alignment, orientation, flange alignment etc. inspection to be done as per drawing and approved wps. 5. all stagewise inspection to be carried out as per approved itp. 6. witnessing root dpt and giving clearance for further subsequent pass. 7. knowledge of film interpretation is required. 8. weld visual <(>&<)> rf pad testing (if required) inspection to be done after receiving rfi from the contractor. inspection during erection 1. inspection erection and alignment of spools valves etc. for in situ joints of above ground location <(>&<)> disposition of terminal joints, elevation, slope, identification of the components <(>&<)> page 26 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details support erection. 2. checking blasting, painting, climate monitoring etc. as per ts and standard. inspection during mechanical <(>&<)> post testing completion 1. checking test pack/loop files for mechanical clearance wrt isometric drawings, p<(>&<)>id etc. and providing punch points and same to be closed post compliance. 2. lhs checking wrt ndt and quality point of view, providing punch points if any and same to be closed post compliance. 3. witnessing hydro/pneumatic testing. 4. witnessing carboard blasting, air blowing etc. and box up inspection. ensuring all components to be reinstate as per the p<(>&<)>id requirement. 5. checking all final documents and report signing as per approved itp. g) measurement criteria 1. welded joints of pipe fitting will be calculated in inch diameter. 2. pipe laying will be calculated in inch meter. no separate billing will be claimed for cold bends, will be also a part of pipe laying in inch meter. 3. one flange joint in the pipeline will be considered as per the size in inch diameter. 4. installation charges of valves, bellows, strainers in pipe fitting will be considered as 1 meter straight pipe length. 5. fabrication of pipeline mentioned in inch diameter as uom will be measured on basis of dn. 6. fabrication of special fittings such as reducers, tee branches of pipe fitting will be calculated as per welding in running inch diameter. 7. pipe and tube size less than 1 inch will be calculated as per actual running weld in inch diameter <(>&<)> actual length in inch meter. tubing will be part of piping scope. 8. any hydraulic fittings which will be fitted on pipe, will not be claimed in billing. 9. no separate bill will be claimed for pipe clamping, pressure testing <(>&<)> flushing of pipeline, it will be covered in pipe erection. h) project tentative time schedule – unit erection start time duration (max) cgal feb 24 8 months i) general points 1. contractor shall depute adequate number of skilled, semi skilled <(>&<)> un skilled labours under various categories like; fitters, riggers, fabricators, certified welders, pipe fitters, instrument tube fitters to execute the job as per the time schedule. 2. contractor shall depute adequate number of experienced engineers and supervisors to supervise <(>&<)> planning the erection activities. adequate number of safety supervisors. they must execute the job in coordination with oem <(>&<)> am/ns team. 3. a qualified <(>&<)> competent safety manager to be deployed with complete safety org chart. 4. a qualified <(>&<)> competent qa/qc engineer to be deployed to meet qa/qc standard of amns 5. contractor shall arrange all necessary statutory requirements such as pf, esic, insurance, labour license for workmen <(>&<)> staff. 6. contractor shall arrange necessary accommodation and local conveyance for workmen <(>&<)> staff. no space is available on site for accommodation. 7. contractor must follow the safety rules of am/ns. 8. opening of the wooden box/steel box of the material in contractor scope. wooden material / steel box to be cut in 1m x1m size and shifting of the same to scrap yard in contractor scope. 9. packing list received from material boxes to be submitted to amns. page 27 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details loose items to be kept properly in rack/boxes. 10. proper housekeeping of the erection area in contractor scope. 11. contractor shall provide all the personal protective items like helmet, safety shoes, safety jacket to all the team members according to the requirement and ensure 100% use of the same. 12. all erection and related work shall be carried out by the contractor according to the equipment supplier’s drawings/documents. 13. am/ns will provide the required drawings/ documents required for erection. 14. shifting of scrap to the designated scrap yard. 15. all staff, supervisors, workmen should be provided with uniform <(>&<)> boiler suit and uniform must wear while working on site. 16. any revise drawing job and modification in line as per site condition should be in contractor scope. 17. safety kit/first aid box, flashback arrestor, dial guage, conduit piping, flexible wires, electrical db with proper rating elcb/rccb will be contractor scope. 18. manpower support for acid disposal tank and housekeeping activity after execution of job at work will be in contractor scope. j) information to be provided in the technical offer – technical offer should have the following information’s – 1. confirmation of all the points mentioned in am/ns inquiry. 2. quality assurance plan. 3. manpower deployment plan. 4. equipment deployment plan. 5. list of tools <(>&<)> tackles 6. list of material handling equipment like farhana, forklift, trailers etc. 7. reference list for similar kind of jobs in cold rolling complex. e. start up commissioning <(>&<)> final acceptance (general) scope the contractor shall provide necessary equipment, tools, tackles, instruments, labor, supervision etc. for the following: a) prepare piping for trial and start up. b) start up and commissioning piping c) final acceptance. preparation of piping for trial and start up: the contractor shall provide adequate personnel as approved by the site in charge to assist the equipment supplier and operating personnel of amnsi in starting up and commissioning of piping as well as for adjustments, repairs, and rectifications of defects in erection of the piping during commissioning of the equipment. the contractor shall adjust piping as required by the equipment supplier with the approval of the site in charge (amnsi). the contractor shall be required to clean up the piping and prepare it for trial runs and operation in accordance with the equipment supplier’s instructions. the contractor shall bring to site such equipment, tools, instruments, labor etc. as it is deemed necessary to cater for the work, which shall include but not limited to the following. 1. clean up dirt, remove any protective coating applied by the manufacturer, clean ventilating openings and remove all visible foreign bodies from the equipment erected. 2. all flanges, inlet and outlet connections etc. shall be checked for tightness. 3. blow down all piping systems, install and remove strainers in piping and equipment as required. 4. any modification related to hydraulic power pack piping <(>&<)> hydraulic piping supplied by oem need to be done by contractor 5. any piping cleaning need to be done by pre fitted provided by oem( removing, cleaning <(>&<)> fitting of all pipes <(>&<)> joint) 6. replacement of oil fitter during trail will be in scope of contractor if at any time during trials and commissioning, till the piping is finally accepted, any part or parts either structural or belonging to page 28 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details the required to be opened for inspection and checking by the equipment supplier/site in charge (amnsi), this shall be done by the contractor and the parts should be properly refitted and satisfactorily tried after refitting. if it is established that the defects are due to bad workmanship during installation and/or materials, which are within the scope of the contractor’s supply, the charges for all rectification work inclusive of labour, materials and supervision used will be borne by the contractor. until the piping are finally accepted by m/s amnsi and taken over after the successful commissioning, the contractor shall be responsible for any loss/ damage theft etc. for the piping erected by him. k) primary hse requirementinitial documents required to start work: 1. hse plan (approved by your project manager) 2. sop (standard operating procedure) of activities approved by project manager / hse manager. 3. hira (hazard identification and risk assessment) of activities. 4. tool and tackles third party inspection certificates. 5. dedicated safety manager should be depute at site with organogram of company. 6. communication contact details with mobile no. /email id. 7. list of vehicle/equipment/machines with tpi and other relevant legal documents. 8. list of available emergency equipment on site like fire extinguisher, first aid box, emergency torch, megaphone etc. 9. mandatory ppe’s <(>&<)> safety materials with their test certificates. 10. scaffolding team’s (scaffolders/scaffold supervisor/scaffold inspector) adequate certification <(>&<)> experience letter (note the scaffolding team will be screened by our team to verify their competency level.) some other focused requirements are as below: 1. all workers coming at site with adequate and appropriate ppe’s. 2. daily tbt must be done by site engineer in presence of safety person. 3. report all incidents and near miss and conduct mock drill every month. 4. take work permit as per amns ptw system and no work allowed without work permit. 5. a permit box must be available at site. 6. all new workers must be gone through safety induction by your safety person and safety induction card must be available with person at site. 7. proper rest sheds for workers and rain cover shed for electrical equipment. 8. in case of any lifting work, no one allowed under the suspended load. 9. in case of working at height, valid height pass required as per amns norms. 10. make designated assembly point on site and valid first aid box available on site. 11. alcohol, tobacco, and smoking is strictly prohibited on site. 12. mobile phones are not allowed while entering in plant. 13. all electrical equipment’s must have protected with proper earthing and elcb/rccb. 14. only one team allowed at same level (parallel activity) to avoid injury from trip, fall of material to anyone. 15. inform work planning with manpower availability to amns safety team before one day in case of sunday, holiday. 16. area must be barricaded during height work. 17. make one separate training/induction area for workers at site. 18. only 3 pipe type torches shall be used in gas cutting set. 19. compressed gas cylinders must have separate yard for empty/full and as per category with 6m distance from one to another type and always tied with chain in vertical straight position. 20. soap solution bottle must be put on compressed cylinder (da allowed) page 29 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details trolley, yard, and check before starting the work. 21. gas cutting set must be kept in adequate trolley only. 22. farhana/trailer operator/driver must wear reflective jacket, fa box and fire extinguisher always available in good condition. 23. loto kit required in energy isolation work. 24. daily checklist must be filled by farhana/crane/heavy equipment by operator, site engineer and amns representative before starting the work. 25. certified first aider must be available at site or trained your team member by competent agency of first aid and share firs aid certificate with amns safety team. 26. safety motivational program must be done in every month for workers. 27. height register must be maintained at site during work. 28. during working hours one vehicle must be available at site for emergency case. 29. all formats of training, safety committee meeting, mock drill will be of amns. 30. every week and month proper submission of training records and reports. 31. every thursday you must submit weekly safety observation sheet and on wednesday submit good practices/ safety initiative/improvement in site. 32. at height, standard tool lanyard and standard tool bag must be ensured for safe handling <(>&<)> avoid falling of material/tool from height. 33. all rotating parts must be covered by safety guards. 34. walkie talkie required is mandatory for communication during working at height. 35. body earthing must be available in porta cabin, welding machines and other electrical equipment. 36. follow age of equipment policy and colour coding of tools and tackles as per amns standard and guidelines in amns checklist and submit. 37. don’t store any diesel or fuel in stores at site. 38. every hot work site required individual fire extinguisher and one fire point (fire buckets, fire extinguishers c02 ,dpc) must be available at site. 39. make designated assembly point with display at site. 40. no chain allowed for lifting. only web sling or wire rope sling is applicable for lifting. 41. submit tbra before night work started and inform to amns safety team. (if plan) 42. only frp helmets allowed at site. 43. each worker shall be provided with cover all/boiler suit. 44. identification numbers on each tools and tackles are compulsory on site. 45. every 50 manpower needs 1 safety officer present at site with megaphone. 46. only industrial type ladder with flat rungs is allowed in site. 47. wheel stopper required in each vehicle. 48. proper earthing pit (as per amns electrical department) with testing details displayed on site. 49. no smoking board displayed at required location. 50. availability of sufficient fire blankets/tarpaulin with mtc. 51. hose and cable for gas cutting work should be of esab brand. 52. site layout must be displayed at project site <(>&<)> electrical cable laying diagram must be displayed on each db. 53. adequate number of emergency rescue kit should be available at site with trained rescuers. 54. transportation means for workmen must be bus or any closed vehicle only. unsafe transportation is prohibited. 55. retro reflective strips shall be pasted on each vehicle/equipment body. 56. safety officer, electrician and site engineer must be available at site during working hours in day/night. 57. safety officer’s final interview will be taken by amns hse representative and safety officer must have relevant work experience and page 30 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details qualifications. please find the below mandatory requirements which shall be ensured before proceeding for height work test: 1. the minimum age of joining of personnel for working at height is minimum 20 years and maximum 45 years. 2. the minimum qualifications of personnel are that he should be a literate (at least he can read the local or national language). 3. the minimum work experience of the personnel is 2 years. 4. he should be medically fit (the person should be free from acrophobia, vertigo, and fits. he should be having normal bp, sugar <(>&<)> ecg report ) and should possess a valid medical fitness certificate for work at height jobs from care hospital at arcelormittal nippon steel india, hazira complex(cnh) before undergoing safety induction training <(>&<)> competency assessment for work at height. all the height workers’ medical fitness certificate along with reports shall be submitted to us. after successfully completion of competency assessment, a copy of their induction card <(>&<)> height pass shall also be submitted without any delay. note: the above mentioned guidelines along with other hse requirements shall be adhered or else adequate action will be taken as per amns guideline (safety code for contractors, hse contractual penalty guideline – amnsil/ps/hcpg <(>&<)> consequence management – amns/safe/57/sop) contractor supposed to be carry out activity within sops <(>&<)> reference documents provided by am/ns, as per annexure attached below. details documents will be shared with contractor during detailed technical discussion. sr. no sop document reference no. 1 safety signage <(>&<)> display of safety information amns/project/ts/hsem/18 2 night work safety amns/project/ts/hsem/05 3 lone work safety amns/project/ts/hsem/06 4 working near oh lines amns/project/ts/hsem/08 5 waste management amns/project/ts/hsem/11 6 unloading of container amns/project/ts/hsem/12 7 ppes management amns/project/ts/hsem/13 8 plant <(>&<)> machinery operation amns/project/ts/hsem/08 9 handling <(>&<)> storage of compressed gas cylinder amns/project/ts/hsem/06 10 working in confined space amns/project/ts/hsem/14 11 hot work amns/project/ts/hsem/10 12 hydro test amns/project/ts/hsem/06 13 work at height amns/project/ts/hsem/04 14 blasting <(>&<)> painting safety amns/project/ts/hsem/19 15 simultaneous operation amns/project/ts/hsem/17 16 management of hazardous substances amns/project/ts/hsem/15 17 structural steel fabrication <(>&<)> erection amns/project/ts/hsem/11 18 manual material handling amns/project/ts/hsem/05 19 hand tools <(>&<)> portable power tool safety amns/project/ts/hsem/07 20 age of equipment guidelines amns/safe/71 21 loto amns/project/ts/hsem/20 l) amns scope – 1. drawings, qap approved document, delivery schedule will be provided by amns 2. providing essentials like power and water at work site on single point only. 3. lifting and handling equipment’s / eot/ man lifter will be in amns scope. 4. supply of hydraulic oil <(>&<)> flushing oil. 5. raw pipe , elbow, union, tee, reducer, coupling, adaptor, valves, cap, flange, hoses, angles channels etc. 6. raw material for pipe supports. page 31 of 32 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109306 date 01.04.2024 submission date 12.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. animesh mishra contact email animesh.mishra@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 7. supply of n2 8. electricity will be provided at single point near entry <(>&<)> exit area of shed. m) tentative required manpower <(>&<)> resources plan: (note : manpower <(>&<)> resources plan is purely indicative and will have to be increased as per front availability and project schedule requirement) required manpower category number project manager 1 safety manager 1 safety supervisors 2 admin 1 qa/qc engineer 1 scaffold inspector 1 site engineers 2 surveyor 1 storekeeper 1 supervisors 4 foreman 3 structure fitter 2 pipe fitter 6 welders 7 gas cutter 3 grinder/ cutter 6 riggers 15 scaffolders 12 helpers 20 electrician 1 housekeeping manpower 5 blaster <(>&<)> painter 3 farhana, trailer 2 total 100 required resources, tools <(>&<)> tackles category number farhana (15 ton) 1 gas cutter set with trolley 4 arc welding machines (600 amp) 4 tig welding machines 4 single phase welding machine 3 grinding/ cutting machines 10 toolboxes with spanner set 3 box spanner set 3 torque wrenches 2 chain blocks (1 ton, 2 ton <(>&<)> 5 ton) 2 each ff2 grinder 4 portable drilling machine 2 hilti bolt drilling machine 1 pipe bending machine 4 motorised pump for oil filling 1 extension board for electrical connection 5 manual pump for oil 2 web sling (2 ton, 5 ton, 10 ton) 5 pair each d shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each bow shackle (wll 1 ton, 5 ton, 10 ton) 2 pair each welding cable (600 amp) of 100 m <(>&<)> earthing cable 100 m of length for each welding machine 1 lot electrical power panels, industrial extension boards with 100 m cables, db’s, jb’s, single core/ 3 core armoured cables etc as per requirement. 1 lot hydro testing pump with accessories 1 air compressor for pressure testing and flushing 1 oil flushing unit with accessories 2 set temporary hoses, valves, and fittings 1 lot...

Ministry Of Defence - Gujarat

42072763 bids are invited for hiring of boats hiring of trawler boat at ins dwarka; less than 7 years; without air conditioning; 12 persons; 500; sterndrive; wood; foot pump, rescue life jackets, repair kit, lifebuoys, 12 volt heavy duty battery, fire extinguisher, fire blanket.. total quantity :...

Ministry Of Defence - Gujarat

41460970 bids are invited for hiring of boats hiring of trawler boat at ins dwarka; less than 7 years; without air conditioning; 12 persons; 500; sterndrive; wood; foot pump, rescue life jackets, repair kit, lifebuoys, 12 volt heavy duty battery, fire extinguisher, fire blanket... total quantity :...

Indian Army - Gujarat

41431200 bids are invited for bettery , camonet , big torche , sand cloth , fire blanket , traffic light total quantity : 708...

Indian Army - Gujarat

41185322 bids are invited for rechargable torch rechargable torch , tactical gloves , siren horn , venus mask , caution tape 50mmx200m , fire blanket , search light , telescopic ladder 6.5 mtr , fire extinguisher ball , radium tape 2 inch , fire extinguisher 500ml , carabiner , tactical protective kneepad and elbow , ambulance rotating light , goggles total quantity : 69...

Indian Army - Gujarat

41016613 bids are invited for rechargable torch , tactical gloves , siren horn , venus mask , caution tape 50mmx200m , fire blanket , search light , telescopic ladder 6.5 mtr , fire extinguisher ball , radium tape 2 inch , fire extinguisher 500ml , carabiner , mountcraft military tactical protective kneepad and elbo , ambulance rotating light , goggles total quantity : 85...

Ongc Petro Additions Limited - Gujarat

37558032 tender for the procurement of different types of consumables at opal, dahej 1 0t2653120007 plastic pouch,20x20cm,zip lock pouch;size:20 x 20 cm; withzip lock;white strip to write;mat:plastic;1 pack:100 nos 2 ea 2 0t2515100078 glnd pckg,gph,3x3mm,98.3%c,w/1to2%zn gland packing; dimensions:3 x 3 mm; material:expanded natural mineral flexiblepure graphite, non metallic foil fibres; carbon purity:98.3 %; with zinc ascorrosion inhibitor; zinc content:1.2 % 3 kg 3 0t2543980026 gskt,flr,cl150,af159,20mm,2mm flat ring gaskets; design spec:asme b16.21; pressure designation:cl150; thickness:2 mm; mat, spec:af 159; size, pipe, nominal:20mm; manufacturer part number:11180a ms 4/cs 13; equipment model number:4k165 1c_1, 4d300b 3w_1; equipment name:water cooler;equipment make:enpro industries; drawing number:11180a 01 10/18/19; main equipment manufacturer:burckhardt compression 3 ea 4 0t2548690029 sheet,gskt,0.5mm,non asb,style 59 gasket sheet; style:59; material:non asbestos; dimension:lg 1500 x wd 1600 x thk0.5 mm; style name:champion/spitmaan; suitable for high temperature services ingases, oils and hydrocarbons (asbestos fibre free) 3 ea 5 0t3864300002 graphite putty,1kg compounds; packaging unit:1 kg (per pack); description:graphite putty 5 ea 6 0t2515100079 glnd pckg,gph,4x4mm,98.3%c,w/1to2%zn gland packing; dimensions:4 x 4 mm; material:expanded natural mineral flexiblepure graphite, non metallic foil fibres; carbon purity:98.3 %; with zinc ascorrosion inhibitor; zinc content:1.2 % 5 kg 7 0t3643950019 grease,anti seize for thread compound greases; type:anti seize; application:lubricant/greasing,colour:copper coloured; manufacturer part number: omega99 or oks 240 or protec(mf)ormosil as352,form of supply:1kg;flash point:213 °c; relativedensity:1.31; odour:slight odour (sweetish); appearance:grease / paste 6 kg 8 0p2203370001 elctrd,weld,2.5mm,xuper 680 cgs low alloy welding electrodes; diameter:2.5 mm; manufacturer part number:xuper 680 cgs 6 kg 0p2203370002 elctrd,weld,3.15mm,xuper 680 cgs low alloy welding electrodes; diameter:3.15 mm; manufacturer part number:xuper 680 cgs 6 kg 10 0t2515100080 glnd pckg,gph,5x5mm,98.3%c,w/1to2%zn gland packing; dimensions:5 x 5 mm; material:expanded natural mineral flexiblepure graphite, non metallic foil fibres; carbon purity:98.3 %; with zinc ascorrosion inhibitor; zinc content:1.2 % 6 kg 11 0t2515100087 glnd pckg,ptfe,10x10mm gland packing; cross section:10 x 10 mm; material:ptfe; with aramide fibre 6 ea 12 0t2515100090 glnd pckg,gph,6x6mm,crane.j gland packing; type:full wire braided graphite rope; material:graphite;dimension:6 x 6 mm; manufacturer:john crane 6 m 13 0t2515100092 glnd pckg,gph,4x4mm,crane.j gland packing; type:full wire braided graphite rope; material:graphite;dimension:4 x 4 mm; manufacturer:john crane 6 m 14 0t2515780026 glnd pckg,ptfe,6x6mm,crane.j gland packing; type:full wire braided ptfe rope; material:ptfe; dimension:6 x 6mm; manufacturer:john crane 6 m 15 0t2515780027 glnd pckg,ptfe,5x5mm,crane.j gland packing; type:full wire braided ptfe rope; material:ptfe; dimension:5 x 5mm; manufacturer:john crane 6 m 16 0t2515780028 glnd pckg,ptfe,4x4mm,crane.j gland packing; type:full wire braided ptfe rope; material:ptfe; dimension:4 x 4mm; manufacturer:john crane 6 m 17 0t2515780029 glnd pckg,ptfe,3x3mm,crane.j gland packing; type:full wire braided ptfe rope; material:ptfe; dimension:3 x 3mm; manufacturer:john crane 6 m 18 0t2548690034 sheet,gskt,1mm,non abs,style 54 gasket sheet; style:54; material:non asbestos; dimension:lg 1500 x wd 1600 x thk1 mm; style name:champion/spitmaan; suitable for high temperature services ingases, oils and hydrocarbons (asbestos fibre free) 6 ea 19 0t2548690035 sheet,gskt,3mm,non abs,style 54 gasket sheet; style:54; material:non asbestos; dimension:lg 1500 x wd 1600 x thk3 mm; style name:champion/spitmaan; suitable for high temperature services ingases, oils and hydrocarbons (asbestos fibre free) 6 ea 20 0t3015150005 rpe,fibre,8mm,1050to1260°c,ceramic fibre ropes; diameter:8 mm; mat:ceramic; style:7000 non metalic;type:braided resiliant packing rope; temperature range:1050 °c to 1260 °c; yarn braided rope with non metallic reinforcement; reinforcementstainless steel wire 6 kg 21 0t2548690031 sheet,gskt,2mm,non abs,style 59 gasket sheet; style:59; material:non asbestos; dimension:lg 1500 x wd 1600 x thk2 mm; style name:champion/spitmaan; suitable for high temperature services ingases, oils and hydrocarbons (asbestos fibre free) 7 ea 22 0t2548690036 sheet,gskt,5mm,non abs,style 54 gasket sheet; style:54; material:non asbestos; dimension:lg 1500 x wd 1600 x thk5 mm; style name:champion/spitmaan; suitable for high temperature services ingases, oils and hydrocarbons (asbestos fibre free) 8 ea 23 0t2556150006 o ring kit,viton,mm,3to50mm spare parts; part name:o ring kit; dimensions:3 to 50 mm (id); material:viton; form of supply:box; size in mm 10 st 24 0t2515100088 glnd pckg,ptfe,8x8mm gland packing; cross section:8 x 8 mm; material:ptfe; with aramide fibre 11 kg 25 0t2556150004 o ring kit,nbr,inch,3to50mm spare parts; part name:o ring kit; dimensions:3 to 50 mm (id); material:neoprene; form of supply:box; size in inch 11 st 26 0t2548690030 sheet,gskt.1mm,non asb,style 59 gasket sheet; style:59; material:non asbestos; dimension:lg 1500 x wd 1600 x thk1 mm; style name:champion/spitmaan; suitable for high temperature services ingases, oils and hydrocarbons (asbestos fibre free) 13 ea 27 0t2556150005 o ring kit,viton,inch,12to55mm spare parts; part name:o ring kit; dimensions:12 to 55 mm (id); material:viton; form of supply:box; size in inch 13 st 28 0t2548690033 sheet,gskt,5mm,non abs,style 59 gasket sheet; style:59; material:non asbestos; dimension:lg 1500 x wd 1600 x thk5 mm; style name:champion/spitmaan; suitable for high temperature services ingases, oils and hydrocarbons (asbestos fibre free) 14 ea 29 0t2548690014 sheet,gskt,3mm,non asb,af 159,met gasket sheet; type:metallic; style:af 159; material:non asbestos; dimension:lg 1500 x w 1600 x thk 3 mm; style name:champion /spitmaan; approximate weight per sheet:20.00 kg; suitable for high temp services in gases, oils and hydrocarbons (asbestos fibrefree) 15 ea 30 0t2556150003 o ring kit,nbr,mm,3to50mm spare parts; part name:o ring kit; dimensions:3 to 50 mm (id); material:neoprene; form of supply:box; size in mm 15 st 31 0t2515100089 glnd pckg,gph,8x8mm,crane.j gland packing; type:full wire braided graphite rope; material:graphite;dimension:8 x 8 mm; manufacturer:john crane 17 m 32 0t2515100083 glnd pckg,gph,10x10mm,98.3%c,w/1to2%zn gland packing; dimensions:10 x 10 mm; material:expanded natural mineral flexiblepure graphite, non metallic foil fibres; carbon purity:98.3 %; with zinc ascorrosion inhibitor; zinc content:1.2 % 19 kg 33 0t2515100082 glnd pckg,gph,8x8mm,98.3%c,w/1to2%zn gland packing; dimensions:8 x 8 mm; material:expanded natural mineral flexiblepure graphite, non metallic foil fibres; carbon purity:98.3 %; with zinc ascorrosion inhibitor; zinc content:1.2 % 20 kg 34 0t2515100081 glnd pckg,gph,6x6mm,98.3%c,w/1to2%zn gland packing; dimensions:6 x 6 mm; material:expanded natural mineral flexiblepure graphite, non metallic foil fibres; carbon purity:98.3 %; with zinc ascorrosion inhibitor; zinc content:1.2 % 21 kg 35 0t2548690032 sheet,gskt,3mm,non abs,style 59 gasket sheet; style:59; material:non asbestos; dimension:lg 1500 x wd 1600 x thk3 mm; style name:champion/spitmaan; suitable for high temperature services ingases, oils and hydrocarbons (asbestos fibre free) 21 ea 36 0t0103220024 adh,gskt,f/exchanger,ss316,0.6mm glues and adhesives; gasket adhesive for plate and frame exchanger; mat,plate:stainless steel 316; thickness:0.6 mm; mat, gasket:viton 22 l 37 0t2556150001 o ring kit,neoprene,1/32 3/8in,1m cord, o ring; length:1 m; size:1/32, 1/16, 1/8/1/4, 3/8 in; manufacturer:loctite or equivalent 22 pac 38 0t0105200015 lapping paste,coarse,400g/tube compounds; application:sealing; packaging unit:400 g/tube; description:lapping paste; grade:coarse 24 ea 39 0t2548690016 sheet,gskt,3mm,non asb,af 154,met gasket sheet; type:metallic; style:af 154; material:non asbestos; dimension:lg 1600 x w 1500 x thk 3 mm; style name:champion /spitmaan; approximate weight per sheet:20.00 kg; mandatory requirement:gauze reinforcement and antisticking coating; suitable forhigh temp services in gases, oils and hydrocarbons (asbestos fibre free) 24 ea 40 0t0105200014 lapping paste,medium,400g/tube compounds; application:sealing; packaging unit:400 g/tube; description:lapping paste; grade:medium 25 ea 41 0t2556150002 o ring kit,neoprene,1 7mm,1m cord, o ring; length:1 m; size:1, 2, 3, 4, 5, 6, 7 mm; manufacturer:loctite or equivalent 15 pac 42 0t0105200013 lapping paste,fine,400g/tube compounds; application:sealing; packaging unit:400 g/tube; description:lapping paste; grade:fine 29 ea 43 0t2515100086 glnd pckg,gph,16x16mm,98.3%c,w/1to2%zn gland packing; dimensions:16 x 16 mm; material:expanded natural mineral flexiblepure graphite, non metallic foil fibres; carbon purity:98.3 %; with zinc ascorrosion inhibitor; zinc content:1.2 % 15 kg ________________________ (sign & stamp of bidder) tender no. 2340c00251 page 55 of 98 sl no material code item detailed item description tentative qty for 02 years uom hsn code 44 0t2515780005 pckg,glnd,ptfe,10mm ptfe packing; mat:ptfe; construction:double braided; dimension, cross section:10 mm 39 kg 45 0p2515100002 glnd pckg,non asb,gph,12x12mm,20bar reinforced square cross section packing; mat:non asbestos; mat, reinforcement:graphite (braided); dimension, cross section w x h:12x 12 mm; type:gland packing; pressure:20 bar (max); temperature:50 °c (max); synthetic yarn impregnated with special petroleumbased lubricant and graphite, service raw water and cooling water; flexible gland packing to ensure excellent seal against worn andscored shaft 20 kg 46 0t2515780022 sheet,ptfe,600x1000mm,3mm ptfe packing; mat:ptfe; construction:sheet; dimension, cross section:600 x 1000 mm; thickness:3 mm 30 m2 47 0t2515100085 glnd pckg,gph,14x14mm,98.3%c,w/1to2%zn gland packing; dimensions:14 x 14 mm; material:expanded natural mineral flexiblepure graphite, non metallic foil fibres; carbon purity:98.3 %; with zinc ascorrosion inhibitor; zinc content:1.2 % 20 kg 48 0t2548690015 sheet,gskt,1.5mm,non asb,af 154,met gasket sheet; type:metallic; style:af 154; material:non asbestos; dimension:lg 1500 x w 1600 x thk 1.5 mm; style name:champion /spitmaan; approximate weight per sheet:12.00 kg; suitable for hot oils and hydrocarbons (asbestos fibre free) 48 ea 49 0t2515780021 sheet,ptfe,600x1000mm,2mm ptfe packing; mat:ptfe; construction:sheet; dimension, cross section:600 x 1000 mm; thickness:2 mm 40 m2 50 0p2562010005 blanket,ceramic,50.8mm,1300°c,128kg/m3 ceramic blanket; material,construction:ceramic fiber; dimensions (l x b x h):3660 x 610 x 50.8 mm; temperature:1300 °c; density:128kg/m3 30 ea 51 0t2515780004 pckg,glnd,ptfe,8mm ptfe packing; mat:ptfe; construction:double braided; dimension, cross section:8 mm 35 kg 52 0t2512200001 tape,packaging,brown,3in,50m warehouse consumables; type:packaging tape; color:brown; size:3 in; length:50 m 65 ea 53 0t2548690017 sheet,gskt,1.5mm,non asb,af 120,non met gasket sheet; type:non metallic; style:af 120; material:non asbestos; dimension:lg 1500 x w 1600 x thk 1.5 mm; style name:champion/ spitmaan; approximate weight per sheet:10.00 kg; item specifications:a high quality sheet based on blend of special heatresistance; mandatory requirement:aramid fibres bonded with elastomer; suitable for light industrial applications in water, gasesand oils (asbestos fibre free) 66 ea 54 0t0116100017 cloth,emery,50mm,50m/roll,medium abrasives; type:emery cloth; size:50 mm; grade:medium; form of supply:roll of 50 m; reference manufacturer:norton / carborandum /phonix 70 ea 55 0t0117150001 stone,emery,silicon carbide abrasives; type:emery stone; material:silicon carbide 40 ea 56 0t2515780017 sheet,ptfe,1 mm,600x1000 mm, ptfe packing; mat:ptfe; dimension, cross section:600 x 1000 mm, 50 m2 57 0t0116100016 cloth,emery,50mm,50m/roll,coarse abrasives; type:emery cloth; size:50 mm; grade:coarse; form of supply:roll of 50 m; reference manufacturer:norton / carborandum /phonix 79 ea 58 0t0116100019 cloth,emery,50mm,50m/roll,extra fine abrasives; type:emery cloth; size:50 mm; grade:extra fine; form of supply:roll of 50 m; reference manufacturer:norton / carborandum/ phonix 82 ea 59 0t0102040001 m seal/beck seal,1kg,f/general purpose compounds; application:general purpose epoxy; packaging unit:1 kg (pack); description:m seal/beck seal 50 ea 60 0t3528030043 plank,wooden,200x200mm,10ft office consumables; type:plank; material:wooden; dimension:200 mm x 200 mm x 10ft 50 ea 61 0t2515100084 glnd pckg,gph,12x12mm,98.3%c,w/1to2%zn gland packing; dimensions:12 x 12 mm; material:expanded natural mineral flexiblepure graphite, non metallic foil fibres; carbon purity:98.3 %; with zinc ascorrosion inhibitor; zinc content:1.2 % 40 kg 62 0t3515640003 tape,teflon,3/4in,12m office consumables; type:teflon tape; size:3/4 in; length:12 m 110 ea 63 0t0116100018 cloth,emery,50mm,50m/roll,fine abrasives; type:emery cloth; size:50 mm; grade:fine; form of supply:roll of 50 m; reference manufacturer:norton / carborandum /phonix 100 ea 64 0t0734410001 silicone grease_polymer greases; brand name:silicone grease_polymer; boiling point:171 to 191 °c; flash point:> 49 °c; auto ignition temperature:365 °c;density: 759 kg/m³; viscosity:1.39 cst at 40 °c 116 kg 65 0t2548690018 sheet,gskt,3mm,non asb,af 120,non met gasket sheet; type:non metallic; style:af 120; material:non asbestos; dimension:lg 1500 x w 1600 x thk 3 mm; style name:champion /spitmaan; approximate weight per sheet:16.00 kg; service conditions:1) max operating pressure:50 bar, 2) max short servicetemperature:400 °c, 3) max continuous service temperature:250 °c, 4) max operting temperature for steam:200 °c; suitable forapplications in water, gases and oils (asbestos fibre free) 50 ea 66 0t2512120001 sheet,jointing,neoprene rubber,2mm rubber packing; mat:neoprene rubber 100%; dimension, cross section:2 mm 150 m2 67 0t3528030042 plank,wooden,150x150mm,10ft office consumables; type:plank; material:wooden; dimension:150 mm x 150 mm x 10ft 80 ea 68 0t3528030044 plank,wooden,100x100mm,10ft office consumables; type:plank; material:wooden; dimension:100 mm x 100 mm x 10ft 70 ea 69 0t2515100010 tape,grfoil,3/4inx10mx0.4mm,w/adhesive tape; material:grafoil; dimension:3/4 in x 10 m x 0.4 mm; with adhesive 328 ea 70 0t2515100008 tape,grfoil,1/2inx10mx0.4mm,w/adhesive tape; material:grafoil; dimension:1/2 in x 10 m x 0.4 mm; with adhesive 329 ea 71 0t0116100028 paper,emery,9x11in,1200gr abrasives; type:emery paper; size:9 x 11 in; grade:1200; material:silicon carbide; water proof; reference manufacturer:norton /carborandum / jk 383 ea 72 0t3515640002 tape,teflon,1/2in,12m office consumables; type:teflon tape; size:1/2 in; length:12 m;manufacturer:champion/spitman or equivalent 418 ea 73 0t3529160002 al plt tags,3x1in,rect,brush finished tag set; type:aluminum plate tags; material:aluminum; size:3 x 1 in; aluminumplates with brush finished; rectangle metal tags with rounded ends have 2 holesper tag 439 ea 74 0t2512120002 sheet,jointing,neoprene rubber,3mm rubber packing; mat:neoprene rubber 100%; dimension, cross section:3 mm 100 m2 75 0t0116350004 paper,emery,11x9in,100gr abrasives; type:emery paper; size:11 x 9 in; grade:100 512 ea 76 0t0116350003 paper,emery,11x9in,80gr abrasives; type:emery paper; size:11 x 9 in; grade:80 522 ea 77 0t0116350008 paper,emery,11x9in,220gr abrasives; type:emery paper; size:11 x 9 in; grade:220 535 ea 78 0t0116350006 paper,emery,11x9in,150gr abrasives; type:emery paper; size:11 x 9 in; grade:150 583 ea 79 0t0105200003 sealant,rtv silicon,300ml/pack compounds; application:sealant; packaging unit:pack of 300 ml; alternativename:rtv silicon sealant; manufacturer:dow corning732/ge2000 or equivalent;temperature range: 65 to +232 °c 638 ea 80 0t0116100021 cloth,emery,9x11in/sheet,medium abrasives; type:emery cloth; size:9 x 11 in; grade:medium; form of supply:sheet; reference manufacturer:norton / carborandum /phonix 651 ea 81 0t5501230074 wire,99.9% lead,3mm electrical wires; application:clearance measurement; mat, conductor:99.9 % lead; size:3 mm 660 g 82 0t1586480001 tape,masking,1inx55m tape; type:masking; width:1 in; length:55 m; manufacturer:3m 500 ea 83 0t0116100029 marking cloth,high density,1m marking cloth; high density; wide:1 m 500 m ________________________ (sign & stamp of bidder) tender no. 2340c00251 page 58 of 98 sl no material code item detailed item description tentative qty for 02 years uom hsn code 84 0t0116100020 cloth,emery,9x11in/sheet,coarse abrasives; type:emery cloth; size:9 x 11 in; grade:coarse; form of supply:sheet; reference manufacturer:norton / carborandum /phonix 686 ea 85 0t0116100027 paper,emery,9x11in,1000gr abrasives; type:emery paper; size:9 x 11 in; grade:1000; material:silicon carbide; water proof; reference manufacturer:norton /carborandum / jk 708 ea 86 0t0116100023 cloth,emery,9x11in/sheet,extra fine abrasives; type:emery cloth; size:9 x 11 in; grade:extra fine; form of supply:sheet; reference manufacturer:norton / carborandum /phonix 730 ea 87 0t2515780015 pckg,tape,ptfe,1/2inx0.075mmx12m ptfe packing; mat:ptfe; dimension, cross section:1/2 in x thk 0.075 mm; length:12 m; champion/spitmann 791 ea 88 0t0116100026 paper,emery,9x11in,600gr abrasives; type:emery paper; size:9 x 11 in; grade:600; material:silicon carbide; water proof; reference manufacturer:norton /carborandum / jk 796 ea 89 0t2515780016 pckg,tape,ptfe,1inx0.075mmx12m ptfe packing; mat:ptfe; dimension, cross section:1 in x thk 0.075 mm; length:12 m; champion/spitmann 929 ea 90 0t0116100022 cloth,emery,9x11in/sheet,fine abrasives; type:emery cloth; size:9 x 11 in; grade:fine; form of supply:sheet; reference manufacturer:norton / carborandum / phonix 1041 ea 91 0t0116100025 paper,emery,9x11in,400gr abrasives; type:emery paper; size:9 x 11 in; grade:400; material:silicon carbide; water proof; reference manufacturer:norton /carborandum / jk 1051 ea 92 0t0116100024 paper,emery,9x11in,320gr abrasives; type:emery paper; size:9 x 11 in; grade:320; material:silicon carbide; water proof; reference manufacturer:norton /carborandum / jk 1072 ea 93 0t0102520002 scotch brite,6in,coarse household and club goods; type:scotch brite; size:6 in; material grade:coarse 1500 ea 94 0t3517160003 cotton waste,jute office consumables; type:cotton waste; type, cotton waste:jute 3623 kg 95 0t5501230071 wire,99.9% lead,0.5mm,loose electrical wires; application:clearance measurement; mat, conductor:99.9 % lead; form of supply:loose pack; size:0.5 mm 3044 g 96 0t5501230072 wire,99.9% lead,1mm electrical wires; application:clearance measurement; mat, conductor:99.9 % lead; size:1 mm 3362 g 97 0t5501230073 wire,99.9% lead,2mm electrical wires; application:clearance measurement; mat, conductor:99.9 % lead; size:2 mm 3362 g 98 0t4801030001 cloth,cotton cloth; material:cotton 1560 kg ________________________ (sign & stamp of bidder) tender no. 2340c00251 page 59 of 98 sl no material code item detailed item description tentative qty for 02 years uom hsn code 99 0p2515100001 glnd pckg,non asb,gph,10x10mm,20bar reinforced square cross section packing; mat:non asbestos; mat, reinforcement:graphite (braided); dimension, cross section w x h:10x 10 mm; type:gland packing; pressure:20 bar (max); temperature:50 °c (max); synthetic yarn impregnated with special petroleumbased lubricant and graphite, service raw water and cooling water; flexible gland packing to ensure excellent seal against worn andscored shaft 1 kg 100 0p2515100003 glnd pckg,non asb,gph,14x14mm,20bar reinforced square cross section packing; mat:non asbestos; mat, reinforcement:graphite (braided); dimension, cross section w x h:14x 14 mm; type:gland packing; pressure:20 bar (max); temperature:50 °c (max); synthetic yarn impregnated with special petroleumbased lubricant and graphite, service raw water and cooling water; flexible gland packing to ensure excellent seal against worn andscored shaft 1 kg 101 0p2515100004 glnd pckg,non asb,gph,16x16mm,20bar reinforced square cross section packing; mat:non asbestos; mat, reinforcement:graphite (braided); dimension, cross section w x h:16x 16 mm; type:gland packing; pressure:20 bar (max); temperature:50 °c (max); synthetic yarn impregnated with special petroleumbased lubricant and graphite, service raw water and cooling water; flexible gland packing to ensure excellent seal against worn andscored shaft 1 kg 102 0p2515100005 glnd pckg,non asb,gph,25x25mm,20bar reinforced square cross section packing; mat:non asbestos; mat, reinforcement:graphite (braided); dimension, cross section w x h:25x 25 mm; type:gland packing; pressure:20 bar (max); temperature:50 °c (max); synthetic yarn impregnated with special petroleumbased lubricant and graphite, service raw water and cooling water; flexible gland packing to ensure excellent seal against worn andscored shaft 1 kg no material code item detailed item description tentative qty for 02 years uom hsn code 145 0t2515100077 glnd pckg,gph,12x22x5mm,600°c,300kg/cm2 gland packing; inside dia:12 mm; outside dia:22 mm; thickness:5 mm; flexible pure graphite dye mounded gland packing ring;reinforcement with stainless steel / inconnel wire in single oblique cut to withstand temperature of 650 °c and pressure of 450bar; dia, wire:0.16 mm; set consist of 2 numbers in 2 halves to withstand temperature of 600 °c and pressure of 300 kg/cm2; top andbottom bull ring are expanded pure graphite braided; carbon content:99.5 %; ash content:0.5 % (maximum); chloride content:< 50 ppm;density:1.4 to 1.8 gms/cc; for super heated and saturated steam valves 1 st 146 0t2515100091 glnd pckg,gph,5x5mm,crane.j gland packing; type:full wire braided graphite rope; material:graphite;dimension:5 x 5 mm; manufacturer:john crane 1 m 147 0t2515100093 glnd pckg,gph,3x3mm,crane.j gland packing; type:full wire braided graphite rope; material:graphite;dimension:3 x 3 mm; manufacturer:john crane 1 m 148 0t2515780024 pckg,ptfe,teflon,1x1m,0.5mm ptfe packing; mat:teflon; dimension, cross section:1 x 1 m; thickness:0.5 mm 1 ea 149 0t2515780025 glnd pckg,8x8mm,ptfe,crane.j gland packing; type:full wire braided ptfe rope; material:ptfe; dimension:8 x 8mm; manufacturer:john crane 1 m 150 0t2515780030 glnd pckg,rope,3mm,ptfe gland packing; type:rope; material:ptfe; size:3 mm 1 ea 151 0t2515780031 glnd pckg,rope,5mm,ptfe gland packing; type:rope; material:ptfe; size:5 mm 1 ea 152 0t2548690027 sheet,gskt,1500x1600x1mm,non asbestos gasket sheet; type:non metallic; style:af 120; material:non asbestos;dimension:lg 1500 x wd 1600 x thk 1 mm; style, name:champion/spitmaan;mandatory, requirement:aramid fibres bonded with elastomer; suitable for lightindustrial applications in water, gases 1 ea 153 0t2548690028 sheet,gskt,5mm,non asb,af 159,met gasket sheet; type:metallic; style:af 159; material:non asbestos; dimension:lg1500 x wd 1600 x thk 5 mm; style name:champion/spitmaan; approximate weight persheet:20.00 kg; suitable for high temperature services in gases, oils andhydrocarbons (asbestos fibre free) 1 ea ________________________ (sign & stamp of bidder) tender no. 2340c00251 page 75 of 98 sl no material code item detailed item description tentative qty for 02 years uom hsn code 154 0t3015150004 rpe,fibre,6mm,1050to1260°c,ceramic fibre ropes; diameter:6 mm; mat:ceramic fibre; style:7000 non metalic;type:braided resiliant packing rope; temperature range:1050 °c to 1260 °c; yarn braided rope with non metallic reinforcement; reinforcementstainless steel wire 1 kg 155 0t3015150006 rpe,fibre,10mm,1050to1260°c,ceramic fibre ropes; diameter:10 mm; mat:ceramic; style:7000 non metalic;type:braided resiliant packing rope; temperature range:1050 °c to 1260 °c; yarn braided rope with non metallic reinforcement; reinforcementstainless steel wire 1 kg 156 0t3015150007 rpe,fibre,12mm,1050to1260°c,ceramic fibre ropes; diameter:12 mm; mat:ceramic; style:7000 non metalic;type:braided resiliant packing rope; temperature range:1050 °c to 1260 °c; yarn braided rope with non metallic reinforcement; reinforcementstainless steel wire 1 kg 157 0t3015150008 rpe,fibre,14mm,1050to1260°c,ceramic fibre ropes; diameter:14 mm; mat:ceramic; style:7000 non metalic;type:braided resiliant packing rope; temperature range:1050 °c to 1260 °c; yarn braided rope with non metallic reinforcement; reinforcementstainless steel wire 1 kg 158 0t3015150009 rpe,fibre,16mm,1050to1260°c,ceramic fibre ropes; diameter:16 mm; mat:ceramic; style:7000 non metalic;type:braided resiliant packing rope; temperature range:1050 °c to 1260 °c; yarn braided rope with non metallic reinforcement; reinforcementstainless steel wire 1 kg 159 0t5515280046 wire,elec,lead,5mm electrical wires; mat, conductor:lead; size:5 mm 1 g 160 0t4503140002 reamer fine,6in hand tools; type, tool:reamer fine; size:6 in 4 ea 161 0t4503140003 reamer fine,12in hand tools; type, tool:reamer fine; size:12 in 4 ea 162 0t4522140005 engg files,flat fine,12in hand tools; type, tool:engineering files; type:flat fine; size:12 in 6 ea 163 0t4531110064 star allen key set,7pcs,taparia hand tools; type, tool:star allen key set; manufacturer:taparia tools limited;number of pieces:7/set (t10, t15, t20, t25, t27, t30, t40) 7 st 164 0t1575200004 circlip set,ext,stl,6 36mm external circlips; mat:steel; thickness:0.25 to 10; manufacturer:r.s.components; part name:circlip set; size:6 to 36 mm; finish, coating:hot dipgalvanized; material type:high tensile; set consists of 500 nos; finish:blackphosphate as per bs3673; additional make:equivalent 9 st ________________________ (sign & stamp of bidder) tender no. 2340c00251 page 76 of 98 sl no material code item detailed item description tentative qty for 02 years uom hsn code 165 0t1575200005 circlip set,intl,stl,5 50mm internal circlips; mat:steel; manufacturer:r.s. components; part name:circlipset; size:5 to 50 mm; finish:black phosphate as per bs3673; additionalmake:equivalent 9 st 166 0t4514030002 punch,hole,4to32mm hand tools; type, tool:hole punch; size: 4 to 32, 1/8 to 1 inch 10 st 167 0t1586230004 can,oil,calibrated,1l oil can; with handle 13 ea 168 0t4523200001 gauge,feeler,plastic,pl x small tools; description:feeler gauge; type:pl x; for bearing clearance 16 ea 169 0t4523200002 gauge,feeler,plastic,pl a small tools; description:feeler gauge; type:pl a; for bearing clearance 16 ea 170 0t4523200003 gauge,feeler,plastic,pl b small tools; description:feeler gauge; type:pl b; for bearing clearance 16 ea 171 0t1586730006 sheet,shim,ss,0.75mm shim sheet; material:stainless steel; thickness:0.75 mm 19 m2 172 0t4206010001 pump,rotary,hand,200l,3/4in pumps; type:oil transfer hand rotary pump; for 200 l barrel; size 3/4 in 21 ea 173 0t3027010016 nip,grease,brass,straight,m10x1 grease nipples; type:straight; material:brass; coating:chrome plate; size:m10 x1 25 ea 174 0t1586250001 funnel,gi,1/2in funnels; mat:galvanized iron; size, od:1/2 in 26 ea 175 0t1586730004 sheet,shim,ss,0.40mm shim sheet; material:stainless steel; thickness:0.40 mm 26 m2 176 0t4514030001 punch,center,cr va,12x125mm hand tools; type, tool:center punch; material: chrome vanadium; dimension: 12 mm dia x 125 mm, 1985 26 ea 177 0t1586230001 can,oil measuring,al,5l measures; type:oil measuring can; capacity:5 l; mat:aluminium 10 ea 178 0t1586230002 can,oil measuring,al,500ml measures; type:oil measuring can; capacity:500 ml; mat:aluminium 27 ea 179 0t1586730005 sheet,shim,ss,0.5mm shim sheet; material:stainless steel; thickness:0.5 mm 15 m2 180 0t5475210003 chain,galvanized,20x15mm,5mm chain; coating:galvanized; rod diameter:5 mm; link length:20 mm; link width:15mm; for cylinders 28 m 181 0t3027010013 nip,grease,brass,straight,3/8in grease nipples; type:straight; material:brass; coating:chrome plate; size:3/8 in(bsp) 29 ea 182 0t0115980014 wheel,buffing,ms,f/grinder,5in abrasives; type:wheel,buffing; manufacturer:any reputed; type, wheel:round;wheel should accommodate with 5 in angle grinder; material:mild steel 30 ea 183 0t3027010015 nip,grease,brass,straight,m8x1 grease nipples; type:straight; material:brass; coating:chrome plate; size:m8 x 1 30 ea 184 0t1586730007 sheet,shim,ss,1mm shim sheet; material:stainless steel; thickness:1 mm 31 m2 185 0t1586730008 sheet,shim,ss,1.5mm shim sheet; material:stainless steel; thickness:1.5 mm 33 m2 ________________________ (sign & stamp of bidder) tender no. 2340c00251 page 77 of 98 sl no material code item detailed item description tentative qty for 02 years uom hsn code 186 0t1586730009 sheet,shim,ss,2mm shim sheet; material:stainless steel; thickness:2 mm 38 m2 187 0t1586730002 sheet,shim,ss,0.13mm shim sheet; material:stainless steel; thickness:0.13 mm 39 m2 188 0t3027010011 nip,grease,brass,straight,1/8in grease nipples; type:straight; material:brass; coating:chrome plate; size:1/8 in(bsp) 40 ea 189 0t1586730003 sheet,shim,ss,0.25mm shim sheet; material:stainless steel; thickness:0.25 mm 42 m2 190 0t3027010012 nip,grease,brass,straight,1/4in grease nipples; type:straight; material:brass; coating:chrome plate; size:1/4 in(bsp) 48 ea 191 0t3027010014 nip,grease,brass,straight,m6x1 grease nipples; type:straight; material:brass; coating:chrome plate; size:m6 x 1 48 ea 192 0t1586730001 sheet,shim,ss,0.05mm shim sheet; material:stainless steel; thickness:0.05 mm 55 m2 193 0t4516380003 frame,hacksaw,w/blade,12x1/2in hand tools; type, tool:hacksaw frame; with hacksaw blade; dimension:12 x1/2 in; material:high speed steel 68 ea 194 0t0105760013 wire brush,nylon w/abrasive,2.3x120mm abrasives; type:wire brush; material:nylon with abrasive coating; brushdiameter:2.3 mm; overall length:120 mm; brush length:80 mm; application:extruderdie holes cleaning 75 ea 195 0t4516380015 blade,hacksaw,hss,12x1in hand tools; type, tool:blade,hacksaw; manufacturer part number:miranda orequivalent; material:high speed steel; dimension:12 x 1 in 76 ea 196 0t1562990012 grub scr,cs,m8x25mm screw; type:grub; mat, screw:carbon steel; size:m8 x 25 mm 110 ea 197 0t1586610004 padlock,5lever,w/3 key,godrej padlocks; type:5 lever; manufacturer:godrej; with 3 key 121 ea 198 0t0105760011 brush,wire,brass,25x150mm abrasives; type:wire brush; size:25 x 150 mm; material:brass; with wooden handle 223 ea 199 0t4516380002 blade,hacksaw,12x1/2in,hss hand tools; type, tool:hacksaw blade; material:high speed steel; dimension:12 x 1/2in; manufacturer:miranda or equivalent 367 ea 200 0t0105760010 brush,wire,3/8in,ss,flat abrasives; type:wire brush; size:3/8 in; material:stainless steel; for surface cleaning; shape:flat; with wooden handle 200 ea 201 0t0105760002 brush,wire,1x12in,ss abrasives; type:wire brush; size:wdt 1 x lg 12 in; material:stainless steel 300 ea 202 0t0105760001 brush,wire,1x12in,cs abrasives; type:wire brush; size:wdt 1 x lg 12 in; material:carbon steel 700 ea 203 0t4003060004 guide bar,14in,f/chain saw spare parts; part name:guide bar; dimensions:14 in; additional information:for chain saw 1 ea 204 0p4001050000 drill bit,concrete small tools; description:concrete drill bit; for drill machine; size, drill machine:1/8, 5/32, 1/4, 5/16, 3/8, 1/2 in 1 st ________________________ (sign & stamp of bidder) tender no. 2340c00251 page 78 of 98 sl no material code item detailed item description tentative qty for 02 years uom hsn code 205 0t1586230017 can,oil,500ml,1/4in oil can; capacity:500 ml; additional information:hose pipe size:1/4 in 1 ea 206 0t2690911142 brush,nylon,lg11in laboratory requisites; bottle brush; nylon; 11 in total length; 5 x 2 in brushdimension; wire wound handle with loop; make:local 1 ea 207 0t2915020019 powder,lapping,diamond,2 4micron machine tools; description:powder,lapping; material:diamond; size range: 2 to 4micron 2 kg 208 0t2556150031 o ring kit,viton,1/32 3/8in,1m cord, o ring; mat:viton; length:1 m; size:1/32 to 3/8 in 2 pac 209 0t2556150032 o ring kit,viton,1 7mm,1m cord, o ring; mat:viton; length:1 m; size:1 to 7 mm 2 pac 210 0t3528030040 bucket,plastic,15l office consumables; type:bucket; material:plastic; capacity:15 l 2 ea 211 0t4522120001 diamond needle file set,11 type,140mm hand tools; type, tool:diamond needle file set; length:140 mm; quantity:11 type of pieces 3 ea 212 0t4532010006 strap wrench,11.3/4in,7/8 2in hand tools; type, tool:strap wrench; length:11.3/4 in; diameter, pipe:7/8 to 2 in 3 ea 213 0t4516400087 handle,1 1/2in,f/rnd die hand tools; type, tool:handle; for round die; size:1 1/2 in 3 ea 214 0t4516400088 handle,2in,f/rnd die hand tools; type, tool:handle; size:2 in; for round die 3 ea 215 0p2548690004 sheet,gskt,non asb,af 154,1500x1600x1mm gasket sheet; type:metallic; style:af 154; material:non asbestos; thickness:1 mm; dimensions, sheet:1500 x 1600 mm;manufacturer:champion / spitmaan; suitable for hot oils and hydrocarbons (asbestos fibre free) 3 ea 216 0t4523200009 gauge,feeler,100mm,26blades tools, measuring; type, tool:gauge,feeler 3 st 217 0t4523200010 gauge,feeler,150mm,26blades tools, measuring; type, tool:gauge,feeler; number of blades:26; size:150 mm 3 st 218 0t4523200008 gauge,feeler,4in,26blades tools, measuring; type, tool:gauge,feeler; number of blades:26; size:4 in 3 st 219 0t4523200006 gauge,filler,6in tools, measuring; type, tool:filler gauge; size:6 in 3 ea 220 0t4517080016 drill bit,parallel shank,hss,12.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:12.0 mm 4 ea 221 0t4517080020 drill bit,parallel shank,hss,10.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:10.5 mm 4 ea 222 0t4523200011 gauge,plstc,0.025 0.500mm tools, measuring; type, tool:gauge; material:plastic; measuring size:0.025 to0.500 mm; for clearance measurement 4 st 223 0t4516400089 handle,13/16in,f/rnd die hand tools; type, tool:handle; size:13/16 in; for round die 4 ea 224 0t4516400086 handle,1in.f/rnd die hand tools; type, tool:handle; for round die; size:1 in 4 ea 225 0t4516930019 straight cutter,hss,f/flexi grinder small tools; description:straight cutter; for flexible grinder; suitable for ff2grinder application:for high speed steel material 5 ea 226 0t4516930018 conical cutter,hss,f/flexi grinder small tools; description:conical cutter; for flexible grinder; suitable for ff2grinder application:for high speed steel material 5 ea 227 0p2549880045 sheet,gskt,5mm,2000x1500mm gasket sheet; dimension:2000 x 1500 mm; thickness:5 mm; asbestos jointing gasketmetalic; kliinglright 1000; manufacturer:ukl 5 ea 228 0t4532060239 dresser,diamond,1.5carrat hand tools; type, tool:grinding wheel dresser; material of tip:diamond; size:1.5carrat 5 ea 229 0t0116100009 cloth,emery,2in,50m/roll,80gr abrasives; type:emery cloth; size:width:2 in; grade:80; form of supply:roll of 50 m 5 rol 230 0t0116100010 cloth,emery,2in,50m/roll,100gr abrasives; type:emery cloth; size:width:2 in; grade:100; form of supply:roll of 50 m 5 rol 231 0t0116100011 cloth,emery,2in,50m/roll,120gr abrasives; type:emery cloth; size:width:2 in; grade:120; form of supply:roll of 50 m 5 rol 232 0t0116100012 cloth,emery,2in,50m/roll,150gr abrasives; type:emery cloth; size:width:2 in; grade:150; form of supply:roll of 50 m 5 rol 233 0t0116100013 cloth,emery,2in,50m/roll,180gr abrasives; type:emery cloth; size:width:2 in; grade:180; form of supply:roll of 50 m 5 rol 234 0t4517080022 drill bit,parallel shank,hss,10.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:10.0 mm 6 ea 235 0t4517080049 drill bit,parallel shank,hss,1.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:1.5 mm 6 ea 236 0t4517080051 drill bit,parallel shank,hss,1.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:1.0 mm 6 ea 237 0t4523080001 gauge,dial,lc 0.01,0 10mm tools, measuring; type, tool:dial gauge; measuring range:0 to 10 mm;least count(lc):0.01 6 ea 238 0t0115980015 grinding wheel,250x25x31.75mm,39g60 abrasives; type:grinding wheel; size:250 x 25 x 31.75 mm; grade:39g60 6 ea 0p2549880042 sheet,gskt,2mm,2000x1500mm gasket sheet; dimension:2000 x 1500 mm; thickness:2 mm; asbestos jointing gasketmetalic; kliinglright 1000; manufacturer:ukl 7 ea 240 0p2549880043 sheet,gskt,3mm,2000x1500mm gasket sheet; dimension:2000 x 1500 mm; thickness:3 mm; asbestos jointing gasketmetalic; kliinglright 1000; manufacturer:ukl 7 ea 241 0t4516890013 gskt cutter,2 14 564,stnly tl hand tools; type, tool:gasket cutter; manufacturer:stanley tools; hand operatedgasket cutter plier; model number:2 14 564 (straight jaws) 8 ea 242 0t4517080023 drill bit,parallel shank,hss,9.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:9.5 mm 11 ea 243 0t4517080027 drill bit,parallel shank,hss,8.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:8.5 mm 11 ea 244 0t4517080030 drill bit,parallel shank,hss,8.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:8.0 mm 11 ea 245 0t4517080034 drill bit,parallel shank,hss,6.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:6.5 mm 11 ea 246 0t4517080035 drill bit,parallel shank,hss,6.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:6.0 mm 11 ea 247 0t4517080037 drill bit,parallel shank,hss,5.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:5.0 mm 11 ea 248 0t4517080042 drill bit,parallel shank,hss,4.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:4.0 mm 11 ea 249 0t4517080044 drill bit,parallel shank,hss,3.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:3.0 mm 11 ea 250 0t4517080046 drill bit,parallel shank,hss,2.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:2.0 mm 11 ea 251 0t1616010004 ceramic,cloth,5x5m,f/1250°c fire blankets; mat:ceramic; type:cloth; size:5 x 5 m; for temperature:1250 degc; should be fire proof 11 ea 252 0t2549880047 sheet,gskt,jointing,neoprene rbr,5mm gasket sheet; jointing; material:neoprene rubber; thickness:5 mm 11 ea 253 0t4525220002 tape,measuring,mtl,5m tools, measuring; type, tool:measuring tape; material:metallic; length:5m 14 ea 254 0t3379050013 wire mesh,ss316,10,1m wire mesh; mat:stainless steel 316; width:1 m; mesh size:10 16 m 255 0t3379050010 wire mesh,ss316,100,1m wire mesh; mat:stainless steel 316; width:1 m; mesh size:100 19 m 256 0t3379050011 wire mesh,ss316,20,1m wire mesh; mat:stainless steel 316; width:1 m; mesh size:20 19 m 257 0t4516370001 oil stone,sillicon carbide hand tools; type, tool:oil stone 20 ea 258 0p2512300007 sealant,jnt,ptfe,14x5mm joint sealant; type:expanded; material:ptfe; size:14 x 5 mm 21 m 259 0t3379050014 wire mesh,ss316,50,1m wire mesh; mat:stainless steel 316; width:1 m; mesh size:50 21 m 260 0t4516520001 inspection mirror,rect,2.1/8x3.1/2in hand tools; type, tool:inspection mirror; shape:rectangular; size:2.1/8x3.1/2 in 25 ea 261 0t2668102870 wrapping roll,plastic laboratory requisites; type, accessory:wrapping roll; mat:plastic; for equipmentcovering and protecting purpose 28 rol 262 0t1586470001 tape,soft ptfe,1/2in,adh tape; type:adhesive; material:soft ptfe; size, tape:1/2 in 28 ea 263 0t1586470004 tape,soft ptfe,adh,1in tape; type:adhesive; material:soft ptfe; size, tape:1 in 28 ea 264 0t1586470003 tape,soft ptfe,3/4in,adh tape; type:adhesive; material:soft ptfe; size, tape:3/4 in 33 ea 265 0t3379050012 wire mesh,ss316,14,1m wire mesh; mat:stainless steel 316; width:1 m; mesh size:14 36 m 266 0t2515100009 tape,grfoil,1/2inx10mx0.4mm,wo/adhesive tape; material:grafoil; dimension:1/2 in x 10 m x 0.4 mm; without adhesive 39 ea 267 0t0105200010 stag b,sealing jt paste,lead free,1kg compounds; application:sealing joint paste; packaging unit:1 kg/pack; description:stag b; high temperature steam seal jointingpaste; lead free jointing compound; applicable for plane; temperature range: 40 to +650 °c 40 ea 268 0t3379050002 mesh,wire,ss316,1m,mesh60 wire mesh; mat:stainless steel 316; width:1 m; mesh size:60 42 m 269 0t3379050004 mesh,wire,ss316,1m,mesh120 wire mesh; mat:stainless steel 316; width:1 m; mesh size:120 46 m 270 0t3529030005 brush,painting,1in paint applying equipment; type:painting brush; width:1 in 49 ea 271 0p2512300005 sealant,jnt,ptfe,12x4mm joint sealant; type:expanded; material:ptfe; size:12 x 4 mm 53 m 272 0t3379050003 mesh,wire,ss316,1m,mesh80 wire mesh; mat:stainless steel 316; width:1 m; mesh size:80 54 m 273 0t3529030002 brush,paint,3in,w/wooden handle paint applying equipment; type:brush; size:3 in; with wooden handle 54 ea 274 0t3529030001 brush,paint,2in,w/wooden handle paint applying equipment; type:brush; size:2 in; with wooden handle 55 ea 275 0t4520060001 silastic gun hand tools; type, tool:silastic gun 59 ea 276 0t3379050001 mesh,wire,ss316,1m,mesh40 wire mesh; mat:stainless steel 316; width:1 m; mesh size:40 64 m 277 0p2512300013 sealant,jnt,ptfe,25x5mm joint sealant; type:expanded; material:ptfe; size:25 x 5 mm 77 m 278 0t5579020001 marker,metal,black metal marker; colour:black 77 ea 279 0t5579020002 marker,metal,blue metal marker; colour:blue 77 ea 280 0t3508080002 oil sorbent pad,17x19in,3m hp 156,3m cleaning & purification consumables; type:oil sorbent pad; manufacturer:3m;manufacturer part number:3m hp 156; pad size:17 x 19 in 88 ea 281 0t2549880020 sheet,gskt,oil paper,1mm gasket sheet; type:oil paper; thickness, gasket:1 mm 103 ea 282 0t5472100001 rope,manila,14mm fibre ropes; diameter:14 mm; mat:manila 110 m 283 0t2462100001 clamp,hose,1/2in,f/oxy acetylene hose clamp; size:1/2 in; for oxy acetylene hose 110 ea 284 0t2462100002 clamp,hose,3/4in,w/bolt&nut hose clamp; size:3/4 in; with bolt & nut 110 ea 285 0t2668102868 tissue paper roll,soft,10cm,10m,white laboratory requisites; type, accessory:tissue paper roll; type:soft;color:white; pattern:plain; width:10 cm; roll length:10 m 121 rol 286 0t1562990010 grub scr,cs,m8x15mm screw; type:grub; mat, screw:carbon steel; size:m8 x 15 mm 128 ea 287 0t1562990006 grub scr,cs,m6x15mm screw; type:grub; mat, screw:carbon steel; size:m6 x 15 mm 139 ea 288 0t2549880018 sheet,gskt,oil paper,0.2mm gasket sheet; type:oil paper; thickness, gasket:0.2 mm 139 ea 289 0t2549880017 sheet,gskt,oil paper,0.1mm gasket sheet; type:oil paper; thickness, gasket:0.1mm 142 ea 290 0t2549880019 sheet,gskt,oil paper,0.3mm gasket sheet; type:oil paper; thickness, gasket:0.3 mm 151 ea 291 0t0116350007 paper,emery,11x9in,180gr abrasives; type:emery paper; size:11 x 9 in; grade:180 220 ea 292 0t0116350002 paper,emery,11x9in,60gr abrasives; type:emery paper; size:11 x 9 in; grade:60 561 ea 293 0t0116350005 paper,emery,11x9in,120gr abrasives; type:emery paper; size:11 x 9 in; grade:120 561 ea 294 0p2512300009 sealant,jnt,ptfe,20x3mm joint sealant; type:expanded; material:ptfe; size:20 x 3 mm 1 m 295 0t1562990002 grub scr,cs,m4x15mm screw; type:grub; mat, screw:carbon steel; size:m4 x 15 mm 1 ea 296 0t2548690024 sheet,gskt,air bubble,12in,100m gasket sheet; type, sheet:air bubble; width:12 in; length:100 m 1 ea 297 0t4517080026 drill bit,parallel shank,hss,9.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:9.0 mm 1 ea 298 0t4517080031 drill bit,parallel shank,hss,7.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:7.5 mm 1 ea 299 0t4517080033 drill bit,parallel shank,hss,7.0mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:7.0 mm 1 ea 300 0t4517080036 drill bit,parallel shank,hss,5.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:5.5 mm 1 ea 301 0t4517080039 drill bit,parallel shank,hss,4.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:4.5 mm 1 ea 302 0t4517080043 drill bit,parallel shank,hss,3.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:3.5 mm 1 ea 303 0t4517080045 drill bit,parallel shank,hss,2.5mm small tools; description:drill bit; type:parallel shank; material:high speed steel; diameter:2.5 mm 1 ea 304 0t2915020020 clth,polishing,16in.rnd,f/lapping polishing cloth; type:round; size:16 in; for lapping 1 ea 305 0t0102040057 lapping paste,diamond,8 12micron compounds; description:lapping paste; material:diamond; size range:8 to 12micron 1 kg 306 0t0102040058 lapping paste,diamond,14 20micron compounds; description:lapping paste; material:diamond; size range:14 to 20micron 1 kg 307 0t0102040059 lapping paste,silicon,29micron compounds; description:lapping paste; material:black silicon carbide; sizerange:29 micron 1 kg 308 0t0102040060 lapping paste,boron carbide,15micron compounds; description:lapping paste; material:boron carbide; sizerange:15micron 1 kg 309 0t0102040061 lapping paste,boron carbide,5micron compounds; description:lapping paste; material:boron carbide; size range:5micron 1 kg 310 0t3603020087 oil,5 210l,f/lapping machine oils; application:lapping machine; form of supply:5 to 210 l 1 l 311 0t4516380016 hacksaw blade,21x1.1/2in,6tpi hand tools; type, tool:hacksaw blade; size:21 x 1.1/2 in; 6 tpi; for power hacksaw machine 1 ea 312 0p2548690005 sheet,gskt,non asb,af 154,1500x1600x2mm gasket sheet; type:metallic; style:af 154; material:non asbestos; thickness:2 mm; dimensions, sheet:1500 x 1600 mm;manufacturer:champion / spitmaan; suitable for hot oils and hydrocarbons (asbestos fibre free) 1 ea 313 0t0116100003 sheet,cloth,emery,11x9in,dbl zero size abrasives; type:emery cloth sheet; size:11 x 9 in; size:double zero 1 ea 314 0t0116100004 sheet,cloth,emery,11x9in,zero size abrasives; type:emery cloth sheet; size:11 x 9 in; size:zero 1 ea 315 0t0116100005 sheet,cloth,emery,11x9in,1size abrasives; type:emery cloth sheet; size:11 x 9 in; size:1 1 ea 316 0t0116100006 sheet,cloth,emery,11x9in,2size abrasives; type:emery cloth sheet; size:11 x 9 in; size:2 1 ea 317 0t0116100007 sheet,cloth,emery,11x9in,3size abrasives; type:emery cloth sheet; size:11 x 9 in; size:3 1 ea 318 0t0116100008 sheet,cloth,emery,11x9in,4size abrasives; type:emery cloth sheet; size:11 x 9 in; size:4 1 ea 319 0t4520190006 pmp,oil barrel,hand operated,1in pumps; type:oil barrel; operating type:hand; size:1 in 1 ea 320 0t1586230008 jug,measuring,1l measures; type:measuring jug; capacity:1 l 1 ea 321 0t1586230009 jug,measuring,2l measures; type:measuring jug; capacity:2 l 1 ea 322 0t1586230011 can,measuring,galv iron,2l measures; type:measuring can; capacity:2 l; mat:galvanized iron 1 ea 323 0t1586230013 can,measuring,galv iron,10l measures; type:measuring can; capacity:10 l; mat:galvanized iron 1 ea 324 0t3379050005 mesh,wire,ss316,1m,mesh160 wire mesh; mat:stainless steel 316; width:1 m; mesh size:160 1 m 325 0t2462100003 clamp,hose,1in,w/bolt&nut hose clamp; size:1 in; with bolt & nut 1 ea 326 0t2462100004 clamp,hose,1.1/2in,w/bolt&nut hose clamp; size:1.1/2 in; with bolt & nut 1 ea 327 0t2462100005 clamp,hose,2in,w/bolt&nut hose clamp; size:2 in; with bolt & nut 1 ea 328 0t4525140004 punch set,number,3mm hand tools; type, tool:number punch set; general purpose; number:0 to 8; size:3mm 1 st 329 0t4525140005 punch set,figure,3mm hand tools; type, tool:figure punch set; general purpose; number:a to z; size:3mm 1 st 330 0t4516930016 shim cutter,straight jaw,12in hand tools; type, tool:shimm cutter; type:straight jaw; size, cutter:12 in; highquality 1 ea 331 0t4516500001 pocket magnet,2.5in hand tools; type, tool:pocket magnet; size:2.5 in 1 ea 332 0t4516800002 scrapper,brass,6in hand tools; type, tool:scrapper; material:brass; size:6 in 1 ea 333 0t4516800003 scrapper,12in hand tools; type, tool:scrapper; size:12 in 1 ea ...

Urban Development And Housing Department - Gujarat

36891059 bids are invited for backhoe loader >50 0.3 cubic meter ., lcv chassis mounted mini fire fighter 1 aluminum extension ladder 10.5 m 01 no. 2 search light 01 no. 3 gum boot 03 nos. 4 first aid box for 10 persons 01 no. 5 rubber gloves ( pair ) 02 pairs 6 large axe 01 no. 7 spade 01 no. 8 pickaxe 01 no. 9 crowbar 01 no. 10 sledge hammer 01 no. 11 helmet 03 nos. 12 fire blanket 5x4 01 nos....

Gas Authority Of India Limited - Gujarat

36688706 procurement of personal protective equipment and consumables fire and safety items. , socks, wind size:d:2 ft x l:12 ft thickness: 4 mm,width: 1 ft colour: red and white refer specification of ppes and consumables , fire blanket piece type: non asbestos refer specification of ppes and consumables , barricading tape refer specification of ppes and consumables , ear plugs model:3m,make:1110 rubber cushioned with cord refer specification of ppes and consumables , water jel blanket size: 3ft x 2.5ft refer specification of ppes and consumables , jacket,safety refer specification of ppes and consumables , gloves, hand refer specification of ppes and consumables , hand gloves,pvc polka dotted blue coloured refer specification of ppes and consumables...

Indian Oil Corporation Limited - Gujarat

35737976 procurement of tools for operation and maintenance of dkpl ( group d hse tools ) , fire blanket asbestose, as per technical specification attached , aska inflatable light, as per technical specification attached , non sparking tools set, as per technical specification attached , emergency escape set, as per technical specification attached , fireman axe, as per technical specification attached , chemical / oil splash proof goggles, as per technical specification attached , flame detector testing torch, as per technical specification attached , smoke / heat detector testing kit, as per technical specification attached , breathing apparatus spare cylinder, as per technical specification attached , emergency fire trolley, as per technical specification attached , uv / ir ( flame detectors ) , as per technical specification attached , spare catridge fire extinguishers 09 kg, as per technical specification attached , full body safety harness with double lanyard and shock absorber, as per technical specification attached , safety net 15*18 / 10*8, as per technical specification attached , tripod mounted gas detection system, as per technical specification attached...

Border Security Force - Gujarat

34642581 bids are invited for fire extinguisher items co2 gas cartridge 120 gm , co2 gas cartridge 60 gm , afff chemical 446 500 ml , dry chemical powder , fire beater , fire axe , fire hook , fire bucket , fire belcha , asbestos cloth , fire blanket , smoke detectors , firefighting gloves , firefighting shoes , firefighting helmet , fire extinguisher afff 9 ltr , fire extinguisher dcp 5kg , fire extinguisher water gas cartridge 9 ltr , fire extinguisher co2 2 kg , asbestos rope 25 mtr total quantity : 292...

Indian Oil Corporation Limited - Gujarat

30816271 procurement of tools for commissioning and maintenance of dkpl group e hse tools procurement of tools for commissioning and maintenance of dkpl group e hse tools , group e hse tools , fire blanket asbestose , aska inflatable light , non sparking tools set , emergency escape set , fireman axe , chemical / oil splash proof goggles , flame detector testing torch , smoke / heat detector testing kit , breathing apparatus spare cylinder , emergency trolley , uv / ir ( flame detectors ) , spare catridge fire extinguishers 09 kg , full body safety harness with double lanyard and shock absorber , safety net 15*18 / 10*8 , tripod mounted gas detection system...

Gujarat State Petronet Limited - Gujarat

23343515 supply of personal protective equipment ( ppe ) for various locations of gspl gas grid 1 416 ear plug 3 cotton hand gloves 4 electrical hand gloves 33 kva rating 5 electrical hand gloves 415 volts rating 6 pvc hand gloves 9 cordoning tape ( 250 meter roll ) 10 wind sock 14 dust mask 15 water based gel fire blanket ( 8ftx6ft ) 16 acid proof apron 20 safety goggles msa ( black ) 21 traffic cone 22 folding rescue stretcher 24 safety helmet ( white ) 25 safety helmet orange 28 pa system portable ( megaphone ) 34 hand operated siren with stand...

Gas Authority Of India Limited - Gujarat

18735952 purchase of ppes items of fire & safety for gail samakhiali, jamnagar & kandla region hand gloves, cotton , safety goggles , safety helmet, green , safety helmet, white , safety helmet, yellow , ear plug , ear muff , welding goggles , face shield for grinding, welding job , dust mask , gum boot (large size) , wind sock cloth, fluorescence polyster , stand f/wind sock, ms,size: 5 ft , fire blankets , spark arrestor small , spark arrestor big , barricading tape (in meter) , first aid box , valve key , landing valve...

Directorate Of Employment And Training - Gujarat

17760777 supply of tools and equipment chemical+ppo+auto+dc+dm+sy: 3 . valve spring compressor universal 4 . tandem master cylinder with booster 5 . tyre pressure gauge with accessories | tyre pressure gauge (wall mounted) | tyre pressure gauge to read up to 30 kg. (pencil type) | tyre pressure gauge with holding nipple 6 . compression testing gauge suitable for diesel engine with standard accessories 7 . pencil sharpner (desk type) dimension 10 x 5 x 10 cm 8 . ammetr : 0 to 1000 micro a. (dc) 9 . air ratchet with standard accessories (drive size > 1 ) 10 . bottles for solutions 500 ml (class a) 11 . bucket elevator 12 . conical flask –500 ml (class a) 13 . cut section of screw pump 14 . cut section sliding vane pump 15 . demagnetizer it operates on 230v single phase ac supply and suitable for all types of steel such as hss, nickel chrome, spring steel, die steel etc 16 . diaphragm pump(air operated) max flow rate up to 20 m3/hr head up to 20 mtr material ss 316/ ss 304/ pp/pvde/ aluminium etc air exhaust size 1/2inch bsp air inlet size 1/4 to 1/2inch discharge size 12 mm to 80 mm pressure up to 5 kg/cm2 17 . ear plug 18 . equal angle cutter ø75x 30 x ø 27 90°, material : hss 19 . fire blanket 20 . hammer copper 1 kg with handle 21 . hand shear universal 250 mm 22 . insulated screw driver 30 cm x 9 mm blade, material high carbon steel, ,with insulated sleeve 23 . level sensor 24 . mechanical seal (bellows seal) 25 . mechanical seal (multiple spring) pressure 9.5 kg/cm2 temperature range 23 to 200 degree speed (rpm:) 3000 size (millimeter): 18 200 material grade ss316/ ss304 available ring material :carbon / sic / tc available mating ring material :tc / sic / ceramic secondary seal :viton / ptfe v ring 26 . melting point tester. 27 . needle roller bearing rna4908 28 . oil pump for dismantling and assembly ...

Directorate Of Employment And Training - Gujarat

17281072 purchase of different items, trainee toolkit and shop outfit 144 hygrometer digital 20 to 99 % rh 145 lux meter digital isi standard 146 torque wrench (14 to 68 nm) 147 hardle. 148 digital vernier caliper 0 150 mm. l.c. 0.001 mm.(optional) anti corrosive 149 caliper, odd leg, spring joint length 150mm 150 snip sheet metal straight nose 200 mm   151 snip sheet metal curved nose 200 mm 152 wrench adjustable length 150mm 153 pipe wrench size 50mm to 150mm 154 stop watch water resistance, least count must be mili second, range : 0 sec. to 1 hour 155 vernier caliper length 250mm 156 micrometer outside measurement 0 to 25mm 157 heating kit with infrared bulb (200 w capacity) 158 plumbing hammer weight 200 gm 159 tachometer digital, multi range 0 rpm to 3000 rpm. portable small size in leather case 160 electrical drill portable drill with chuck and key, capacity 6.4 mm isi standard , 230 v , 3000 rpm ( hammering type ) 161 screw driver insulated, plastic handle, flat tip 10mm tip, length 250mm ,hammer proof & fire proof isi standard 162 chipping hammer with spring type metal handle 250 grams 163 scriber 150 mm double point with knurling centre 164 set of rowel punch 8, 10 mm 165 screw driver insulated 200mm , tip3/8 ,hammer proof & fire proof isi standard 166 watt meter dynamo meter type 5 amps. and 250 v, 1.25 kw ,size : 6 x 6 isi standard 167 single phasing preventer with auto restart 415 v isi standard 168 fire blanket fire resistant, size : 8 x 6 169 file flat bastard 250 mm with wooden handle 170 file flat smooth 250 mm with wooden handle 171 tong flat 300 mm, material s.s. 10 mm bar ...

Directorate Of Employment And Training - Gujarat

17281006 purchase of different items, trainee toolkit and shop outfit : 383 gear box reduction type ( cut section ) 384 gear box planetary bevel gear type ( cut section ) 385 gate valve 2 cut section 386 globe valve 2 cut section 387 safety valve ( spring type ) 2 cut section 388 needle valve 25 mm cut section 389 butter fly valve 2 cut section 390 non return valve ( swing check type & lift ball type ) 2 cut section 391 pneumatically operated diaphragm valve. cut section 392 ball valve 2 cut section 393 solenoid valve 394 diaphragm valve 2 cut section 395 control valve. 1cut section 396 cut section of centrifugal pump of back pullout type 397 lazer alignment kit for pump & motor shaft ( wireless 3 axix system ) 398 hydraulic jack 399 pressure vessel with control and maintenance of plant like transmitters, valves, pumps and all parameters simulation software and all accessories 400 flow meter 401 drum 100 litres ( optional ) 402 dust bin 50 litres ( optional ) 403 fire extinguishers ( c02 , ) 404 fire blanket 405 file half round second cut 250 mm 406 file round smooth 250 mm 407 file triangular smooth 150 mm 408 solid die 10 / 12 mm with die stock 409 acetylene cylinder 410 oxygen cylinders 411 gas welding torch with nozzle set 412 instrument for determining g ( simple pendulum ) 413 mechanical board for testing triangle and parallelogram of forces including all accessories 414 simple machines screw jack with accessories 415 searles apparatus for youngs modulus 416 apparatus for measurement of co efficient of expansion ( thermal ) of solid ( plunger’s apparatus ) 417 apparatus for measurement of thermal conductivity of good and bad conductors 418 rheostat 419 ( a ) rheostat 25 ohms 420 ( b ) rheostat 100 ohms 421 resistance box 0 to 500 ohms 422 ammeter 0 to 1000 ma. ( dc ) 423 0 to 10 amp. ( ac, dc ) 424 voltmeter 425 0 to 1 volt ( dc ) 426 0 to 5 volt ( dc ) 427 0 to 10 volt ( dc ) ...

Directorate Of Employment And Training - Gujarat

17219165 tender for supply of tools/equipment/shop outfit for iti jamnagar: 221 file half round second cut 250 mm with handle (jk, tapariya, yuri) 222 file half round, fine double cut, length 150mm with handle (jk, tapariya, yuri) 223 file knife edge smooth 150 mm with handle (jk, tapariya, yuri) 224 file round 2nd cut 150 mm with handle (jk, tapariya, yuri) 225 file round bastard 250 mm with handle (jk, tapariya, yuri) 226 file round second cut 30 cm with handle (jk, tapariya, yuri) 227 file round smooth 250 mm with handle (jk, tapariya, yuri) 228 file square second cut 200 mm with handle (jk, tapariya, yuri) 229 file square second cut 250 mm with handle (jk, tapariya, yuri) 230 file square, fine double cut,length 150mm with handle (jk, tapariya, yuri) 231 file triangular fine double cut length 150mm with handle (jk, tapariya, yuri) 232 file triangular second cut 150 mm with handle (jk, tapariya, yuri) 233 file triangular smooth 200 mm with handle (jk, tapariya, yuri) 234 file triangular smooth 150 mm with handle (jk, tapariya, yuri) 235 file, square 30 cm round (jk, tapariya, yuri) 236 files assorted sizes and types including safe edge file (20 nos) (jk, tapariya, yuri) 237 fin straightened/fin comb. with strong steel wire based combing on wood (standard make) 238 fire blanket (standard make) 239 fire buckets with stand (standard make) 240 firmer chisel ½ ” (tapariya, stanley, anant) 241 firmer chisel 1” (tapariya, stanley, anant) 242 firmer chisel 250mm (tapariya, stanley, anant) 243 flash back arrester (cylinder mounted) (standard make) 244 flash back arrester (torch mounted) (standard make) 245 flat headed hammers with handle. (tapariya, jhalani, eastman) 246 flat tongs 350 mm long (standard make) 247 flow nozzle (delta, vivek, fairflow) 248 flux meter (crown, thermo sensors, dam) 249 foot print grip 250mm (taparia, jk, eastman) ...

Department Of Employment And Training - Gujarat

13516438 supply of tools and equipment electrical 36 external internal growler for small armature 37 file flat 25 cm. second cut 38 file flat 25 cm. smooth 39 file flat 250mm bastard 40 file triangular 150mm 2nd cut 41 file, round 30 cm bastad with handle 42 fire blanket 43 flat tongs 350mm long 44 fluoroscope 45 forge portable hand blower 38 cm to 45 cm. 46 grease gun 47 grease gun heavy duty trolly type 10 kg capacity 48 hacksaw fixed 200 mm ( pistol grip ) 49 hammer ball pane 1 kg with handle 50 hammer ball peen 0.45 kg. with handle 51 hammer ball peen 0.5 kg with handle 52 hammer ball peen 1 kg with handle 53 hammer chipping 0.25 kg 54 hand file 20 cm. second cut flat 55 hollow punch set of seven pieces 6mm to 15mm...

Directorate Of Employment And Training - Gujarat

13510376 purchase of tools and equipments : 110 file round 300mm 2nd cut (make :jk, taparia , venus ) 111 file round 20 cm second cut (make : jk /gador /tapariya) 112 file round 2nd cut 150 mm (make :jk, taparia , venus ) 113 file round 30 cm bastard (make : jk /gador /tapariya) 114 file round 8mm dia, 8 /20 cm length, 2nd cut 115 file round length of 300mm 2nd cut made up of hcs with handle made of red coloured sheesham wood or good quality plastic standard quality (make : jk /tapariya) 116 file square 25 cm second cut (make : jk /gador /tapariya) 117 file square, fine double cut, length 150mm (make : jk /gador /tapariya) 118 file square30cm round 119 file swiss needle type set of 12 | file swiss precision assorted set of 12 nos. swiss type needle set of 12 120 file triangular 20 cm second cut (make : jk /gador /tapariya) 121 file triangular edge 15 cm smooth 122 file warding 15 cm smooth. (make : jk /gador /tapariya) 123 file, half round, fine double cut, length 150mm (make : jk /gador /tapariya) 124 file, square 20 cm second cut (make : jk /gador /tapariya) 125 file, triangular 15 cm second cut (make : jk /gador /tapariya) 126 files assorted sizes and types including safe edge file (make : jk /gador /tapariya) 127 fire blanket range high temperature 550 c, fibre glass fire blanket size 2 x3 128 firmer chisel 1” with wooden handle 129 firmer chisel 6,12,25mm 130 flat file 35 cm bastard (make : jk /gador /tapariya) 131 flatters (rodded) 55 mm square 132 foot print grip 250mm standard quality 133 forge portable hand blower 38 cm to 45 cm....

Directorate Of Employment And Training - Gujarat

11621359 purchase of different items, trainee toolkit and shop outfit hard disks, digital multimeters, cd / dvd writer, standard screw driver set, steeltape, plier insulated, screw driver, electrician connector, screw driver, knife double bladed electrician, neon tester, hammer, gimlet, pincer, scriber, steel rule, try square, file flat, dot slot punch, leather apron, gauge imperial sheet, stone carborandum, lathe tools, oil stone, welding helmet fiber, welding hand shield fiber, dividers, tip cleaner, try square, sand bucket, fire blanket, surface plate, acetylene cylinder, spark lighter, ammeter, digital stop watch, burette clamp, bunsen burners, tripods stand, distilled water, bourdon tube, pressure gauge, bimetallic thermometer, thermocouple, locking devices lock nut , castle nut, wheel & axle, screw jack, punch prick, rubber hose, double ended spanner set, rubber hose clips, stainless steel rule, welding helmet, usb mini dongle, bluetooth headphone, ladel, a.c. energy meter, crimping tool, stilson wrenches, ohm meter, lux meter, neon tester , try square, megger, voltmeter, field regulator, k.w.h meter, dc power supply, tachometer, sand bucket, solar street light lamp set, lead acid battery, acetylene cylinder, rubber hose, rheostat, ph meter digital, burette clamp, hand held vacuum cleaner, online ups with battery, electric drying ovens, shaking machines, refrigerator, safety glasses, fuel injection pump, piston ring expander and remover, spanner, torque wrenches, valve lifter, spanner, file cut saw, hand reamer, lathe tools....

Directorate Of Employment And Training - Gujarat

11621347 purchase of different items, trainee toolkit and shop outfit mini drafter with joint scale, template, geometrical models, french curves, flexible curve, dividers, steel tape, screen for projector, wall clock, set square celluloid, diagonal scale, boning rod, computing scales, wooden cross staff box, gunter’s chain, height indicators, tracing board, metric chain, pen knife, plastic tubes, proportionate compass, ranging rod, offset rod, optical square, survey plotting scale, stencil set, substance bar, metallic tape, steel bend, melting pot, motorised bench grinder, bearing puller, hygrometer, tweezers, ameter, growler, rotary switch, limit switch, load banks, knife switch, flux meter, laboratory type induction coil, geyser, pipevice, oven stove, insulators, small crimping tools, lux meter, foot print grip, pliers round nose insulated, allen keys set, electric soldering iron, rubber gloves, voltmeter, megger, field regulator, watt meter, electrician knife, k.w.h meter digital, digital multimeter, soldering iron, power meter, computer toolkits, motherboard, hard disk, optical drives, pen drives, mouse, digital camera, smps tester, modem, telephone line, wireless network adapter, router, lan cable tester, magnifying lense, continuity tester, first aid kit, dimmer start, digital web cam, fire blanket, bluetooth headphone & mic set, drill twist set, oxygen gas pressure regulator, rubber hose, digital viscometer, pointer puller, temperature switch, tube cutter, allen key set, clamp holders, lapping plate, stud extractor, hydraulic bearing puller, gate valve, gear box, non return valve, butter fly valve, needle valve, safety valve, globe valve, solenoid valve, diaphragm valve, mechanical seal, control valve....

Directorate Of Employment And Training - Gujarat

11621326 purchase of different items, trainee toolkit and shop wire stripper, ohm meter, multi meter, flux meter, hygrometer digital, lux meter, torque wrench, roughness comparison plates, caliper,, anti corrosive, wrench, snip sheet, stop watch, micrometer, plumbing hammer, heating kit, circulating water pump, k.w. meter, screw driver, rowel punch, welding helmet, fire blanket, file, calorimeter, burette clamp, asbestos wire gauge, oxygen gas pressure regulator, hydrometer, tripods stand, clamp holders, pipettes, measuring cylinder glass, volumetric flask, beaker, funnels, evaporating dish, watch glass, distilled water, rubber cork, condenser, allen key set, air blow gun, ammeter, belt tensioner gauge, clamps, cylinder bore gauge, depth micrometer, drift punch copper, drift punch copper, electric soldering iron, grease gun, glow plug tester, gloves, hacksaw frame, hammer, insulated screw driver, multimeter, magnifying glass, oil stone, pipe cutting tool, oil stone, lux meter, flux meter, spanner set, number punch, argon gas pressure regulater, flash back arrester, leather hand gloves, s.s wire brush, safety boots, rubber hose clips, arc welding cables, gas welding goggles, welding helmet, stainless steel rule, dividers, hack saw frame, earth clamp, argon gas pressure regulator, flash back arrester....

Directorate Of Employment And Training - Gujarat

11600999 e tendor of tools and equipments dust bin, sand bucket, fire blanket, drill twist set, allen key set, screw pump, gear box, pressure vessel, types pumps, metering pump, digital web cam, online ups, monitors led backlit, network storage, laptop tools kits, media convertor ports, lc connector module, electrician screw driver, potential transformer, scissors blade, smart phone, led lighting system, vee block with clamp pair blocks, monochromatic light source, inclined limb manometers, pressure transducers training kits, pneumatic calibrator, vortex flow meter, coriolis mass flow meter, flow nozzle, integrated direct level indicator trainer, level indicator, resistance bulb, optical pyrometer, temperature transmitter, electric actuators, adc to dac cards, fire extinguisher, steam generator, co2 fire extinguisher, temperature calibration bath, solid flow measurement, viscosity meter, universal calibrator, pressure safety valve, pneumatic and electronic recorders, paperless recorder, paperless recorder, drift punch copper, fuel injection pump, soldering copper hatchet, spanner clyburn, tandem master cylinder, taps and wrenches, spring tension tester, digital balance, vacuum pump, chromatographic equipment, mortar, clamp, oswald viscometer, rotameter, altimeter, apparatus, turbidity meter....

Industrial Training Institute - Gujarat

10810281 supply of tools & equipments: group mechanical : 513 oven, electrode drying 0 to 350°c, 10 kg capacity 514 oxy acetylene gas cutting blow pipe 515 portable abrasive cut off machine 516 wooden mallet /nylon mallet 500 gm good finish 517 stainless steel rule 30 cm having engraved readings in inch and cm (sharp, h.s.s.) (engineers rule) 518 file square 25 cm second cut (make : jk /gador /tapariya) 519 round punch 3mm,4mm,6mm (each) 520 scraper flat 15 cm 521 punch round 3 mm x 4 mm set of 2. 522 arm strong type tool bit holder lh 523 chisel cold flat 10 cm. 524 drill chuck 12 mm cap with key (set) 525 file, square 20 cm second cut (make : jk /gador /tapariya) 526 vernier gear tooth caliper resoultion 0.02 mm, product dimension 22x22x4 cm., material stainless steel, product weight: 621 gram. 527 caliper 15 cm hermaphrodite. 528 caliper, odd leg, spring joint length 150mm 529 spirit level 0.05 metel 200 m 530 spirit level precision metallic 200mm 531 file square, fine double cut, length 150mm (make : jk /gador /tapariya) 532 stock and die set for 20 mm to 50 mm g.i. pipe, with double handle rachit type standard quality make tapariya/ gador/ jhalani/ jk/ ambika 533 pinch of tool, for copper tube, 6mm to 18mm dia (set) 534 refrigerant cylinder 2.5 kg 535 file cut saw 15 cm smooth (make : jk /gador /tapariya) 536 vernier caliper outside, inside and depth 200 mm /8 inches with metric & inch scale (mitutoyo, starrett, igaging) 537 chisel cold 25 mm x 200 mm, make taparia/ it / jk 538 vernier caliper 0 150 mm. l.c. 0.02 mm. (mitutoyo, starrett, igaging) 539 sand bucket 540 fire blanket range high temperature 550 c, fibre glass fire blanket size 2 x3 meter 541 letter and number punch 5mm 542 chisel cold cross cut 9 mm x 150 mm 543 universal weld measuring gauge 544 stop watch 545 wire gauge metric and with worth steel plate embossing converse of british & metric 546 gas leak detector for halogen gas 547 capillary plug gauge 6 18mm (set) 548 vernier caliper length 250mm (mitutoyo, starrett, igaging) 549 micron vacuum gauge capable of reading up to 20 microns 550 tape measuring graduation in mm 2 m 551 filler gauge 0.05 mm – 1 mm 552 tap set –m 8, m10 m12 553 vernier height gauge 0 300 mm with least count = 0.02 mm...

Directorate Of Employment And Training - Gujarat

10312616 purchase of tools and equipments: 1 0 smps tester 2 0 router 3 0 managed layer 2 ethernet switch 8/16/24 port 4 0 managed layer 3 ethernet switch 8/16/24 port 5 0 power meter 6 0 media convertor 7 0 radius gauge 1 to 7 mm & 7.5 to 15 mm 8 0 drum 100 litres (optional) 9 0 dust bin 50 litres (optional) 10 0 safety shoes ( regular size ) 11 0 safety hand gloves leather ( regular size ) 12 0 ear plug 13 0 helmet 14 0 sand bucket 15 0 fire blanket 16 0 file round smooth 250 mm(available 200 mm) 17 0 file square second cut 200 mm 18 0 drill twist set tapper shank 12 to 25 mm...

Directorate Of Employment And Training - Gujarat

10312596 supply of tools & equipments (mechanical, automobile ,chemical, electrical) items : 240 903006045 cylinder key 241 900008720 sand bucket 242 900008721 fire blanket 243 901004438 gauge screw pitch metric 0.25 to 6 mm 244 901004307 vernier calliper 0 200 mm with least count 0.02mm 245 901001848 vernier height gauge 0 300 mm with least count = 0.02 mm 246 universal dial test indicator plunger type range 0 10 mm, graduation 0.01 mm & 0.001mm reading 0 10 with revolution counter complete with clamping devices and magnetic stand 247 301002901 micrometer outside 0 25 mm 248 900008722 surface plate granite 450 x 450mm with stand and cover 249 900008723 acetylene cylinder 250 900008724 oxygen cylinders 251 900006002 oxygen gas pressure regulator double stage 252 900008725 gas welding torch with nozzle set 253 300001494 instrument for determining g (simple pendulum) 254 301001552 inclined plane with pulley, pan, weights etc. 255 301001675 simple machines screw jack with accessories 256 301001624 searles apparatus for youngs modulus 257 302001534 calorimeter for determining joule’s mechanical equivalent of heat by electric method 258 300001496 (b) rheostat 100 ohms 259 301001648 resistance box 0 to 500 ohms 260 301001682 ammeter0 to 1000 ma. (dc) 261 301001683 ammeter 0 to 10 amp. (ac, dc) 262 301001574 voltmeter 0 to 5 volt (dc) 263 301001568 voltmeter 0 to 10 volt (dc) 264 303001586 battery eliminator 265 1 700008634 2 301001597 milli voltmeter 1) 0 5mv 2) 0 500mv 266 301002980 digital stop watch 1/10 second 267 301001658 ph meter digital 268 300008727 burette clamp 269 303002164 bunsen burners 270 305002185 tripods stand 271 303002152 stands with clamps for burette 272 303003036 distilled water still 10 ltr 273 300008730 gas detector with air tight chamber 274 300002175 bourdon tube(c type) pressure gauge 275 301000144 capsule type pressure gauge 276 r.t.d. thermometer pt100 277 903000218 sight glass level indicator...

Industrial Training Institute - Gujarat

10284657 supply of equipments: 151 combination pliers 8/20 cm 152 complete set of taps and dies in metric (8, 10,12 mm) 153 voltmeter : 0 to 10 volt (dc) 154 milli volt. 1)0 5 155 voltmeter : 0 to 5 volt (dc) 156 battery eliminator 157 center punch 4/10 cm 158 twist drill (straight shank) 1/8 to 1/2 by 1/64 (set) 159 welding gloves safety hand leather , regular size 160 0 to 500 milli volt 161 hacksaw frame fixed 300 mm 162 screw driver 12”x1/2 blade 163 hammer ball pein ½ ib | hammer ball pain ½ lb handle | hammer ball pein ½ lb handled 164 try square 6 blade/15 cm 165 thermometers 0 to 36 º c 166 resistance box 0 500 ohms 167 anvil 168 surface plate granite 450 x450 mm 169 ph meter digital 170 prick punch 100 171 resistance coils (2 ohms, 5 ohms, 10 ohms, 100 ohms) | resistance coils (2 ohms, 10 ohms) 172 rule steel 12” english and metric 30 cm | rule steel 12”english &metric/30cm | steel rule 12” | steel rule 12” english & metric /30cm 173 simple machines (wheel and axle). screw jack inclined plane with roller or trolley, pulleys or pulley blocks for first, second and third system of pulleys 174 specific gravity bottle 175 ammeter : 0 to 1 amp. (dc) | ameters with stands : 0 1 amp (dc) 176 ammeter : 0 to 10 amp. (ac, dc) | ammeter 0 10 d.c | ampere meter : 0 – 10 amp (ac / dc) 177 thermometers 0 to 250°c | thermometers : 0 to 250 º c 178 multimeter analog & digital | multi meter 179 micrometer outside 0 1” | micrometer outside 0 1 180 allen keys 1/16”to 1/2x1/32 | allen keys 1/16 to 1/2 by 1/32 181 caliper inside spring 6 “/15 cm | inside spring caliper 6/15 c 182 ball pane hammer 0.5 kg with handle | ball pein hammer 500gms | hammer ball pain 450 gms, with handle | hammer ball peen 0.5 kg with handle | hammer ball peen 450gms | hammer ball peen with handle 0.50 kg. | hammer ball pein 0.500 kg | hammer ball pein 1 lb | hammer ball pein 450 gms | hammer ball pien 0.450 kg | hammer driling machine 12mm capicity | hammer engineers, ball peen 0.50 kg. | hammer handle 183 chisel cross out 3/8” x 1/8* | chisel cross cut 3/8x 1/8 184 sand bucket 185 fire blanket 186 acetylene cylinder 187 oxygen cylinders 188 gas welding torch with numberzzle set 189 burette clamp 190 tong flat 300 mm 191 different types of pipe fittings 192 locking devices lock nut , castle nut 193 drum 100 litres (optional) 194 dust bin 50 litres (optional) 195 stool height 450 mm 196 letter and number punch 5mm 197 file round smooth 250 mm 198 double ended spanner set metric 6*7 to 30*32 199 tong flat 300 mm 200 safety shoes(regular size)...

Industrial Training Institute - Gujarat

10246330 supply of general tool and equipments: 198 902000514 annual repair contract welding single coloured glasses 108 mm x 82 mm x 3 mm. din 11a &12 a 199 600001914 blow lamp 1 liter capacity made from brass sheet isi standard quality 200 303002164 bunsen burners 201 300008727 burette clamp 202 202003837 canvas bag 203 1100005973 cotton hand gloves 8” 204 900003870 digital thermometer [treated as consumable] graduated disc analogy type 205 900008721 fire blanket range high temperature 550 c, fibre glass fire blanket size 2 x3 meter 206 900006656 fire buckets 10 litre 207 602001989 foot print grip 250mm standard quality 208 100005984 gas welding goggles with colour glass 3 or 4a din 209 1105004660 gloves for welding (leadher & asbestos) 210 1105001486 leather apron 211 900005972 leather hand gloves 14” 212 900005976 leather hand sleeves 16” 213 900005977 leg guards leather 214 903000781 magnifying lenses 75mm diameter of 75mm glass lens(3 inches),200m , 5x magnification optical material : glass , size of lense with frame needs to be of 14.5x 7.5cm minimum 215 300008737 pitot tube setup moc: copper / ss compitible , size fitted with vernier scale, water circuler fhp pump measuring tank 40 litre, sump tank 70 litre. control pannel : on / off switch indicator mains. 216 902004499 rubber gloves 5000volts isi standard quality 217 900005980 rubber hose acetylene 8 mm dia x 10 mts long as per bis (meter) 218 900005978 rubber hose clips 1/2 inch 219 900005979 rubber hose oxygen 8 mm dia x 10 mts long as per bis (meter) 220 903000531 safety boots for welders 221 903003656 safety goggles. 222 900008720 sand bucket 223 303002152 stands with clamps for burette height 3 foot 224 900003639 thermometer 0 to 100 deg centigrade 225 903002394 welding helmet fiber 226 900006098 wooden mallet /nylon mallet 500 gm good finish...

Directorate Of Employment And Training - Gujarat

8731876 purchase of different items, trainee trainee toolkit and shop outfit for various trades blueray writer bluetooth headphone & mic set digital web cam ( high resolution ) external solid state hard disk 1 tb external usb hard disk 1 tb standalone hard disk 1 tb smartphone ( 2 gb ram, 16gb internal memory ) usb mini dongle for bluetooth devices connection wifi router / 24 port switch with wireless connectivity option digital balance ( 0 200 gm with 0.01 gm accuracy ) led lignting system load cells of verious ranges sensor trainer kit ( with thermocouple, rtd, thermocouple, load cell, lvdt, smoke sensors, ) home theatre system ( sony, philips, samsung ) 3 d blue ray play, 100w, 5.1 ch fire extinguisher co2, 2kg fire extinguisher dry chemical 5 kg fire extinguishers ( dry chemical powder ) fire blanket mini drafter networking tool kit oven, electrode drying 0 to 350a ⁰c, 10 kg capacity pointer extractors [ puller ] pot melting sesmic instrumenths snap gauge synchronoscope temperature transmitter, pneumatic vibrometer sensing elements watch maker screw driver [ set of six ] wire type strain gauge ( load cell / cantilever beem ) u tube manometer accelometr below and liquid seal drum type flow meter capacitance type level transmitter hart divice communicator and calibrator lcd based dpm digital and analog bread board trainer digital planimeter. template –architects and builders templates – circle, ellipse, auto level drawing board ( 700mm x 500mm ) is : 1444...

Directorate Of Employment And Training - Gujarat

8726639 purchase of different types of tools / equipment and shopout fit for various trades ( part 4 of 5 ) 774 scraper flat 250 mm , standard make 775 scraper half round 250 mm , standard make 776 scraper triangular 250 mm , standard make 777 surface plate granite 600 x 600 mm with stand and cover , standard make 778 acetylene cylinder , standard make 779 oxygen cylinders , standard make 780 electric spark lighter , standard make 781 oxygen gas pressure regulator double stage , standard make 782 acetylene gas pressure regulator double stage , standard make 783 rubber hose acetylene, diameter = 8 mm, length = 10 meters , standard make 784 rubber hose oxygen, diameter = 8 mm, length = 10 meters , standard make 785 rubber hose clips 1 / 2 inch , standard make 786 tong flat 300 mm , standard make 787 gas welding torch with nozzle set , standard make 788 mechanical board for testing triangle and parallelogram of forces including all accessories , standard make 789 inclined plane with pulley, pan, hanger weights etc. , standard make 790 simple machines screw jack , standard make 791 searles apparatus for youngs modulus , standard make 792 rheostat 25 ohms , standard make 793 rheostat 100 ohms , standard make 794 rheostat 500 ohms , standard make 795 resistance box 0 to 100 ohms , standard make 796 resistance box 0 to 500 ohms , standard make 797 resistance coils ( 2 ohms, 5 ohms, 10 ohms, 100 ohms ) , standard make 798 ammeter 0 to 1000 ma. ( dc ) , standard make 799 ammeter 0 to 1000 μa. ( dc ) , standard make 800 voltmeter 0 to 1 volt ( dc ) , standard make 801 voltmeter 0 to 4 volt ( dc ) , standard make 802 voltmeter 0 to 5 volt ( dc ) , standard make 803 voltmeter 0 to 10 volt ( dc ) , standard make 804 battery eliminator , standard make 805 milli voltmeter ) 0 5mv , standard make 806 milli voltmeter 0 500mv , standard make 807 joules calorimeter , standard make 808 steam generator ( copper ) cap. 500ml , standard make 809 bunsen burners , standard make 810 tripods stand , standard make 811 asbestos wire gauge , standard make 812 gauge wire without asbestos , standard make 813 clamp holders , standard make 814 stands with clamps for burette , standard make 815 triangles clay , standard make 816 spatule 8 , standard make 817 distilled water still 10 lit. , standard make 818 glass test tubes 15 ml , standard make 819 round bottom distillation flask with side neck 500ml , standard make 820 condenser for distillation lebig 30 cm long , standard make 821 rubber cork of ( 2.5 cm, 3cm ) size , standard make 822 rubber tubing ( id 5mm ) , standard make 823 rubber bulbs for pipettes , standard make 824 arc welding cables multi cored copper 400 a, 50 meter , standard make 825 tip cleaner set , standard make 826 welding goggle , standard make 827 auto darkening welding helmet , standard make 828 gauge feeler / thickness 0.05 mm to 1 mm by 0.05 and , standard make 829 phillips head screw driver set 1 4 sizes , standard make 830 spanner double ended open set of 6x7, 8x9, 10x11, 12x13, 14x15, 16x17, 18x19, 20x22, 21x23, 24x27, 25x28, 30x32. , standard make 831 ring spanner double ended set of 6x7, 8x9, 10x11, 12x13, 14x15, 16x17, 18x19, 20x22, 21x23, 24x27, 25x28, 30x32. , standard make 832 circlip plier 8 ( internal ) , standard make 833 circlip plier 8 ( external ) , standard make 834 adjustable spanner 200 mm , standard make 835 lapping plate ( 300x300mm ) , standard make 836 stud extractor set of 8 , standard make 837 pilot plan for flow measurement through, orifice meter, rota meter, venture meter , standard make 838 single row deep groove ball bearing no.6309 , standard make 839 cyndrical roller bearing nu307 , standard make 840 taper roller bearing 30208 , standard make 841 needle roller bearing rna4908 , standard make 842 spherical roller bearing 22211 ekc3 , standard make 843 hydraulic bearing puller , standard make 844 3 leg bearing puller 6 , standard make 845 bearing fitting kit including standard sleeve , mallet, bearing induction heater , standard make 846 gate valve 2 cut section , standard make 847 globe valve 2 cut section , standard make 848 safety valve ( spring type ) 2 cut section , standard make 849 needle valve 25 mm cut section , standard make 850 butter fly valve 2 cut section , standard make 851 non return valve ( swing check type & lift ball type ) 2 cut section , standard make 852 pneumatically operated diaphragm valve. cut section , standard make 853 ball valve 2 cut section , standard make 854 solenoid valve , standard make 855 diaphragm valve 2 cut section , standard make 856 control valve. 1cut section , standard make 857 cut section of centrifugal pump of back pullout type , standard make 858 multistage centrifugal pump with balance drum or disk without motor , standard make 859 cut section of internal gear pump , standard make 860 cut section of external gear pump , standard make 861 diaphragm pump ( air operated ) , standard make 862 cut section of screw pump , standard make 863 cut section sliding vane pump , standard make 864 metering pump , standard make 865 lazer alignment kit for pump & motor shaft ( wireless 3 axix system ) , standard make 866 mechanical seal ( multiple spring ) , standard make 867 mechanical seal ( bellows seal ) , standard make 868 mechanical seal ( single spring ) , standard make 869 hydraulic jack , standard make 870 centrifugal blower ( cut model ) , standard make 871 forced draft cooling tower , standard make 872 double pipe heat exchanger , standard make 873 plate heat exchanger , standard make 874 spiral exchangers , standard make 875 vertical tube evaporator , standard make 876 plate and frame filter press , standard make 877 vibrating screen , standard make 878 belt conveyor , standard make 879 pressure sensor , standard make 880 temperature sensor , standard make 881 level sensor , standard make 882 flow meter , standard make 883 calculator scientific , standard make 884 drum 100 litres ( optional ) , standard make 885 dust bin 50 litres ( optional ) , standard make 886 fire blanket , standard make 887 file flat smooth 250 mm , standard make 888 file triangular smooth 150 mm , standard make 889 file square second cut 200 mm , standard make 890 solid die 10 / 12 mm with die stock , standard make 891 gauge screw pitch metric 0.25 to 6 mm , standard make 892 vernier height gauge 0 300 mm with least count = 0.02 mm , standard make 893 surface plate granite 450 x 450mm with stand and cover , standard make 894 spark lighter , standard make 895 cylinder key , standard make 896 instrument for determining g ( simple pendulum ) , standard make 897 mechanical board for testing triangle and parallelogram of forces including all accessories , standard make 898 inclined plane with pulley, pan, weights etc. , standard make 899 ammeter 0 to 10 amp. ( ac, dc ) , standard make 900 battery eliminator , standard make 901 milli voltmeter 1 ) 0 5mv 2 ) 0 500mv , standard make 902 ph meter digital , standard make 903 steam generator ( copper ) cap. 1000ml , standard make 904 burette clamp , standard make905 bunsen burners , standard make 906 tripods stand , standard make 907 stands with clamps for burette , standard make 908 distilled water still 10 lit. , standard make 909 fire alarm system with sprinkler system , standard make 910 gas detector with air tight chamber , standard make 911 bourdon tube ( c type ) pressure gauge , standard make 912 r.t.d. thermometer pt100 , standard make 913 capacitance level indicator , standard make 914 sight glass level indicator , standard make 915 hydrometer , standard make916 final control element ( control valves ) pneumatically & electrically , standard make 917 bearing removing and fitting kit , standard make 918 gear box , standard make 919 rising and falling film evaporator , standard make 920 triple effect evaporator , standard make 921 sieve plate distillation column. , standard make 922 mixer settler type extractor , standard make 923 spray extraction column , standard make 924 batch type tank crystallizer , standard make 925 plate and frame filter press , standard make 926 rotary drum vacuum filter , standard make 927 bottom driven centrifuge , standard make 928 sparkler filter , standard make 929 leaf filter , standard make 930 notch filter , standard make 931 absorption and stripping equipment , standard make 932 rotary drum drier , standard make 933 bucket elevator , standard make 934 cyclone separator and water scrubber , standard make 935 flash point apparatus , standard make 936 bimetallic thermometer , standard make 937 thermocouple , standard make 938 different types of pipe fittings , standard make 939 locking devices lock nut , castle nut , standard make 940 mechanical seal ( multiple spring ) , standard make 941 pitot tube setup , standard make 942 pressure vessel with all accessories , standard make 943 digital viscometer , standard make 944 common effluent treatment plant laboratory size , standard make 945 cut model of different types pumps , standard make 946 metering pump , standard make 947 drum 100 liters ( optional ) , standard make 948 drum 200 liters ( optional ) , standard make 949 drum 50 liters ( optional ) , standard make 950 dust bin 50 liters ( optional ) , standard make 951 caliper inside spring 150 mm , standard make 952 punch prick 100 mm , standard make 953 hacksaw frame fixed 300 mm , standard make 954 file flat smooth 250 mm , standard make 955 file triangular smooth 150 mm , standard make 956 file square second cut 200 mm , standard make 957 chisel cold cross cut 9 mm x 150 mm , standard make 958 chisel cold flat 20 mm x 150 mm , standard make 959 chisel diamond point 9 mm x 150 mm , standard make 960 gauge screw pitch metric 0.25 to 6 mm , standard make 961 vernier bevel protractor 300 mm blade with acute angle attachment , standard make 962 universal dial test indicator plunger type range 0 10 mm, graduation 0.01 mm & 0.001mm reading 0 10 with revolution counter complete with clamping devices and magnetic stand , standard make 963 electric spark lighter , standard make 964 oxygen gas pressure regulator double stage , standard make 965 thermometers 0 to 360 º c , standard make 966 resistance box 0 to 500 ohms , standard make 967 battery eliminator , standard make 968 rods with screw at one end for electrochemical equivalent 1 ) carbon 2 ) zinc 3 ) copper , standard make 969 joules calorimeter , standard make 970 steam generator ( copper ) cap. 500ml , standard make 971 boss head , standard make 972 asbestos wire gauge , standard make 973 stands with clamps for burette , standard make 974 spatula 8 , standard make 975 pointer puller , standard make 976 dead weight tester , standard make 977 pressure regulators with filter and input & output gauges , standard make 978 thermometer alcohol is glass , standard make 979 thermocouple type pyrometer with milli voltmeter with different types of thermocouples , standard make 980 radiation pyrometer with standard accessories , standard make 981 optical pyrometer with standard accessories , standard make 982 temperature switch , standard make 983 triple effect evaporator , standard make 984 orifice type flow meter , standard make 985 vortex flow meter , standard make 986 magnetic flow meter , standard make 987 thermal mass flow meter , standard make 988 turbine flow meter , standard make 989 solid flow measurement setup , standard make 990 static pressure and air purge level indicator , standard make 991 show piece ultra sonic level indicator , standard make 992 variable capacitance type level indicator , standard make 993 hook type level indicator , standard make 994 show piece for radar type level indicator , standard make 995 solid level measurement using ultrasonic level detector, microwave level detector, capacitance probe level detector, point type level detector. , standard make 996 ph meter digital , standard make 997 electronic weight balance capacity 10 kg. sensitivity 10 gram , standard make 998 viscosity meter , standard make 999 universal calibrator , standard make 1000 pressure safety valve ( spring tension ) , standard make...

Kisan Ramchandra Auctioneers Private Limited - Gujarat

7815753 auction sale of ms/cs cut pieces of various sizes plate scrap, cs welded tubular cut length various size scrap (below 2 mtr), cs seamless pipe cut pieces of various size scrap (below 2 mtr), ss material scrap & cut pieces ms/cs turning scrap, gi scrap (cut sheets, wire, ducting, angle, chennal, pipe & pipe fitting fabricated items and other obsolete items, etc) empty paints & solvent tins steel scrap of all sizes ms/cs/gi mixed packing strips, wire mesh,taar,patti scrap, etc. ss packing strips,wire, mesh,taar,patti,mixed scrap etc mixed aluminium scrap, cs/ gi hardware obsolete items scrap electrode and stub ends, welding consumables carbon steel obsolete item, welding consumables alloy steel obsolete welding consumables stainless steel obsolete welding consumables copper nickel obsolete, welding consumables aluminium obsolete, welding consumables flux obsolete various sizes mixed copper cable, scrap (lot reserved for the license holder cpcb/ gpcb), alu/gi armoured cable & welding cable mixed scrap, electrical obsolete itemsgarbage badly mixed of waste papers, plastic, polythene rubber, gunny bag, cotton rope, cloth items, belt & other miscellaneous items (wet & dry mixed), all type of wood/plywood deteriorated, crushed, used, waste, damaged scrap items (wet & dry mixed), scrap wooden saw dust (wet & dry mixed),, wooden slipper obsolete & deteriorated (wet & dry mixed), metalic mixture dust of burnt metal, powder hard lumps. etc, welding flux & metalic mixture dust mixed of burnt metal, powder hard lumps,etc,, welding flux dust sand blasting dust powder & hard lump,shot blasting iron dust powder & hard lump, gre/grp fitting obsolete items insulation obsolete items various types & sizes, fire blanket insulation obsolete items various size adhesives , sealant & solvent, obsolete various types (lot reserved for the license holder of cpcb/ gpcb) plastic/pvc empty carboys/ container scrap all sizes,, all type of plastic/ rubber/ pvc mixed scrap all sizes, obsolete items and tyre items wire spool plastic wheel scrap scrap rubber hose with steel wire fitting various types & size used & exposed redeography film lot reserved for the license holder of cpcb/ gpcb), oil used /waste oil (lot reserved for the licence holder of cpcb/ gpcb), paint and pigment waste (lot reserved for the licence holder of cpcb/ gpcb), insulation waste (lot reserved for the licence holder of cpcb/ gpcb), cable tray scrap (lot reserved for the licence holder of cpcb/ gpcb), battery electrolyte liquid obsolete lot reserved for the license holder of cpcb/ gpcb),...